HIP-Wastewater Revision-RT Refinery Only
HIP-Wastewater Revision-RT Refinery Only
1 RASTANURA 1.0 Piping Works- 1.1 Presence of 1.1(a) Secure necessary work permit.
REFINERY Installation of pipes in hydrocarbons from 1.1(b) Orient concerned employees for the
existing racks, crane existing lines. specific job hazards.
lifting 1.1(c) Gas test the immediate area as
RTR Plant Code: J37 applicable.
1.1(d) Comply with the requirements of GI
7.028 and GI 7.029.
1.3 Fall hazards from 1.3(a) Provide safe access and temporary work
heights. platforms, plus observance of 100 tie-off policy.
1.3(b) Full body harness, shock absorbing
lanyard and lifeline shall comply with SSH
safety requirements.
Hazard Identification Plan Upgrade Wastewater Treatment Facilities Saudi Aramco B.I. No. 10-03565 Revision 03 March 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Upgrade Wastewater Treatment Facilities Ras Tanura and Ju’aymah Terminals
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or structure.
1 RASTANURA 1.4 Lifting hazards i.e. 1.4(a) Use approved rigging plan as per GI
REFINERY Falling objects while 7.028.
lifting, failure of lifting 1.4(b) Assign Aramco certified crane operator
equipment, etc. and rigger; barricade lifting zone; provide
RTR Plant Code: J37 signboards.
1.5 Hitting to existing 1.5(a) Roll the pipe with roller in areas where
pipe crane accessibility is impractical. i.e. Be aware
of pinch points.
15.5(b) Beware of overhead power lines when
craning and maintain clear distance from live
lines.
1.5(c) When using crane near overhead power
lines, comply with the safety requirement of GI
7.028 and GI 2.702.
Hazard Identification Plan Upgrade Wastewater Treatment Facilities Saudi Aramco B.I. No. 10-03565 Revision 03 March 2005 2
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Upgrade Wastewater Treatment Facilities Ras Tanura and Ju’aymah Terminals
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or structure.
2 -do- 2.0 Excavations for 2.1 Accidental damage to 2.1(a) Secure RT Refinery Excavation Permit.
pumps, fan, and existing utilities, 2.1(b) Secure necessary work permits.
various activities especially those not 2.1(c) Orientation of concerned workers to
depicted on drawings. specific job, hazards, and controls.
2.1(d) Apply trial or exploratory pit/trenching
around the area to ascertain location of UG
utilities.
2.1(e) Use manual excavation only for
exploratory pit/trench to expose the
installations.
16.1(f) Use only plastic shovels for suspected
UG power cables.
2.1(g) Apply standard shoring as per SACSM.
16.1(h) Provide 2 feet clearance of soil and
other materials from excavation walls.
Hazard Identification Plan Upgrade Wastewater Treatment Facilities Saudi Aramco B.I. No. 10-03565 Revision 03 March 2005 3
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Upgrade Wastewater Treatment Facilities Ras Tanura and Ju’aymah Terminals
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or structure.
3 -do- 3.0 Excavation of 3.1 Damage to UG 3.1(a) Secure necessary work permits.
Roads, Road Crossings utilities 3.1(b) Orientation of concerned workers to
for pipe installations specific job, hazards, and controls.
3.1(c) Use only plastic shovels for suspected UG
power cables.
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or structure.
4 -do- 4.0 Construction 4.1 Fall from heights 4.1(a) Provide safe access and temporary work
Activities at Elevated platforms, plus observance of 100 tie-off policy.
Locations 18.1(b) Scaffold construction should pass
Aramco requirements described in SSH.
4.1(c) Full body harness, shock absorbing
lanyard and lifeline shall comply with SSH
safety requirements.
5 RTR-Electrical 5.0 Electrical-related 5.1 Electrical hazards 5.1(a) Ask for work permit.
Locations/Tie-Up activities such as cable during tie-up or 5.1(b) Observe electrical lock out and tag out
Points trenching, cabling, etc. termination. practices.
5.1(c) Closer supervision and coordination.
RTR Plant Code: J37 5.1(d) Use complete PPE including proper
ladders, etc.
Hazard Identification Plan Upgrade Wastewater Treatment Facilities Saudi Aramco B.I. No. 10-03565 Revision 03 March 2005 5