AREA 1 W
@ GL. A'-F/1-6 :
S
TO BE EXCAVATED FROM
ELEV. -0.15m DOWN TO ELEV.
5000
-3.72m, AFTER SHEET PILE
DRIVING IN ZONE 1 2875 5000 1000

250

EL. -3.72 M

500
EL. -3.72 M EL. -3.72 M
500 355

750
3670 EL. -7.32 M
500

500
2225

3749
4285 140 500
500

500
250

500
500
969
300
500

2847
EL. -3.72 M
EL. -8.67 M 500

ZONE 2

500
EL. -3.72 M
500

D ZONE 1 EL. -10.47 M EL. -8.67 M D

EL. -3.72 M
3022

3503
5101

500 500

500
500
500 EL. -3.72 M 500
500
EL. -3.72 M 500
500

3670

AREA 2
@ GL. A'-F/1-6 :

TO BE EXCAVATED FROM ELEV.


-0.15m DOWN TO ELEV. -8.67m,
AFTER SHEET PILE DRIVING IN ZONE
1 AND EXCAVATION IN AREA 1

SCALE: NTS

JQ INTERNATIONAL ENGINEER : PROJECT TITLE PROJECT OWNER REVISIONS SHEET CONTENTS : SHEET NO.:
CONSTRUCTION INC. DATE :
PROPOSED AVENIDA TOWERS 01
2nd Floor Unit 206 BTTC Center, 288 Ortigas
Avenue Corner Roosevelt Street Greenhills
1502 San Juan City REG. NO. : TIN :
AND COMMERCIAL CENTER APPLELAND REALTY CORP.
CAD :
SP
CHECK :
Tel. No.:470-1039/ 239-5612 ; Fax No.: 239-6282
LOCATION : PROJECT NO.:
jqincaaa@gmail.com PTR. NO. : ISSUED : RIZAL AVENUE COR. SOLER STREET, MANILA
APPROVED :

You might also like