General Notes: JG Summit Osbl Stage 1 Expansion Project Electrical 480V MCC Single Line Diagram
General Notes: JG Summit Osbl Stage 1 Expansion Project Electrical 480V MCC Single Line Diagram
GENERAL NOTES
TO MR-0000-411
(COMMON ALARM) (COMMON ALARM)
SEE DWG. A4-JGS1EP-A7MI-G00-EL-65-003 SEE DWG. A4-JGS1EP-A7MI-G00-EL-65-003
FROM PDP-0000-410 3Ø 3W 480V 60HZ 1. MOTOR FEEDERS SHALL BE EQUIPPED WITH EOCR FOR GROUND FAULT AND OVERLOAD, SINGLE PHASING
AC 230V FOR LTG. (IF ANY), RECEP. & HEATER FROM SG-0000-312A-F1 LP-MCC0000311-A1
LP-MCC0000311-B1 PROTECTION.
SEE DWG. NO. A1-JGS1EP-A7MI-G00-DD-65-494 SEE DWG. NO.
LP-MCC0000311-C1 C8-MCC0000311-01
A1-JGS1EP-A7MI-G00-DD-65-072 C4-MCC0000311-01 2. MOTOR FEEDERS SHALL BE EQUIPPED WITH TIME DELAY DROP-OUT(TDDO) AND TIME DELAY PICK-UP(TDPU)
LP-MCC0000311-A2
C4-MCC0000311-02 RELAY FOR AUTO RESTARTING FUNCTION.
LH-MCC0000311 LP-MCC0000311-B2
LP-MCC0000311-C2 C8-MCC0000311-02
LP-MCC0000311-PE 3. LOAD SHEDDING FOR EACH MOTOR SHALL BE CONTROLLED BY PMS.
480V MCC FOR OSBL
(IN SUBSTATION)
4. EOCR WILL HAVE CURRENT MEASURING FUNCTION.
MCC-0000-311
(NOTE 9) V 5. EACH INDICATION DEVICE WILL BE INSTALLED ON FRONT SIDE OF MCC.
3xPT
480V 110V 0~600V
3 3 6. COMMON ALARM OF MCC WILL BE MONITORED AT PMS.
3xCT
A
2000/5A
CL.1.0 0~2000A 7. UTILITY POWER AND EMERGENCY POWER SHALL BE SYNCHRONIZED WHEN UTILITY POWER RECOVERS.
2000A, 480V, 3 PH, 3W, 60 HZ, 65kA, 1 SEC
8. MCCB FOR LV POWER DISTRIBUTION SHALL BE EQUIPPED WITH 3-PHASE SOLID STATE TRIP DEVICE, AND
FUNCTIONS OF TRIP ELEMENTS ARE AS FOLLOWS;
MCCB MCCB MCCB MCCB MCCB
(NOTE 8) (NOTE 8) (NOTE 8) (NOTE 8) (NOTE 8) "LT" - ADJUSTABLE LONG TIME DELAY TRIP ELEMENT.
"ST" - ADJUSTABLE SHORT TIME DELAY TRIP ELEMENT.
"IT" - ADJUSTABLE INSTANTANEOUS TRIP DEVICE.
"GT" - ADJUSTABLE GROUND FAULT TRIP DEVICE.
9. FEEDER TYPES SHOWN IN THE SINGLE LINE DIAGRAM DENOTES INCLUDED COMPONENTS ONLY. FOR
A
CUBICLE COMPLETE AND DETAILED INFORMATION, REFER TO THE LATEST VENDOR DATA.
1 1 1 1 2 1 2 3 4
PMS
IRP
A
18 G-3016A MIXED LPG LOADING PUMP 18.50 3 MCCB 160/32 LP-G3016A C1-G3016A C4-MR0000411A-56 C5-IRP0000411-56 MR-A1 A1-JGS1EP-A7MI-G00-DD-65-855 -
19 - SPARE (MOTOR) - 3 MCCB 160/52 - - - - MR-A1 - - 1 15-MAY-19 ISSUED FOR CONSTRUCTION LIB RBC OEB / TR
20 G-3028A ISOBUTANE LOADING/START-UP PUMP 45.00 3 MCCB 160/100 LP-G3028A C1-G3028A C4-MR0000411A-13 C5-IRP0000411-13 MR-A1 A1-JGS1EP-A7MI-G00-DD-65-812 - 0 28-SEP-17 ISSUED FOR CONSTRUCTION FJG RBC RDO / ELJ
21 - SPARE (FEEDER) - 3 MCCB 250/250 - - - - FR-A - - REV DATE DESCRIPTION DRAWN CHECKED APPROVED
ELECTRICAL
480V MCC SINGLE LINE DIAGRAM
MCC-0000-311 (G03 - SG-SUB-110)
FORMAT DWG NO. SCALE : NONE
SHT NO. REVISION
A1 A1-JGS1EP-A7MI-G00-DD-65-080 1 OF 1 1