Professional Documents
Culture Documents
GRAND TOTAL
WORKING PLAN WINDOW
Irrigation Engineer
Environmental Engineer
Agronomist
Reviewing feasibility study report
Agricultural Economist
Proposed team and detailed desgn of the irrigation Nill
Water Resource Engineer
scheme
Hydrologist
Agricultural Land Surveyor
Civil Engineer
Perdiem and
Review
Proposed Team Read with Feasibility
feasibility study Reviewing feasibility study report
Irrigation Engineer study repot ,
report
Transport
Perdiem, detail
Review detailed
Proposed Team Read with Reviwing detaileddesgn of the design of the
desgn of the
Irrigation Engineer scheme irrigation
scheme
scheme
Asset ownership
Nutritional status of the family
Change in living conditions Perdiem and
Ability to pay school fees Feasibility
Assessment of Employment creation study repot
Socio-economic Proposed Team Read with Detail design
Advancement of women
performance Irrigation Engineer report and site
indicators Backward and forward linkages visit for data
Food security status of the area collection ,
Improvement in service provision Transport
Appropriateness of technology
Adoption rate of technology
Cost of energy
Cost of water
Other costs, for example hiring
security guard
Office/Proposed
site
1 5 100000 500000
Office/Proposed
site
8 70 0
Office/Proposed
site visit for
observation and
data collection
8 30 100000 3000000
Office/Proposed
site
8 10 100000 1000000
Office/Proposed
site visit for
observation and
data collection
observation and
data collection
8 10 100000 8000000
Office/Proposed
site visit for
observation and
data collection
8 14 100000 11200000
Office/Proposed
site visit for
observation and
data collection
8 14 100000 11200000
Office/Proposed
site visit for
observation and
data collection
Office/Proposed
site visit for
observation and
data collection
8 14 100000 11200000
Office/Proposed
site visit for
observation and
data collection
8 14 100000 11200000
Office/Proposed
site visit for
observation and
data collection
8 14 100000 11200000
132 68500000
S/N
1
3
Reccommended activity/ Task Currency Amount
Work with the BD AND Develop team in reviwing feasibility
TZS 4500000
study report and detaileddesgn of the scheme
Assist/Provision guidance to the team in design the project for TZS 33600000
financing following expert review and assessment of the scheme
GRAND TOTAL 68500000
Annuall rainfall
Year Annual rainfall at A B C D E
1926 32.9 39.8 45.7 30.7 37.4
1927 28.1 39.6 38.5 41 30.9
1928 33.5 42 48.3 40.4 42
1929 29.6 41.4 34.6 32.5 39.9
1930 23.8 31.6 45.1 36.7 36.3
1931 58.4 56.5 53.3 62.4 36.6
1932 46.3 48.1 40.1 47.9 38.6
1933 30.8 39.9 29.6 32.7 26.9
1934 46.8 45.4 41.7 36.1 32.4
1935 38.1 44.9 48.1 30.7 41.6
1936 40.8 32.6 39.5 35.4 31.3
1937 37.1 45.9 44.1 39.2 44.1
1938 50.7 46.1 38.9 43.3 50.6
1939 46.9 49.8 41.6 49.9 41.1
1940 50.5 47.3 49.7 47.9 39
1941 34.4 37.1 31.9 32.2 34.5
1942 47.6 42.3 38.2 52.4 47.3
1960
1961