You are on page 1of 1

3@0.05m; 3@0.10m; 3@0.15m REST @ 0.18m o.c.

DETAIL OF FOOTING FC1


SECTION 2-2
(SCALE 1:25)
FTB1

1.00
EL. 0.25

EL. 0.00

8-16mmØ VERT. BARS


1
N.G.L.
F.F.L.

6-16mmØMATTING B.W.

W/ 10mmØ TIES

50 THK PCC
0.30

0.05
0.25 1.00 0.10

FOOTING F2C1- PLAN


2.90

50mm THK GRAVEL BED

1.00
16mmØ MATTING B.W.

50mm THK PCC

2
0.05
1.00
3@0.05m; 3@0.10m; 3@0.15m REST @ 0.18m o.c.

DETAIL OF FOOTING FC1


SECTION 1-1
(SCALE 1:25)

1
FTB1

1.00
EL. 0.25

EL. 0.00
N.G.L.
F.F.L.

0.30

2.90 0.25 1.00 0.10

SEAL PROJECT TITLE: PROJECT OWNER: DESIGNED: SHEET NUMBER

MICHELLE ANN G. CUBILLO, uap A PROPOSED DRAFTED :

BEDROOM RENOVATION AND


S-02
REGISTERED ARCHITECT

LEEO DESIGNS
THIS DRAWING, AS AN INSTRUMENT OF SERVICE, IS A PROPERTY OF
THE ARCHITECT. AS SUCH, IT MUST NOT BE REPRODUCED OR COPIED
REG. NO. : 0043455 DATE : 07.25.2018 BATHROOM EXPANSION MRS. MARIA MINERVA B. PARMAN
DATE :

MARCH 2021
IN PART OR IN WHOLE WITHOUT PERMISSION. ALL DRAWINGS MUST BE
RETURNED TO THE ARCHITECT WHEN NO LONGER IN USE. PTR. NO. : 7707374 DATE : 02.10.2020
ADDRESS: MALIGAYA HOMES, SAN ISIDRO, CALAPE, BOHOL, 6328 TIN. : 476-525-088 BOHOL LOCATION: CATMONAN, CALAPE, BOHOL LOCATION: CATMONAN, CALAPE, BOHOL

You might also like