You are on page 1of 2

SOLAR PROJECT PROPOSAL – SV PITTIE TEXTILES, SOHAR

Electrical – Observations & Scope of Work

Observations:

1. Locations
1.1. Spinning Unit-2
1.2. Training centre/Admin block
1.3. Open End Unit (Phase-1)
2. At present the plant is fed by 3 Nos. of 11kV sources from 2 x 20MVA PSS of Majan Electricity Co.
(MJEC) located near SVP.
3. 3 Distribution stations (415V) are located in SVP namely DSS-1, DSS-2 & DSS-3.
4. Total connected load at DSS-1 is 3MW
5. Total connected load at DSS-2 is 6MW
6. Total connected load at DSS-3 is 6MW
7. Hence the total connected load for the Plant is 15MW. This demand comes down to 7.5MW at night
times due to the process requirements.
8. SVP advised that Solar PV power generation may be of maximum 7.5MW capacity as per MJEC’s
instruction.
9. Solar PV panels shall be installed on the roof of all 3 locations.
10. Inverter room shall be constructed separately and location will be identified by SVP.
11. Solar power shall be hooked up to the existing LV systems (415V) available at 3 DSS.
12. Existing LV switchgear can be extended with new Incomers and space availability has been checked.
13. Solar PV system shall be designed to serve the plant during peak loads in day time. No energy
storage is proposed. At night times, the plant will continue to receive power from MJEC grid.
14. Synchronization between MJEC source and Solar PV will be finalized by SVP.

Scope of work (Electrical)

1. PV arrangement and string layout


2. Key Single line diagram
3. Single line diagram for each Hookup point
4. Overall cable trench/routing layout
5. Overall grounding layout & details
6. Inverter building equipment layout
7. Inverter building cable trench layout
8. Inverter building earthing layout
9. Inverter building lighting & small power layout
10. LV cable sizing calculation
11. LV cable schedule
12. Protection relay setting at 415V LV Switchgear for Solar incomer at SVP DSS-1,2 &3
13. Protection relay setting at 11kV Switchgear (MJEC PSS) if required.
14. Purchase specification / Data sheet
15. Bill of Quantities
16. Scope of work document.
17. Load flow analysis study (optional – will be included separately if required by client)
18. Short circuit study (optional – will be included separately if required by client)

Scope of work (Civil)

1.

Scope of work (External Authorities Approval)

1. Key single line diagram from MJEC


2. PV arrangement and string layout from Civil Defense/ROP
3. Co-ordination with MJEC

Scope of work (Project)

1. Engaging PV vendors/specialist as RITAJ’s Subcontractor.

Scope of work (PMC)

1. Vendor drawing review


1.1. LV Incomer panel
1.2. Solar PVs
1.3. Inverters
2. Construction Supervision
3.