THE DUTIIES OF A WELDING INSPECTOR:
My duties as a welding inspector are involved before, during and after welding.
Before welding:
+ Allapplicable documents are checked, «
= Application standard is up to date with the latest edition, revision or amendment;
= The drawings is clear and issue number is marked;
Welding procedure sheets (specifications) is available and has been approved as required
by authority and is employed in production;
Welder qualification with identification and range of approval are verified and that only
approved welders as required are used in production;
Safety permits such as gas free (entering enclosed space) certificate, hot work permit are
available and valid;
Calibration certificates, material certificates (mill sheets) and consumer certification are
available,
Quality plan ‘is authorized and endorsed with signature, date and company stamp;
Parent material identification is verified against documentation and markings;
Material composition, type and condition are checked;
Identification of welding consumables such as electrodes, special drying requirements for
electrodes, filler wires, fluxes, shielding and backing gases are verified correct;
Plant and equipment are in a safe condition and adequate for job;
Correct methods are applied in cutting and machining;
Dimensions, tolerances, preparation, fit-up and alignment are in accordance with approved
drawings;
* — Cleanliness is maintained,
+ Preheating for any tack welding is in accordance with specified procedure;
During welding:
+ Welding processes such as root pass and tack welds must be monitored and inspected;
+ Welding should be completed without undue interruption and within specified period;
+ Hot pass must be timed;
+ Essential variables such as current, voltage, travel speed and number of runs must be
monitored;
Inter-pass cleaning, temperature and run sequence should be inspected (roving
inspection),
Welding is in compliance with welding procedure sheet and application standard.
After welding:
Dimensional accuracy must be checked;
Visual inspection is carried out to ascertain acceptability of appearance of welds;
Post weld heat treatment if any should be monitored and recorded.
NDT report is assessed;
Delayed inspection is carried out 72 hours later to check hydrogen'(Hz) cracking;
Factors influencing the formation of weld defects and their acceptability in relation to the
written specification are appreciated.
If repairs are required then
Procedures and welder codes should be authorized.
Defect area should be marked out positively and clearly.
Partial and fully removal should be monitored with visual inspections and NOT.
Re-welding should be monitored and re-inspected (visual and NDT)
Benoe
Collate all documents and reports, pass on for final inspection, approval and sioraye.THE WELDING INSPECTOR
RESPONSIBILITIES
ENSURE ENSURE ENSURE
COMPLIANCE WORKMANSHIP WELDING
TO STANDARD OR CODE CRITERIA BY
| “POLICING” WORK &
(DOCUMENTATION)
| > ATTRIBUTES
HONESTY ureracy FITNESS
INTEGRITY
| PHYSICAL EYESIGHT
l
Se oyries
OBSERVE
MEASURE
IDENTIFY
BEFORE DURING AFTER
WELDING LDING
MATERIAL VOLTAGE
CONSUMABLES AMPERAGE
WELDING PROCESSES TRAVEL SPEED ASSESSMENT
JOINT FIT UP INTERPASS TEMPERATURE NDT
PREHEAT INTERPASS CLEANING ASSESSMENT
TACK WELDING/CLAMPING
ALLIGNMENT
CALIBRATION
SAFETY
ee _
y
ACCEPT REJECT
, Rena
COLLECT & COLLATE
ALL, DOCUMENTS: 1.D. AREA
MARK OUT v
WHICH MAY INCLUDE: REMOVE CONCESSION
CODE OR STANDARD RE-WELD
MATERIAL CERTIFICATES RE-INSPECT
CONSUMABLE CERTIFICATES
CALIBRATION CERTIFICATES
DRAWING(S)
WELDING PROCEDURES
APPROVAL CERTIFICATES
INSPECTION RECORDS ACCEPTANCE OF THE PRODUCT
P.W.H.T. RECORDS: +
OTHER TEST RECORDS
CONCESSIONS INSPECTOR PASSES THE
COMPLIANCE CERTIFICATES
DOCUMENT PACKAGE TO A HIGHER
AUTHORITY FOR FINAL APPROVAL5.7 Welding positions
Fos tne purpose of his standard the welding positions identified in figures 1 and 2 shall apply faccording to ISO 6947). Angles
af slope and rotation for straight weids in the welding positions shall be in accordance with {SO 6247,
» Yartical cownwards
/
M taeneenas
used in the approval test shall be based on the same tolerances as used in production,
|
PC Horizontal vertical
PE Ovemead
PF Vertical upwards
) Burt walds
SS
>
x
P83 Horizontal vercal
J
PO Monzontal over
I Filter wales
Figura 1: Walding positions tor platesWELDING POSTTIOKS (8S 499:1991/7S0 8347)
/ Overhead
Po
cal overheadSEN 287
IBSEN ISO 5817
HSEN 22553
BSEN STANDARDS
"| WELDING PROCEDURE
_| aluminium)
DESCRIPTION
VISUAL INSPECTION OF FUSION
JOINTS.
QUILIFICATION TEST (for steel &
WELDER QUALIFICATION TEST
(aluminium) —
WELDER QUALIFICATION
(steel) .
APPECPTANCE CRITRIA (Lor sti
WELDING SYMBOLSAWS System
American Welding Soclety Specification: ANSI/AWS AS.1-81
Glsuincaion | Teraiesirength | Vild peng
Wem! cae Niroeat
tare “20 Pr
eon 0 So
econ “so x0
con} o 30
tore = xo
ton & ae
0 $0 +
Electrical charecterfatics
Cavsiicaton. | AC
Positive | Negative
Eeor0
wor fy | f
feo |
corn | Gi
£6070
F602?
wore
e705
E016
018
7
e077
7028British Standards System
BS specification: BS 639: 1986
inst Grour coveniua emnenucy
Minimum vad : Indiaiee
Sevan feans, Nl? a ediogen
Pry t iter convoled
7 § | cxtsing (<15m009)
£6 | aosse x0 R_ | athe (medium coatedt
&1_| si06s0 30 fn
fon [Tomes] [1 tear] Brean [Rimata
eel eee | Renate |
ae ee ee eS te nrc | Micro
ei :
° Not wpecified § | Rat vertical down and, for fillet welds, Lata
a mn horizontal vertical ‘Polarity a8 Not suitable for
2 & 9 | any position or combination of positions not recommanded | use on AC
2 2 classified sbove by manutece
a a @ | new
hale __|
| poset 7)
sca) eapsee ryt z
calcu aS y
Tales 7
cul picorons 4 z
¢ Per aie z
eae | |
a 4 = =
‘aes tty ae
alee
i| 3They att | ents seopensetton
aN
dts
oa.
0} 0.9 -
ua =
> t-29]— saan raetieemtetat
ha 2-06 fos. es
Arg other sgreed compoaltion te a
ms fis
C= eullete covering
> rae reine
AR ~ eve tNck covering
RC » evtlecedilede coeing
RA = eutdens covering
RB = rude bade crering
eres cae
- 816.3 IN B 54 Hi
a i potions:
2) at potions, exeen vee dow:
2) Mat but weld, a et wel,
wert fle welds
(1 buts wee, fat tee wel
5 weal down tnd positions scnting to
mbel 3
tos
wssis fee ae
W210 Jae ede
nse daePrime
cracking modes fm Steel
Key words
06-02-01
AB Whitaker
Hydrogen induced HAZ or weld metal cracks, Key words:
Cause:
Prevention:
Hydrogen. Moisture. Consumable type. Absorbtion. Paint. Oil,
Solublity. High hardenability. HAZ hardness. Martensite. Diffusion.
Transformation, Hardness. Stress concentrations. Weld toes.
Delayed inspection 48 hours after welding.
The four critical factors and levels,
>15ml H?, VPN > 350, Temperature < 300. Stress > 0.5 YS
Hydrogen Weld metal cracking (High strength low alloy steels)
[Rereased carbon content to match of parent metal strength.
Higher hardenabilty in the weld metal. Transverea, cracks
Preheat. Hydrogen control, Consumable checks. Low H? Process,
Restraint. Remove plate coatings. Control of stable, arc length.
Are energy. Joint design. Carbon equivalent 1 content.
Austenitic stainless steel weld metal,
Solidification cracking in C/Mn steels, Keywords;
Cause:
Prevention:
Sulphur. Fe/Sulphides. Weld centreline. Contraction.
Low m. p. flms. Contractional forces. Lose of cohesion,
faut Strength hot shortness of solidifying weld meter
High Mn/S:Carbon ratio
Manganese. Low dilution processes, Lower carbon ratio,
Restraint. Avoid aluminium deoxidised wires. Low sulphur Plate.
Minimise contractional Strain.
Lamellar tearing in C/Mn steels, Key words:
Cause:
Prevention:
Poor through thickness ductility. Below HAZ.
Plastic strain. Sulphur laminations and bands. Contraction
T joints. Comer joints. Stepped like crack.
uttering layers. Contraction gap. Fillet welds, Re-design
Dornier plates, Reduce restraint. Control heat input.
Maximise ductility in weld metal and minimise Strain.