Professional Documents
Culture Documents
Option 1: Option 2:
Voice Streaming Audio Broadcast Teleconference (Dial In)
• No need to dial in on a telephone • Requires telephone to dial in
• Questions can be asked in the WebEx Chat • Questions can be asked over the phone or in the
panel WebEx Chat
• Details • Details
– Conference ID: “Oracle OPM”
– International dial in: +1-706-758-7972
– US Free call: 1-866-627-3315
– List with national toll free numbers is available
in Doc ID: 1148600.1
– View anytime during the conference using
Communicate > Teleconference > Join
Teleconference from your WebEx menu
Upcoming: Outside Processing (OSP) for OPM in 12.2.4
Copyright © 2015 Oracle and/or its affiliates. All rights reserved. | 2
Upcoming Advisor Webcast Schedule
• Implementation Considerations
• Phase 1: Outsourcing at
Drop Ship
Components
OEM B C MP A
Manufacture Assembly Process
RMS
B
Buy Components B C
A RMS A
• Non-Chargeable RMS
B
Subcontracting B
Buy Components
B C
B
Buy Components C
C
C
Batch Recipe
Process Routing
Formula
Step 10
Step20
Ingredients Product
Step 30
Outside Process 20 20
In-House Process 30
Receive
Appl.
OPM OPM Procurement Procurement OPM
• Creation of Purchase Requisition allows cross referencing the Batch Step Number.
• PO Line is Batch Step Number aware at all times, as it is created from the same Purchase Requisition.
• Batch Step can be queried at any time to inquire about receipt of PO Line.
• To identify the step for outside processing and payment of services according to either number of units/products
or resource usage hours.
• Synchronization of Batch and Purchase Order Changes
•Batch quantity and date changes to be propagated to PO
• Costing of the OSP resources either at Standard Cost or PO price
• OPM Outside Processing Report to view various batches with OSP steps and corresponding PO details.
Batch Step
Create Batch Create/Approve Req
OSP -
Process Create /Approve PO
Release Batch
Receive OSP Item
• Costing Methods
– Standard, Actual and Lot Costing
• Resource Costing
– OSP Resources will be valued in all costing methods at standard resource cost or actual PO price, based on the cost source
setup
• Batch Completion
• Products in Standard Costing organizations will have OSP cost as the standard cost defined for the OSP Resource
• Products in Actual and Lot costing organizations will acquire their OSP cost on batch completion, as either the resource cost or
PO price depending on the Cost Source setup.
• Batch Close
– On batch close in Standard Costing, the difference between standard resource cost and PO price will be relieved as batch close
variance, if cost source is defined as PO price.
• OPM Process Execution User's Guide – Release 12.2 - Part No. E49068-04
See Chapter 10: Outside Processing in Oracle Process Manufacturing
Accreditation Program Pages Fully leverage support capabilities Stay Informed | Analyzer Scripts |
delivered via My Oracle Support | Workflow Analyzer | Period Close|
• Program Index – 1583898.1 high-value best practices | efficiency Patching | Certifications | Upgrade
• E-Business Suite – 1580100.1 with Oracle tools = more time spent Advisor | Comparison Reports.
on primary role.
https://community.oracle.com/thread/
3570481
Q&A panel
3
Send your question
2
Ask: ALL PANELLIST leave default!
1
type your question here