PROJECT: A-11180-REINFORCEMENT OF 33KV NETWORK IN AL AIN CITY AREA.

Client AADC Site Ref.


Consultant OLP Feeder No.
Contractor Lindenberg Emirates LLC Date of Test
SAT REPORT FOR EARTH RESISTANCE MEASUREMENT

Measured Voltage GPR


Injected GPR Earth
Sl. Distance at max fault
Current at 100 A Resistance (Ω)
No# (m) current
I (A) V0 (V) V1 (V) V2 (V) V (V) Rg = V / I
Vg (V)
1

10

11

12

13

14

15

16

17

18

19

20

TEST CARRIED OUT BY TEST WITNESSED BY TEST APPROVED BY


Signature: Signature: Signature:
Name: Name: Name:

Date: Date: Date:

Contractor: LINDENBERG – EMIRATES Consultant: OLP Client: AADC

A11180 SAT report Page 1 of 1