SCHEMATIC FOR FIRE PUMP CONNECTION

AS PER IFC REV-2 (ISSUED AT 26/01/2020) REQUIRED AS PER CONRAD

OPTION-1 OPTION-2
(SEPARATE ATS + CONTROLLER) (ATS + CONTROLLER - INTEGRATED)

Tx-1 800 KVA DG Tx-1 800 KVA DG Tx-1 800 KVA DG Tx-1 800 KVA DG

~ ~ ~ ~

LOCATION: BASEMENT - 1 - LV ROOM LOCATION : BASEMENT - 1 - LV ROOM


LOCATION : BASEMENT - 1 - LV ROOM LOCATION : BASEMENT - 1 - LV ROOM

MP-1 MP-1 EMP MP-1 EMP MP-1 EMP


ACB ACB ACB ACB ACB ACB ACB
TPN TPN TPN

1600A MCCB MCCB MCCB MCCB 1000A MCCB MCCB MCCB 1600A MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB 500A 63A 500A 500A MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB 500A 63A 500A 500A MCCB MCCB MCCB MCCB MCCB
ACB MCCB ACB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB

1C,4R 1000mm2 CU/MGT/XLPE/LSF/SWA/LSF


1C,7R 500mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,240mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,240mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,240mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,240mm2 CU/MGT/XLPE/LSF/SWA/LSF
CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY


SMP-MOA+ROA SMP-COA
AMF-G1-1 AMF-G1-2 AMF-G1-1 AMF-G1-2
OTHER LOADS OTHER LOAD OTHER LOAD

OTHER EMERGENCY LOAD OTHER EMERGENCY LOAD

1C, 7RUNS OF 1C 500mm² 1C, 7RUNS OF 1C 500mm²


CU/MGT/XLPE/LSF/SWA/LSF CU/MGT/XLPE/LSF/SWA/LSF
CABLE + ECC IN TRAY CABLE + ECC IN TRAY

ATS AMF-G1-1 AMF-G1-2

1C, 7RUNS OF 1C 500mm²


CU/MGT/XLPE/LSF/SWA/LSF
CABLE + ECC IN TRAY

EMP ESMP-MOA+ROA ESMP-COA


ACB ACB ACB
TPN TPN TPN

63A 500A 500A MCCB MCCB MCCB 63A 500A 500A MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
MCCB MCCB MCCB MCCB MCCB MCCB
4C,240mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,240mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,240mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,240mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,240mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,240mm2 CU/MGT/XLPE/LSF/SWA/LSF
4C,25mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,25mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,25mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C,25mm2 CU/MGT/XLPE/LSF/SWA/LSF
OTHER EMERGENCY LOAD OTHER EMERGENCY LOAD OTHER EMERGENCY LOAD
CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY


63A 500A 500A 63A 500A 500A
W W W W W W
TPN TPN TPN TPN TPN TPN U/L LISTED
ISOLATOR DELETED ATS ISOLATOR DELETED
NEW ATS

ATS U/L LISTED NEW


CONTROLLER WITH
JPC FPC FPC JPC FPC FPC FPC JPC FPC EXISTING FPC JPC FPC BUILTIN ATS

JP FP FP JP FP FP FP JP FP FP JP FP
(D) (SB) (D) (SB) (D) (SB) (D) (SB)

LOCATION: BASEMENT - 2 - PUMP ROOM LOCATION: BASEMENT - 2 - PUMP ROOM LOCATION: BASEMENT - 2 - PUMP ROOM LOCATION: BASEMENT - 2 - PUMP ROOM

NOTES:-
1. ONLY CABLES/BREAKERS/DEVICES RELEVANT TO FIRE
PUMP CONNECTION IS SHOWN IN THIS SCHEMATIC

ABBREVIATIONS:-
1. FPC - FIRE PUMP CONTROLLER
2. JPC - JOCKEY PUMP CONTROLLER
3. FP - FIRE PUMP
4. JP - JOCKEY PUMP
5. D - DUTY
6. SB - STANDBY