Professional Documents
Culture Documents
ENTRANCE ADDITION K
SECURITY ALARM SYSTEM KEYPAD
E.RWP
MOVEMENT
STARTER TIES
BT MASTER SOCKET
RWP
STAT
A DIS WC/SHOWER EMERGENCY ALARM BEACON/SOUNDER TO B.
AMBULANT
DRYER
CUBICLE
CCTV DVR
gully LS 7 7 REGS PART M2 5.4h
74.72 EXISTING BT
MSH3 MSH2 MSH1 gully
74.76
MASTER TO BE
7 7 7 RELOCATED TO DIS WC/SHOWER EMERGENCY ALARM RESET BUTTON TO B.REGS
E 7 WASH E 7
HERE
E
ENTRANCE R PART M2 5.4h
LOCATION OF
ELECS MALE WC
OUTLET
MWO 6 LS 6 E 6 DH 6 LS 1
B POSSIBLE NEW B
ASHP(s) IF 7 7
DW TEA OFFICE
REQUIRED GULLY MWO INTERNAL LIGHTING
CHANNEL
FR
STATION
x2
2xLOCKERS
2xLOCKERS
2xLOCKERS
2xLOCKERS
7 * NOTE ELECTRICAL CONTRACTOR TO UNDERTAKE FULL
FR ILC ELC LIGHTING LUX DESIGN WITH LIGHT MANUFACTURER TO
E 1 DETERMINE WATTAGE REQUIREMENTS OF ALL FITTINGS, WITH
LIGHT POSITIONS TO BE ADJUSTED ACCORDINGLY AS REQUIRED
MH
MAIN BY DESIGN TO APPROVAL OF MJB ARCHITECTURE.
CL 74.61
POOL ACCESS DUCTWORK/SERVICES ROUTE EJ
COMMUNITY
DRINKS
FROM EXISTING PLANT ROOM TO K EJ
CENTRALISED INTERNAL LIGHTING CONTROL SYSTEM TO
POOLSIDE NEW CEILING VOID IN MAIN
FE
HALL ADDED AS ILC
CONTROL ALL NEW INTERNAL LIGHTING WITH TIMER, AND
OVER-RIDE ON/OFF CAPABILITIES PAIRED WITH INDIVIDUAL PIR
ENTRANCE ADDITION (VIA
IC IC
ENCASEMENT BELOW EXISTING EJ RWP LATER PHASE LIGHT SENSORS FOR EACH CIRCUIT - SYSTEM TO ALLOW FOR
FULL ADAPTATION BETWEEN USE OF EITHER TIMER OR PIR
IC IC FLAT ROOF JOISTS)
EJ SENSOR CONTROL TO EACH LIGHTING CIRCUIT.
1 1 1
IC
TV LS
PIR LIGHT SENSOR TO SWITCH LIGHTS - NUMBER DENOTES
CIRCUIT - ALL INTERNAL LIGHTS
1700mm ABOVE
FFL FOR WALL WHITECROFT MIRAGE 3 C165 IP65 DOWNLIGHTER, WARM
VIEWING/WAITING AREA MOUNTED TV WHITE 3000K, WHITE BEZEL. E DENOTES INTEGRAL 3 HOUR
LS 1 DS EMERGENCY PACK TO BS 5266 VERSION. NUMBER DENOTES
CIRCUIT. ELECTRICAL CONTRACTOR TO ARRANGE LIGHTING
LAYOUT AND DESIGN BY MANUFACTURER TO DETERMINE
WATTAGE REQUIREMENTS TO EACH FITTING - NOTE WILL
LIKELY DIFFER FOR EACH ROOM/SPACE.
EXTERNAL LIGHTING
E 1 1 1
1500x1500mm WHEELCHAIR
MECHANICAL VENTILATION/HEATING-COOLING AND PLUMBING
TURNING SPACE
BONDING
PROVIDE FULL EARTH BONDING TO LATEST IEE WIRING
E.RWP REGULATIONS ONTO ALL PLUMBING PIPEWORK AS REQUIRED.
MOVEMENT
STARTER TIES 2xLOCKERS
SYSTEM TO BE AN EXTENSION OF EXISTING/LINKED TO EXISTING, FULLY ZONED SYSTEM CCTV SYSTEM DESIGNED AND SPECIFIED BY SPECIALIST, FULL DETAILS TBA. E 5 5
WITH INDIVIDUAL CIRCUITS TO ALL AREAS WITH CENTRAL PANEL ADDRESSABLE PANEL PROVIDE PERIMETER COVERAGE EXTERNALLY AND SOME INTERNAL COVERAGE, FSH2 2xLOCKERS
TO IDENTIFY EACH AREA SEPARATELY AND PROVIDE INDIVIDUAL AND COLLECTIVE ALL AS SHOWN. 5
ACTIVATION.
CHANNEL
2xLOCKERS
FINAL DESIGN, LAYOUT AND SPECIFICATION TO BE AGREED WITH SPECIALIST. DATA AND POWER OUTLET REQUIREMENTS FOR EACH CAMERA LOCATION TBC
SYSTEM AND ALL COMPONENTS MUST COMPLY WITH BS 5839-1:2017. SYSTEM TO BE AN WITH DESIGN BY SPECIALIST, TO BE SITED IN CEILING VOIDS WHERE POSSIBLE. D D
DRYER
FSH3 EJ
HAIR
L1 SYSTEM. USE FP200 CABLING. 5
360 DEGREES ADJUSTABLE CAMERA. USE EXTERNAL GRADE WHERE LOCATED
DS/DH MAINS OPERATED INTERLINKED DETECTOR UNIT. EXTERNALLY.
FEMALE CHANGING
5 DS LS 5 E 5
DS DH DS=SMOKE, DH=HEAT.
FSH4
DETECTORS SITED THROUGHOUT TO COMPLY WITH L1 SYSTEM. CCTV DVR CCTV DIGITAL VIDEO RECORDER AND MAIN CONTROL UNIT.
5
EJ RWP
FE FIRE EXTNGUISER POINT. TYPE AND CHARGE TBA.
EJ
Oakhurst Studio Revisions Date Revisions Date By : SB Drawing : Ground Floor Project : Phase 1 Addition to Pool at:
TENDER
Horam Electrical Layout ST. FRANICS SOCIAL AND SPORTS CLUB,
Heathfield 01825 767854 Scale : 1:50 @ A1
Dwg No. : 0815/3/1305 Lewes Road, Haywards Heath
East Sussex www.mjbarch.co.uk
TN21 0LJ admin@mjbarch.co.uk Date : March 2023 Rev : Client : St. Francis Social and Sports Club architecture