WINDOWS, DOORS AND GLAZING HEATING, COOLING, VENTILATION, HOT AND COLD WATER SERVICES

NEW WINDOWS AND GLAZED DOORS TO BE PURPOSE MADE IN POWDER COATED ALUMINIUM, COLOUR AS SHOWN FULL COMPLIANCE WITH B.REGS L1:2 2021 REQUIRED FOR THE SYSTEM INCLUDING ITS INSTALLATION, TESTING
AND COMMISSIONING BY AN APPROVED ENGINEER.
ON MATERIAL SCHEDULE, BY APPROVED MANUFACTURER. ALL EXTERNAL DOORS TO BE FIRE EXITS FITTED WITH
APPROPRIATE ONE ACTION FURNITURE, I.E. THUMB TURN LOCKS AND PULL HANDLES. WINDOWS TO BE FULLY ENTIRE SYSTEM TO BE DESIGNED, DETAILED AND INSTALLED BY M&E SPECIALIST. SEE SEPARATE DRAWINGS AND
WEATHERSTRIPPED, DRAUGHT SEALED AND FORMED TO RECEIVE 28mm FACTORY SEALED DOUBLE GLAZED UNITS DETAILS. SYSTEM TO INCLUDE HEATING AND COOLING AIR CONDITIONING PAIRED WITH EXTRACT AND SUPPLY
ARGON FILLED INCORPORATING PILKINGTON K-GLASS LOW EMISSIVITY GLAZING GIVING AVERAGE U-VALUE HEAT RECOVERY MECHANICAL VENTILATION TO ALL NEW AREAS IN PHASE 1 MAIN ENTRANCE ADDITION AND TO
BETTER THAN 1.4W/m2K. NEWLY FORMED MENS CHANGING/MENS WC/OFFICE AREAS IN EXISTING BUILDING. SYSTEM TO BE DESIGNED
GLAZING TO ALL DOORS, ADJACENT SIDELIGHTS WITHIN 300mm OF DOOR AND 800mm OF FLOOR AND ANY WITH EXISTING SYSTEM SERVING POOL IN MIND AND POSSIBLY PAIRED. BUILDING TO BE FULLY ZONED WITH
OTHER GLAZING WITHIN 800mm OF FLOOR LEVEL TO BE IN TOUGHENED SAFETY GLASS TO BS6206 1981 MIN. INDIVIDUAL AREAS SERVED BY SEPARATE THERMOSTATS.
CLASS C AND SHALL BE DESIGNED TO WITHSTAND HORIZONTAL FORCE OF NOT LESS THAN 0.74 kn/m² HOT WATER GENERATION TO BE PROVIDED BY HOT WATER HEATERS.
GLAZING UNITS TO BE MANUFACTURED IN ACCORDANCE WITH BS 5713 AND SITE GLAZING INSTALLED TO BS 5262 RUN DIRECT HOT AND COLD FEEDS TO SANITARY APPLIANCES AS APPROPRIATE.
1982. SHOWERS TO TO INCORPORATE THERMOSTATIC BLENDER UNITS FED FROM DIRECT/PRESSURISED SUPPLIES.
ALL GLASS IN ALL DOORS AND WINDOWS TO BE TOUGHENED AND LAMINATED THROUGHOUT. WC CISTERNS TO BE 6 LITRE CAPACITY DUAL FLUSH 6/4 LITRE WITH INTERNAL OVERFLOW MECHANISM.
ALL MARKINGS TO ALL GLAZED UNITS SHALL BE POSITIONED IN THE SAME LOCATION ON EVERY PANEL EG
ALL EXPOSED PIPEWORK SERVING THE SYSTEM SHALL BE INSULATED INCLUDING THE FIRST METRE OF VENT,
BOTTOM LEFT. FLOW AND RETURN PIPEWORK FROM HOT WATER GENERATORS SHALL BE INSULATED WITH SUPER FOAMFLEX
INSULATION. THIS SHALL INCLUDE ALL PIPES IN CONCEALED UNHEATED SPACES, IE CEILING VOIDS.
PROVIDE ON/OFF CASEMENT RESTRICTORS ON ALL WINDOWS, TO RESTRICT OPENING FUNCTION TO ENSURE
ALL INSTALLATION WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH CURRENT WATER BYLAWS.
OPEN CASEMENT PROJECTS MAXIMUM 100mm FROM FACADE, WITH OVER-RIDE TO ALLOW CASEMENTS TO BE
FULLY OPENED WHEN NEEDED.
UPON COMPLETION SYSTEM SHALL BE FULLY COMMISSIONED AND TESTED BY THE APPROVED INSTALLER AND A
COMPLETION AND TEST CERTIFICATE ISSUED FOR APPROVAL OF BCO/NHBC INSPECTOR. ALL SYSTEM
CERTIFICATES AND FULL OPERATION AND MAINTENANCE INSTRUCTIONS TO BE ISSUED TO EACH HOUSEHOLDER
CDM REGULATIONS UPON COMPLETION.

THE CLIENT IS RESPONSIBLE FOR UNDERTAKING THE APPOINTMENT OF SUITABLE SPECIALISTS TO ASSIST WITH AIR PERMEABILITY
THE MANAGEMENT OF ALL ASPECTS OF DESIGN AND CONSTRUCTION IN RESPECT OF THIS PROJECT. THIS PROJECT HAS BEEN DESIGNED BASED UPON A DESIGN AIR PERMEABILITY OF 5m3/hm2, THIS FIGURE MUST
BE ACHIEVED.
THE CLIENT IS REQUIRED TO APPOINT A PRINCIPLE DESIGNER TO COORDINATE ALL ASPECTS OF HEALTH AND
SAFETY IN THE DESIGN AND COMPLETION OF THE PROJECT.
SOIL AND WASTE PIPES
THE PRINCIPLE DESIGNER WILL ONLY BE MJB ARCHITECTURE IF EXPRESSLY CONFIRMED BETWEEN THE PARTIES
PRIOR TO COMMENCEMENT OF THE DETAILED DESIGN STAGE. THE CLIENT MAY ELECT TO APPOINT A THIRD USE PUSH FIT SYSTEM IN WHITE PVCu. BASIN WASTES 32mm DIAMETER, BATH, SHOWER, SINK AND APPLIANCE
PARTY HEALTH AND SAFETY SPECIALIST AS PRINCIPLE DESIGNER. WASTES 40mm DIAMETER UNLESS NOTED, ALL FITTED WITH 75mm DEEP SEAL TRAPS AND RODDING ACCESS
POINTS. SHOWERS TO HAVE TRAPPED STAINLESS STEEL DRAINAGE CHANNEL AND GULLY WASTES WITH
THE CLIENT MUST ENSURE THAT THE STATUTORY NOTIFICATION PROCESS TO THE HSE IS UNDERTAKEN AS REMOVABLE INSERT FOR ACCESS TO TRAP. EXACT SPEC AND PATTERN OF GRATING TBA. WC WASTES TO BE
SOON AS POSSIBLE UPON COMMENCEMENT OF THE PROJECT. 100mm DIAMETER TRAPPED 50mm AND FITTED WITH EASY-FIT PAN CONNECTORS.
WASTES DISCHARGE INTO VERTICAL INLET TRAPPED GULLIES WHERE SHOWN OR OTHERWISE VIA APPROVED
THE CLIENT AND PRINCIPLE CONTRACTOR SHALL BE AWARE THAT THIS PROJECT IS SUBJECT TO THE FULL SOIL BOSS CONNECTORS INTO 100mm DIAMETER PVCu SOIL VENT PIPES.
REQUIREMENTS OF THE CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015. SVPs TO HAVE RODDING ACCESS AT BASE AND WHERE SHOWN TO TERMINATE WITHIN VENTED CASING OR ROOF
VOID AND FITTED WITH DURGOVENT AIR ADMITTANCE VALVES.
THE CLIENT IS RESPONSIBLE FOR ENSURING THAT THE PRINCIPLE CONTRACTOR CARRIES OUT THE WORKS REMAINING SVPs TO TERMINATE EXTERNALLY ON FLAT ROOF MIN 900mm ABOVE ANY OPENABLE
WITH DUE DILIGENCE TO ALL ASPECTS OF HEALTH AND SAFETY AND THEY SHALL DEMONSTRATE THAT IN WINDOWS/DOORS WITHIN 3m (WHERE BEYOND 3m KEEP TERMINATION AS LOW AS POSSIBLE, E.G. APPROX
SEQUENCING EACH CONSTRUCTION OPERATION EVERY ASPECT OF HEALTH AND SAFETY HAS BEEN ADDRESSED 200-250mm HIGH) AND FITTED WITH MUSHROOM COWL.
IN THE CORRECT CONTEXT AND WITH PURSUANCE TO THE CDM REGULATIONS 2015. ALL SVP CASINGS TO BE ENCASED IN 2 LAYERS 12.5mm PLASTERBOARD AND INSULATED WITH 100mm SOUND
INSULATING QUILT.
FOR FURTHER INFORMATION REFER TO HSE GUIDELINES;
http://www.hse.gov.uk/construction/cdm/2015/index.htm

TENDER
Oakhurst Studio Revisions Date By : SB Drawing : Windows, Natural & Mechanical Project : Phase 1 Addition to Pool at:
Horam Services Specification ST. FRANCIS SOCIAL AND SPORTS CLUB,
Heathfield 01825 767854 Scale : NTS
East Sussex www.mjbarch.co.uk Dwg No. : 0815/3/SP1006 Lewes Road, Haywards Heath
TN21 0LJ admin@mjbarch.co.uk Date : March 2023 Rev : Client : St. Francis Social and Sports Club architecture