36 Direct Drive Emergency Bypass

36 Direct Drive Emergency


Bypass Position 1 = Main Converter
Bypassing 12 to 24V Converter Position 2 = Backup Converter

The following procedure is to be


used in EMERGENCY situations
only! Bypassing the 12 to 24 volt
converter disables all the E-Stop but-
tons, which can lead to serious injury E-stop Solenoids
or death. energized

The 36 Direct Drive is equipped with a 12 to 24 volt con-


verter (Schwing part# 98381513). On most machines, if
this converter fails, the boom sections can still be folded
up using the manual hand valves on the boom control Figure 2
block. The 36 Direct Drive needs electrical power to Converter switch / e-stop manifold solenoids
move boom sections 3 and 4. In the event of a 12 to
2. The boom can now be folded up into the transport
24 volt converter failure, the solenoids controlling boom
position. You must be careful when activating cer-
sections 3 and 4 cannot receive power, making it im-
tain functions, such as running the vibrator. These
possible to move. In order to overcome this problem,
functions will overload the system.
we have installed a second, backup 12 to 24 volt con-
verter that can be activated with a bypass switch. 3. Replace the main 12 to 24 volt converter immedi-
ately. The backup converter is for emergency use
B&R X90 Converter Bypass
Engine Control Backup Converter Switch only.

When the 12 to 24 volt converter is


bypassed - clean out and fold up
the boom immediately. Use caution
when folding up the boom. Do not
move the boom into any unsupport-
ed positions.

Leaving the bypass switch in position


2 will drain the battery if the ignition
is shut off. Test backup converter
monthly.
Emergency Vector Panel Vector Key Switch
Cable Control

Figure 1
36 Direct Drive electrical components.

In the event of a 12 to 24 volt converter failure:

1. Turn the converter bypass switch from position 1


to position 2 (Figure 2).The Vector panel will re-
start, check for any errors on the display.

Service Bulletin 1
36 Direct Drive Emergency Bypass

Loss of Electrical Power - Emergency


Fold-up Procedure
If you lose electrical power, boom sections 1 and 2 can
be folded up with the manual hand valves on the boom
control block (see operation manual). For boom sec-
tions 3 and 4, you must use a different procedure to fold
these sections into the transport position:

1. If the Vector Control Panel is still working, turn the


Vector key switch to the bypass position (Figure
1), then skip to step 4.

2. If the Vector control panel is not working, turn the


Vector key switch to the bypass position and then
turn the converter bypass switch from position 1
to position 2, (Figure 2) then skip to step 4 if the
E-stop solenoids are energized. Figure 4
Emergency cable control connected to B&R X90 en-
3. If the Vector and converter are bypassed, yet the gine control
E-Stop solenoids are still not energized, hold the
boom/outrigger override handle on the e-stop Damage may result if using the emer-
manifold (Figure 3). gency cable control. Material dam-
age or total failure of the rotary drives
is possible. Never deviate from the
Boom/Outrigger logical sequence of numbers.
Override Handle

The arrows on the emergency cable


control do not correspond to the rota-
tion of the boom sections. The arrows
are guides only.

Rotating boom 4
With the emergency cable control plugged into B&R
X90 engine control box:
Figure 3 1. Press and hold the white boom #4 release button
Boom outrigger override handle
(Figure 5).
4. Connect the emergency cable control into the 2. Start with white button #4, press and hold for at
socket on the B&R X90 Engine control (Figure least 5 seconds or until the boom stops rotating
4). (Figure 5).
5. Lock the socket into the connector so it cannot
be pulled out. 3. Press white button #3 for at least 5 seconds or
until the boom stops moving.

4. Press white button #2 for at least 5 seconds or


until the boom stops moving.

2 Service Bulletin
36 Direct Drive Emergency Bypass

5. Press white button #1 for at least 5 seconds or Rotating boom 3


until the boom stops moving. 1. Press and hold the boom #3 release button (Fig-
ure 6).
6. Continue pressing all buttons in sequence for at
least 5 seconds. If the boom section is rotating 2. Start with white button #4, press and hold for at
the desired direction, repeat the sequence until least 5 seconds or until the boom stops rotating
boom section #4 is folded in. (Figure 6).

3. Press white button #3 for at least 5 seconds or


until the boom stops moving (Figure 6).

4. Press white button #2 for at least 5 seconds or


until the boom stops moving (Figure 6).

5. Press white button #1 for at least 5 seconds or


Boom #4
release button until the boom stops moving (Figure 6).

6. Continue pressing all buttons in sequence for at


least 5 seconds. If the boom section is rotating
the desired direction, repeat the sequence until
boom section #3 is folded in.

Figure 5
Emergency cable control - Boom #4
Boom #3
Changing boom section 4 direction release button
If boom section 4 moves in the wrong direction, change
the button sequence

Button sequence - Blue arrows:


1-2-3-4-/1-2-3-4

Button sequence - Red arrows:


4-3-2-1-/4-3-2-1

Figure 6
Emergency cable control - Boom #3
Changing boom section 3 direction
If boom section 3 moves in the wrong direction, change
the button sequence

Button sequence - Blue arrows


1-2-3-4-/1-2-3-4

Button sequence - Red arrows


4-3-2-1-/4-3-2-1

Service Bulletin 3