You are on page 1of 16

Part B : Checklist

Values
S. No.

Is the CTO attached with the mail?


[Yes/No]
1 *In case of non-availability of CTO, kindly provide copy of
online application submitted by unit for issuance/renewal of
CTO

Validity date of CTO


1A (If CTO is expired, kindly attach copy of renewal
application)

Is the Unit registered on RTDMS Registration Portal


(http://rtdms.cpcb.gov.in/cpcbIndustryRegistration/)
2 [Yes/No]
If yes, kindly attach the copy of Registration PDF
Whether the details submitted on RTDMS Registration Portal
3 (http://rtdms.cpcb.gov.in/cpcbIndustryRegistration/) are
exactly matching with details provided in this sheet?
[Yes/No]

Whether PDF Copy of Migration Email sent by Unit,


having old and new TPDS in CC, is being enclosed in
this mail?
[Yes/No]
For
Migrati
4 on Whether Migration Letter in PDF form is attached with
Cases this mail?
Only [Yes/No]

Whether Historical Data is attached with this mail?


[Yes/No]

Is the operating manual of the Device attached with this


Email? [Yes/No]
[Attaching the Device Manual is mandatory, and measurement
principle/technique should be clearly mentioned in the
manual]

5
Is the certificate of the analyzer [NPL/USEPA/TUV etc.]
attached with this email? [Yes/No]

Is the installation of entire OCEMS System as per CPCB OCEMS


Guidelines?
[Yes/No]

8 Is the authorized representative of the Unit being kept in CC


while sending this email?

Important Information

*All TPDS and Industry shall ensure that analyzers and their installation conform to the OC
technical guidelines available on CPCB website. By sending a request for connectivity, it is d
that TPDS and Industry have verified the compliance of analyzers and their installation with
technical guidelines and shall be liable in case of any deviation from guidelines.
Connectivity is not applicable for any device using electrochemical method for measuring emis
parameters; this processed connectivity shall automatically be deemed to be canceled if the d
mentioned in the sheet is based on electrochemical method.

All the integrations are provisional subject to future review of discharge limits, measurem
principles used in the device and/or device capability, by any CPCB Division, and any correc
action including direction for replacement of these devices if found unsuitable.

For Clarification, it is informed that there are 3 Portals

1. https://rtdms.cpcb.gov.in/cpcbIndustryRegistration/ :  For Registration

2. https://rtdms.cpcb.gov.in/industry-login :  For Real time data Visualisation

3. https://orp.cpcbccr.com/ocems/#/login :  For Online OCEMS Reporting


klist
Response (Yes/No)
[To be filled by TPDS/Unit before
emailing the request]
on

heir installation conform to the OCEMS


a request for connectivity, it is deemed
lyzers and their installation with CPCB
f any deviation from guidelines.
ochemical method for measuring emission
y be deemed to be canceled if the device
ctrochemical method.

eview of discharge limits, measurement


y any CPCB Division, and any corrective
se devices if found unsuitable.

there are 3 Portals

or Registration

e data Visualisation

S Reporting

You might also like