You are on page 1of 25

1

1
1-1

2 



2

2

2

6 1 
1-1-1

2
1

% 50 2
% 40 3
% 60 2

2
6 2 2-1-1
2-1


2

2
2
6 3 

Connected Load - CL 2
Connected Load - CL
. DPS-01 KVA

3
Connected Load - CL C1 , C2 )1-2
m2 KVA
DPS-01 6,4
Connected C17 C3 )2-2
VA/m2 KVA Load - CL
m2 DPS-01 8

KVA Connected Load - CL


1000 VA/m2 m2
22 6 4 )3-2
KVA Connected Load - CL )4-2
A

KVA Connected Load - CL )5-2


A

DPS-01
6 5 )6-2

Coincident Demand Load - CDL 3


Coincident Demand Load - CDL
. DPS-01 KVA
800 Connected Load - CL 1-3

1-1-3
C1 , C2 
KVA
DPS-01 6,4
C29 C3 
A
KVA

DPS-01

4
Coincident Demand Load - CDL 2-1-3

𝐶𝐷𝐿 = (∑ 𝐶𝐵𝑅𝑖 × 𝐷𝐹𝑖 ) × 𝐶𝐹(𝑁)


𝑖=1
DPS-01
6 6 3-1-3
800 Connected Load - CL 2-3

Coincident Demand Load - CDL 1-2-3

𝐶𝐷𝐿 = (∑ 𝐶𝐿𝑖 × 𝐷𝐹𝑖 ) × 𝐶𝐹(𝑁)


𝑖=1
DPS-01
KVA 

KVA

A
KVA
6 7 

. DPS02
1-4

30 20 
800 600 500 400 300 250 200 150 125 100 70 50 40
4 Connected Load
16 4 

5
400 230 
33 

Radial 

Coincident Demand Load - CDL


3
3
Coincident Coincident
Demand Demand Load No. of Size of
No. of Main LV Feeder
Load (KVA) for LV LV
Supply Outgoing
(Amps) 230/400 (V) Cables Cables
Source Fuses /
to to No. of
MCCBs Cable
From To From To Customer Customer Cables
Size
to DP
1 108 1 75 DP 1 1 70 mm2 1 300 mm2

109 184 76 127 DP 1 1 185 mm2 1 300 mm2

185 216 128 150 DP 2 2 70 mm2 1 300 mm2

217 248 150 172 DP 2 2 185 mm2 1 300 mm2


1 184 1 127 SS 1 1 185 mm2 Direct Feeder
185 248 128 172 SS 1 1 300 mm2 Direct Feeder
2
249 368 173 255 SS 2 2 185 mm Direct Feeder
2
369 496 256 344 SS 2 2 300 mm Direct Feeder

DPS-02
Coincident Demand Load - CDL 2-4

𝐶𝐷𝐿 𝑜𝑛 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 = (∑ 𝐶𝐵𝑅𝑖 × 𝐷𝐹𝑖 ) × 𝐶𝐹(𝑁)


𝐸𝑙𝑒𝑚𝑒𝑛𝑡
𝑖=1
DPS-02
6 8 3-4
4-4

Rating Coincident Demand Load - CDL

𝐶𝐷𝐿 𝑜𝑛 𝑁𝑒𝑡𝑤𝑜𝑟𝑘
𝐸𝑙𝑒𝑚𝑒𝑛𝑡
𝐿𝑜𝑎𝑑𝑖𝑛𝑔 % 𝑜𝑛 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 = × 100
𝐸𝑙𝑒𝑚𝑒𝑛𝑡 𝑅𝑎𝑡𝑖𝑛𝑔 𝑜𝑓 𝑁𝑒𝑡𝑤𝑜𝑟𝑘
𝐸𝑙𝑒𝑚𝑒𝑛𝑡
6
DPS-02
6 9 5-4
6-4
% 80
Rating
7-4

K Coincident Demand Load - CDL


L
𝐶𝐷𝐿 (𝐾𝑉𝐴) 𝑜𝑛 𝐿𝑉 𝐶𝑎𝑏𝑙𝑒 × 𝐿 𝐿𝑉 𝐶𝑎𝑏𝑙𝑒
𝑉𝐷 % 𝐿𝑉 𝐶𝑎𝑏𝑙𝑒 =
𝐾 𝐿𝑉 𝐶𝑎𝑏𝑙𝑒
DPS-02
6 10 8-4
9-4
%5
10-4

1-5
100 70 50 40 30 20 1-1-5
800 600 500 400 300 250 200 150 125
1000 2-1-5
% 80
6 11 3-1-5

7
4-1-5

2-5
Connected Load - CL 1-2-5
4 800
1000 2-2-5
% 100
6 12 3-2-5
4-2-5

3-5
1-3-5
RMU 2-3-5

3-3-5

4-5
Coincident 1-4-5
4 Demand Load - CDL
630 400 2-4-5
CDL
% 100

6 13 3-4-5
4-4-5

8
CDL 6
Coincident Demand Load - CDL
CDL
7 2
𝑁

𝐶𝐷𝐿𝐹𝑜𝑟 𝑃𝑙𝑜𝑡 𝑃𝑙𝑎𝑛 = (∑ 𝐶𝐷𝐿𝑖 ) × 𝐶𝐹 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑠𝑢𝑏𝑠𝑡𝑎𝑡𝑖𝑜𝑛𝑠 × 𝐶𝐹𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑀𝑉 𝑓𝑒𝑒𝑑𝑒𝑟𝑠


𝑖=1

Coincident Demand Load 𝐶𝐷𝐿𝐹𝑜𝑟 𝑃𝑙𝑜𝑡 𝑃𝑙𝑎𝑛


i Single Loop 𝐶𝐷𝐿𝑖

N
0.9 CDL 𝐶𝐹𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑠𝑢𝑏𝑠𝑡𝑎𝑡𝑖𝑜𝑛𝑠
0.9 𝐶𝐹𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑀𝑉 𝑓𝑒𝑒𝑑𝑒𝑟𝑠

7
1-7


16 CL

33 13.8

Single Loops – 

Normal Open Point


1
Firm Capacity N-1 
Single Loop –
% 50 % 100

9

%5
2 500 
33 2 240 13.8
2-7
Direct –Buried Cable Rating 
4
4
Direct –Buried Cable Rating
MV Cable Size Voltage
(Amp) (MVA)
3X 500 mm2 AL 13.8 KV 380 9
3X 240 mm2 CU 33 KV 350 20

De-rated Capacity 
5
5
De-rated Capacity
MV Cable Size Voltage
(Amp) (MVA)
3X 500 mm2 AL 13.8 KV 320 7.6
3X 240 mm2 CU 33 KV 290 16.6
De-rated Capacity 
6
6
Ambient Temperature Direct Buried/ Underground Ducted, at depths of one (1) meter
and more 40 °C.
Soil Thermal Resistivity, at depths of one (1) meter and more 2.0 °C.m/w
Burial Depth (to the center of the cable) 0.65 m
Multiple Cables Circuit Spacing (center to center) 0.30 m
K 
7

10
7
Cable Voltage K
3X 500 mm2 AL 13.8 KV 15170
3X 240 mm2 CU 33 KV 71222
3-7


6

4-7

30 
21 11 RMU 
Simple Loop 
2 30 

Single Loops 

DPS-01 1
DPS-02 2

11
9

SLD 1
MV Single Loop 1
MV Single SLD 2
Loop 2

1
3

2
4

3
5

12
13
14
MV Single Loop SLD 1

15
MV Single Loop SLD 2

16
1

17
2

18
3

19
20
1
% 60 ² 600
%40
2

² 360 %60 600


2

² 144 %40 360


2

² 1224 144 3 360

2
² 2000

1
2

2 2000 2 %50 2000

3
² 500
%60

² 300 %60 500


2

² 900 3 300
2

2
2
2 150 6 900 2

21
4
2 2000 Connected Load - CL
KVA Connected Load - CL
VA/m2 m2
1000
VA/m2 185 (C9 DPS-01
370 1000 185 2000

5
400 KVA Connected Load - CL
400 230
KVA Connected Load - CL
1000 𝐶𝐿𝑖𝑛 𝐾𝑉𝐴 =√3×𝐶𝐿𝑖𝑛 𝐴𝑀𝑃 ×
277 1000 400 400 1.73

6
Coincident Demand Load - CDL
% 60 ² 600
%40
2

² 360 %60 600


2

² 144 %40 360


2

² 1224 144 3 360


2

² 180 6 3 360
2

² 144 1 144
DPS-01 4,6
40 ² 180
30 ² 144
22
270 30 40 6
𝑁

𝐶𝐷𝐿 = (∑ 𝐶𝐵𝑅𝑖 × 𝐷𝐹𝑖 ) × 𝐶𝐹(𝑁)


𝑖=1
103 0.636 0.6 270 CDL
7
Coincident Demand Load - CDL
% 60 ² 4000
2

² 2400 %60 4000


2

² 4800 2 2400
KVA Connected Load - CL
1000 VA/m2 m2
VA/m2 180 C8 DPS-01
846 1000 180 4800
800 1226 846 Connected Load - CL
Coincident Demand Load - CDL
𝑁

𝐶𝐷𝐿 = (∑ 𝐶𝐿𝑖 × 𝐷𝐹𝑖 ) × 𝐶𝐹(𝑁)


𝑖=1
677 1 0.8 846 CDL

8
Coincident Demand Load - CDL
40 16
Coincident Demand Load - CDL
𝑁

𝐶𝐷𝐿 𝑜𝑛 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 = (∑ 𝐶𝐵𝑅𝑖 × 𝐷𝐹𝑖 ) × 𝐶𝐹(𝑁)


𝐸𝑙𝑒𝑚𝑒𝑛𝑡
𝑖=1
160 231.2 0.602 0.6 16 40
² 300 4

9
² 300 4
160
23
𝐶𝐷𝐿 𝑜𝑛 𝑁𝑒𝑡𝑤𝑜𝑟𝑘
𝐸𝑙𝑒𝑚𝑒𝑛𝑡
𝐿𝑜𝑎𝑑𝑖𝑛𝑔 % 𝑜𝑛 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 = × 100
𝐸𝑙𝑒𝑚𝑒𝑛𝑡 𝑅𝑎𝑡𝑖𝑛𝑔 𝑜𝑓 𝑁𝑒𝑡𝑤𝑜𝑟𝑘
𝐸𝑙𝑒𝑚𝑒𝑛𝑡
215 ² 300 4 DPS-02
%74 100 215 160 %

10
² 300 4
120 400 230 160

𝐶𝐷𝐿 (𝐾𝑉𝐴) 𝑜𝑛 𝐿𝑉 𝐶𝑎𝑏𝑙𝑒 × 𝐿 𝐿𝑉 𝐶𝑎𝑏𝑙𝑒


𝑉𝐷 % 𝐿𝑉 𝐶𝑎𝑏𝑙𝑒 =
𝐾 𝐿𝑉 𝐶𝑎𝑏𝑙𝑒
10132 ² 300 4 K DPS-02
%1.89 10132 (120 160) %

11

100 6
600 100 6
1800 600 3

𝐶𝐷𝐿 𝑜𝑛 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 = (∑ 𝐶𝐵𝑅𝑖 × 𝐷𝐹𝑖 ) × 𝐶𝐹(𝑁)


𝐸𝑙𝑒𝑚𝑒𝑛𝑡
𝑖=1
447 646 0.598 0.6 1800
1000
%45

12
400 230
² 3200
KVA Connected Load - CL
1000 VA/m2 m2
24
² 3200

VA/m2 215 (C2 DPS-01)


KVA Connected Load - CL
800 993 688 1000 215 3200
Coincident Demand Load - CDL
𝑁

𝐶𝐷𝐿 = (∑ 𝐶𝐿𝑖 × 𝐷𝐹𝑖 ) × 𝐶𝐹(𝑁)


𝑖=1

481 1 0.7 688


%48 1000

13
12
13.8
Coincident Demand Load - CDL
𝑁

𝐶𝐷𝐿 = (∑ 𝐶𝐿𝑖 × 𝐷𝐹𝑖 ) × 𝐶𝐹(𝑁)


𝑖=1
8400 1 0.7 12000
351 Coincident Demand Load – CDL
%88 400

25

You might also like