You are on page 1of 14
MP2 /OAS 32008.9282.4 ¥9/m Grace 30 Monnateine camertRcun grout Caracar” Foon Cainer Project The Construction and Completion of [avaia Mayu Sdn Bhat Proposed Sekatap / Meriboag Ng. Jelay/Jeiau Acas pemcting ‘atu Lintang Road, Belong, Division [Jabatan Kerja Raya SARAWAK oneutng Engineer Engineer $0 ™ Perunding teNova Sd Bhd [Contrast No. = PWD/HO/B102/2018 MICRO PILE DRILLING RECORD [iocaion, ORE 8 VER 7 Sei No. Pile Details 27/0 Dept Soil D Spy 2 groufing | werk Plant/Equipment | DateTime Compie ype of del bir di orsole Data NSTING WORKING [Remarks ver A (as sm Rel io pl ae ee Gaong aniston, Clerk of Works” | FFonpacor” Fomor macor* Frojest The Contraction avd Completion of [sama Maj Sta ha Proposed Sehatap/ Meritong/ Np. Jelau/Jetau tas | Taplomcntg Tae ‘at Lintang Roa. Betong Division | Llabatan Kerja Raya SARAWAK IConcuting Engineer Engineer 60 © Peranding trNova Sdn Bhi IConract No: PWH/HOrBLO32018 MICRO PILE DRILLING RECORD. cain SROGE 3 FAR 1 Serial No. Pie Details aft ‘Depth (mm) ‘Soll Deseription SE | Stage 9 grodting bork it Date Time Sia DateTime Com Plant Equipment | | pe of dil is | Tepe ot bieidia) Borehole Data NITING WORKING Reinforcement Data No. spe and see 0 | Agreed By | : i tll (Clk of Works," | | Jaa Maje Son Ba Taping Tae jiabstan Kerja Raya SARAWAK [Consulting Engineer Engineer Perunding leNova Sdn Bhd ‘patacar Far Concer * Prise [Contract No: PWD/HO/R 1022018 “The Constrvction and Completion of ] Proposed Sehatap/ Meribong/ Ng. Jelaw/Jelau tas | | | atu Lintang Road, Betong Division MICRO PILE DRILLING RECORD [inn AGE 3 ART Serial No Pate Details f {Deptt BF Date Vie Con Plant Equipeneat of bide, isto of driling sir Wier Mud? Borehole Data Segre a ing pl | Vertical Rak Working Load Lf : | jay SwoaustibGraman Gaong | Bremisiion: Clerk of Works | Fonvacior” Fomig-Conact™ [priest ~The Construction and Completion of ] Samaja Man Sin Bhd Proposed Sekatap / Mevibong / Ng. Jelau Jelau Atas eplecntng OR Batu Lintang Road. Betong Division | [Jabatan Kerja Raya SARAWAK oneuding Engiacer Engineer SO ™ | [Peruading teNova Sida Bhd [Contract No PWD/HO/B102/2018 J MICRO PILE DRILLING RECORD OGE a PRAT Seal No abo Dept Soil Deserition ae Segr 9 growhg Work Pile Details ate Time Sane ate Time Comp! Borehole Data NISTING WORKING Grouting Data ted a/7/froal ena . "ala We au oe Clerk of Works aceite [savaia Mayu Sdn ha Pptmtng omy |iabatan Kerja Raya SARAWAK ng Engineer Eugincar-SO™ erunding teNova Sdn Bhd cl Project The Construction and Completion of Proposed Sekstap / Meribong/ Nz, Jelau/Jelau Stas atu Lintang Road. Betong Division [Contract No. = PWHATO.T102/2018 MICRO PILE DRILLING RECORD ‘cation CAME G CHR! Sera No Pile Details Borehole Daca NBTING WORKING ny ite Reinforcement Data No. pe and size of cinlorcenint Deathiim | ‘Sot Deserin Shage 2 grovfing York Date ate Joints agreed B ™ Adi Kuswadinata Kipli Clerk of Works aceite [Corracor Fer Conraior™ sawaja Maja Sdn Bha Project» The Construction and Completion of [aptemening Tae [Jabatan Kerja Raya SARAWAK Batu Lintang Road, Betong Division Conculaing Engineer (Engineer “SO™ Perunding trNova Sdn Bhd |Contact No, : PWD/HOMB102/2018 Proposed Sekatap / Meribong / Ng. Jelau / Jel Atas / MICRO PILE DRILLING RECORD fcvion: BROGEY PERT Serial No Pile Details Pte Reterence No 28/CT Nomina ameter Sf... DateTime stansd DateTime Completed Det (im) Soil Description Seagr 2 growling Work Plan Equipment [Type of dil ig [Type of bit aia.) Metiod of dein ip Water Mud Borehole D EXISTING WORKING Pace level (rn) pit cutotevel im) ite oe tev (m) Ground wate evel (a) engin of peanent easing (any Reinforcement Data No. type and size of reinvorcement Length of reinforcement installed Grouting Data ate srouted LF a8]. WwaterCement ratio aK, fypeorauitivewses + AIRY whe ge LAa Raton per SOkg ofcement © SPAY, Bags of cement Sage F288? JRemaks Vertical Raked Working Load ecoded By (RD Toinly Apeed By bl Cosclyerdie ® al : NamaJustin Graman Ggong Nave MabD (KaaL) organisation: ( ) Organisation ( ) © Organisation: ¢ Clerk of Work, Date Namenidi Kusy Date Date Ties ar appre MP2 /O1S 32008. 082.5 89/m Grate 30 Won~atnne enmertun srouk ; nen ya cite [Corracior? Faker Comracor * sawaja Maja San a Project Vapiomeain Fae Ltabatan Kerje Raya SARAWAK. [Consulang Engineer Engineer SO ™ Perunding Nova Sdn Bhd "The Construction and Completion of Proposed Sekatap / Meribong / Ng. Jelau / Jelau Atas / Batu Lintang Road, Betong Division [Contract No. : PWD/AOVB102/2018 MICRO PILE DRILLING RECORD hocaion: BRAGE E.R 2 Serial No File Details OS /EF Pte Reference No, Depth (om) Soll Deserpsion BH om Nominal diameter [DateTime Stated DateTime Completed Hg a grethng work Plant/Equipment Type of aril rig Type of bic idin) Method of dil si Wate/Stud® Borehole Dats fexisriNG WoRKING Platiorm level (m) Pte cut-ott eve m) Pite oe tevel (m) Ground watery Length of permanent easing cm). i'any Reinforcement Data No. pe and sie of einforeement Length of reinforcement insalled Grouting Data 7 F/a087. Date grouced aS. Wate'Cement ratio [Type of additive used Raion er SOkg of cement Bags of cement Remarks Venical/Rakod Working Loa: fi Li Jointly Agreed By rpuisation:( ) Organisation: ¢ Date Date verde By QOD x sane( MRD mals seni asta wets eaien oiong Clerk of Works ) Organisation: ( Date Teo ar appro F Foo Commas Frsiect The Construction and Completion of sawata May Sun Bad Proposed Sekatap/ Meribong / Ng. Jelau/Jelau Atas/ | eesementns teem Batu Lintang Rood. Betong Division LJabacan Kerja Raya SARAWAR or Engincer-SO onending Perunding teNova Sd Bhd [Contract No, : PWD/HOyB1022018 MICRO PILE DRILLING RECORD (cui RRO) LRG S ste a Nominal tarmeter POF am eye a grog Date Time Stan iaureceaeg ec hrork Plan’ Equipment Ispe oF dri ype | 7 | ndustin Gra og | isatons: Clerk of Works i [tabatan Kerja Raya SARAWAK Fone Engen Peranding Nova Sdn Bhd Fagincer SO [Pract _: The Construction and Completion of Proposed Sekatap / Meribong / Ng Jelau (Jelau Acas Batu Lintang Road, Betong Division [Contact No. PWDHO/B102/2018 MICRO PILE DRILLING RECORD Exe Grouting Data soca POG 3 WER I T sera Tile Det Wo (aon Sa Dern tT Hage 2 go Mock Type ofbiidan | tio of ding te | Borehole D | | pare IHS 9. Sbage¥ 0.2809 Tointly Agreed By « dusti nf Gaong “oa Kuswanckalipl oF Cle of Works ‘onnacar Parmer Eomrocor* [Priest The Construction and Completion of ] fara ttai ees Ee Proposed Sekatap / Meribong / Ng. Jelau Jelau Atas Tabmenng Tae Batu Lintang Road. Betong Division [sabatan Kerjo Raya SARAWAK [Contulinng Engineer Fnginer 50 | Perunding teNova Sia Bhd [Contract No. - PWo/HOTB10272018 | MICRO PILE DRILLING RECORD ‘cnn BOGE OCHA B Serial No o9/er Dentin | Sol Deasripion ay 5 Pie Details ereof dil i bitidies Sotto of dling fir Water Borehole: so. pe al ie Grouting Data Tarraciar” Faey Comracer* Print The Construction and Completion of [ssvaia Maye Sdn Bua Proposed Sekutap / Meribong/ Ng. Jelau Jelau Atas Taming Tae atu Lintang Road, Beton Division [Jabatan Kerja Raya SARAWAK Conteling Engineer Frgincer SO ™ Perunding teNova Sda Bhd iceonestae BD TCVmiaaAEiE. MICRO PILE DRILLING RECORD toction BROGE 3 KR A Serial No. Pile Details 2a Dam Om, Shae a grodtng hork | Dale Time Compete Plant Equipment Type ot til Borehole Daca XITING WORKIN As Vertical Rake tt rene Kipli ach Gaong panto: veankasonss Cenk of Works, | [Formac Fontan omar ™ Priest ~The Construction and Completion of [avai Majo Sda ha Proposed Sekatap / Meribong / Ng Jelau / Jelau Atas Tapleong Teeny Batu Lintang Road, Betong Divison Jabatan Kerjs Raya SARAWAK er EngincerSO™ [Consutang Eng Perunding teNova Sda Bhi [Conract No. - PWHAKO/BIU2/2018 MICRO PILE DRILLING RECORD ‘oun GROG 8 ORR 0 T secon nce Na. 20/0 ied PF om Depthim | Soil Description Beye 0 grouting dork Borehole Data NISTING WORKING Piaiorm tevel om Pte cutott evel O/F food? ] 9s 0 whaptehe o bh naan? a ‘ acta Kipli Ss faa Gaong reuniatons« Clete of Works, ics senesseer earl

You might also like