SECTION E - CONCRETE

1 GENERAL 3
1.1 GENERAL REQUIREMENTS 3
1.2 STANDARDS 3
1.3 INTERPRETATION 3
1.4 ADJOINING ELEMENTS 3
32 QUALITY
2.1 QUALITY ASSURANCE 3
3 2.2 INSPECTION
2.3 CONSTRUCTION PROPOSALS 3
3 3 TESTS
TESTING
3
GENERALLY 3 3.1
3.2 PERFORMANCE TESTS
4 FORMWORK
3 1.5 FORMWORK 3
3 1.6 TOLERANCES 3
1.7 FORMED SURFACE FINISH 3
1.8 FORM TIE BOLTS 3
1.9
3 FORMWORK REMOVAL 3
1.10 LOST FORMWORK
5 CONCRETE MATERIALS
1.11 CONCRETE MATERIALS GENERALLY 3
1.12 CONCRETE 3
1.13 PERFORMANCE CRITERIA 3
1.14 MIX DESIGN 3
1.15 ADDITION OF WATER 3
6 REINFORCEMENT 3
.1 REINFORCEMENT GENERALLY 3
.2 FIXING REINFORCEMENT 3
.3 REINFORCEMENT SUPPORTS 3
7 EMBEDMENTS, CORES AND FIXINGS 3
1.16 FIXINGS AND EMBEDDED ITEMS 3
1.17 PROTECTION OF FIXINGS 3
8 UNDERLAYS, MEMBRANES 3
1.18 CONCRETE WORKING BASE 3
1.19 POLYETHYLENE FILM UNDERLAY 3
9 PLACING AND CURING 3
1.20 PLACING AND COMPACTION 3
1.21 HOT WEATHER PLACING 3
1.22 CURING 3
1.23 PROTECTION 3
10 JOINTS 3
1.24 CONSTRUCTION JOINTS 3
1.25 EXPANSION JOINTS 3
1.26 SHRINKAGE JOINTS 3
1.27 TYPICAL LINTELS 3
11 PRECAST PRESTRESSED HOLLOWCORE ROOF AND FLOOR
SYSTEM 3
11.1 GENERAL REQUIREMENTS 3
_______________________________________________________________________