You are on page 1of 8

Simulasi Reservoir

Project_I
Nature Field
Kevin Eduardo Ptinggi (130….)
Yudhi Hendra Priady (1301150)
TP Reg. B
1. History
-Field Founded -> ?
-First Exploitation for 20 Years -> 2016

2. Well Completion
-Base Case -> 1 Well (Padi_I)

-Case I -> Add 2 Wells (Padi_II, Padi_III)


-Case III Edit Rate -> Add 2 Wells (Padi_IV, Padi_V)
3. Development Strategy
-Strategy :
• Add some wells to increase oil production
• Make some case to choose the most optimal case
• Choose the most economical case
• Low Production Water
• Natural Flow
-Result :
 FOPT
 FOPR

 FGOR
 FWPR

-Economics

4. Conclutions
• Natural flow for 20 years, with 3 Scenario (Base Case, Case 1 and Case 3 Edit Rate).
• Obtained OOIP = 11,961,459 STB.
• Use Case 3 Edit Rate because the optimum Oil Production and highest Net.