Professional Documents
Culture Documents
Bent #5: Section A-A Section B-B
Bent #5: Section A-A Section B-B
TEMPORARY SPECIAL
3°
SHORING
15
'33
Bent Phase SF
"
6 3 450
N 1
N 1
A
7 2 1797
3°
A
3°
36" E
15
15
'
'
33
33
06'
"
"
TSS (Typ)
W
40
W
N 3°
5 Limits of force
'
main removal
-3"
5 Pile
5 Existing 8"
4 S
footing
force main
pa
8 S
31
Phase 3
at
-0"
pa
'-0"
4 Spa at 14'
14
at
B
'-7"
8'
B
-2"
14
24
24
9'
'
20
-7"
9'
� Bent #5
-5"
'
'
-5"
-0"
-0"
'
-0"
-5"
4'
Sta 246+25.00
-1"
-0"
9'
18
18
23'
8'
'
'
-10
-2"
-10
20
-0"
24
24
Phase 2
"
"
'-5"
18'
'
'
-0"
-0"
4'
14
-1"
9'
-0"
9'
-5"
'-7"
-5"
23'
4 S
-0"
8 S
9'
pa
End bridge
� Bent #6 � Bent #7
pa
11
Abut #8
at
Sta 247+45.00 Sta 248+60.00
-0"
at
'
Face of bkwl
-1"
14
Sta 250+10.00
4 Spa at 14'
8'
'-7"
at
-2"
2 S
5 Existing manhole
Phase 4
16
pa
'-4"
16°22'09"
16°22'09"
16°22'09"
TSS (Typ)
5 Limits of force
main removal
3 Shoring limits
Proposed concrete (Typ)
riprap 3 Shoring limits
(Typ)
4
1' to 2'
4 1' to 2'
(Typ)
(Typ)
SECTION B-B
SECTION A-A Bridge
Division
SH 87 OVERPASS
Notify and coordinate with City prior to removal.
Contact Jane Doe, P.E. 512-555-1234.
FILE: DN: CK: DW: CK:
Coordinate with City to set removal limits.
C TxDOT CONT SECT JOB HIGHWAY
REVISIONS