ashgqreve | Construction | Construction ng tions | Interiors QUOTATION Description p N-AND PIPE ROUTING. No. 100mm Pipe Installation to console room. Break and excavate 1m? of reinforced concrete from both sides of existing 1.5m wall Excavate 1.2m? commencing at formation level on both sides of existing wall 1,250.00 930.00 c | Bore 1m? whole through the 1.5m wall and insert | SNo. 100mm pipes and seal with mass concrete \ © | Backfill and remove surplus excavated materials from } site Repeat A to E for 2No. 100mm chiller Pipes. F | Break and excavate 1m” of reinforced concrete from | both sides of existing 1.5m wall G | Excavate 1.2m" commencing at formation level on | Doth sides of existing wall H_ | Bore 1m* whole through the 1.5m wall and insert | 2No. 100mm pipes and seal with mass concrete |_| Backfill and remove surplus excavated materials from site 2,050.00 370.00 1,250.00 930.00 Demolish 6m* of existing reinforced concrete wall Create 2No. 900mmx2100mm doors Break to create 2No. 0.9mx2.1m door way in the | existing 0.5m thick reinforced concrete wall Pit Excavation 50 Break and excavate and 0.32mx2.0mx4.3m pit in reinforced concrete floor ADD 15% VAT and 2.5% NHIL Kindly advance 60% of the total sum for MOBILIZATION. For furtherjdiscussions or enquiry on this quotation kindly call the project director on 054 120 2,050.00 [Tot at Cisne) Please NOTE that this invoice is valid for a period of ONE MONTH.

You might also like