You are on page 1of 6

Detector VRAD

TRAD Detector Service Training


FeiTian TTT Training
Page 1 Nov.7-Nov.11, 2005
Unpacking Detector

1. Open the box (make sure no physical damage to the box)


2. Open the detector packaging (make sure no damage/dent on detector)
3. Visual inspection of the detector for any abnormal/damage.

TRAD Detector Service Training


FeiTian TTT Training
Page 2 Nov.7-Nov.11, 2005
Detector Installation / Tether Replacement
• Tether replacement:

Service hatch

1. Use Philips screw driver to remove screws 1-4


2. Use 2.5mm Allen wrench to remove the screws labeled (5 and 6)

TRAD Detector Service Training


FeiTian TTT Training
Page 3 Nov.7-Nov.11, 2005
Detector Installation / Tether Replacement (Cont’d)
• Tether replacement:
1. remove the copper
bracket holding the tether
2. Disconnect the power
socket
3. Disconnect the Ethernet
cable from the RJ 45
socket

TRAD Detector Service Training


FeiTian TTT Training
Page 4 Nov.7-Nov.11, 2005
Detector Normal Operation
Two LEDs on the front side to show the status information
1. RED LED:
– Steady RED: Error condition; do not use
– Blinking RED: Warning condition; use with caution

2. GREEN LED:
– Steady GREEN: Full power mode
i.e. detector is ready for acquisition or image is being transferred
– Blinking GREEN: IDLE mode
i.e. detector is waiting for commands

TRAD Detector Service Training


FeiTian TTT Training
Page 5 Nov.7-Nov.11, 2005
TRAD Detector Internal Structure
1
1
3 2
1. Scan MCM

Detector: Motherboard Flat Panel Assembly 2. Data Module

3. FET&Diode

TRAD Detector Service Training


FeiTian TTT Training
Page 6 Nov.7-Nov.11, 2005

You might also like