You are on page 1of 3

Syllabus

WSME:
• Stop Watch Time Study
• Pre-determined Motion Time Study
• Work Sampling
• Process Capacity and labour productivity
• Line Balancing
• Assembly line process
• Batch Production System
• Lean Terms

QMS:
• Point of Criticism About ISO 9001
• Comaprision between ISO 9001 2008 VS ISO 2015
• Truths and Myths about ISO 9000
• What is Auditing
• ISO 19011 Guidelines for Auditing Mangement System
(Standard)
• Comparison between ISO 19011 2011 VS ISO 19011 2018

HRM:
• HRM Challenges
• Job Analysis
• Basis of Maslow's Hierarchy of need
• Theory X and Theory Y
• Comparison of Theory X and Theory Y
• Job Analysis Basic of HRM Program( Work, Task, Duty,
Responsibilty,Position, Job, Occupation)
• Basic Factor determining Pay Rates
• Compensation policy Issues
• Establishing Pay Rates steps
• Improving Productivity through HRIS
• Motivation and Incentives
• Abaraham Maslow's Hierarchy of need
• Herberg's Hygiene Motivator Theory
• Edward Deci
• Victor Vroom's Expectancy Theory

OR 1:
1) Network Analysis
• Mininmum Spanning Tree
• Shortest Path problems
• Maximum Flow Problems
2) Transportation Problem Methods:
• North-West Method
• Least Cost Method
• Vogels Method
3) Tranpsortation Methods for Optimal Solution
• Stepping Stone Method
• MODI method
5) Integer Programming Formulation Method:
• Rounding Off A non-integer method
• Cutting Plane Method
• BRANCH AND BOUND
• The additive Algorithm For zero One Integer Programming
Problems.
6) Non-Linear Programming
Only (Overview) with Constrained NLP and Unconstrained NLP

PPC:
• Sale and operation planning (Aggragate Planning)
• Master production Schedule
• Material Requirement planning
CAD-CAM:
• Solidworks CAD
• Solidworks CAM
• SolidworksSheetmetalworking
• Solidworks Mold Tool

You might also like