1 DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA BIAYA No.

URAIAN KODE HP
KAPASITAS HARGA SEWA KET. ALAT ALAT/JAM (di luar PPN) 1. ASPHALT MIXING
PLANT E T/Jam 1,710,625,000 1,217, Alat Baru 2. ASPHALT FINISHER E Ton 636,093, ,
Alat Baru 3. ASPHALT SPRAYER E ,000.0 Liter 143,750,000 60, Alat Baru 4. BULLDOZER
HP E ,437, , Alat Baru 5. COMPRESSOR L\M E , , ,750,000 57, Alat Baru 6. CONCRETE
MIXER M3 E M3 43,125,000 32, Alat Baru 7. CRANE TON E Ton 765,516, , Alat Baru 8.
DUMP TRUCK 3-4 M3 E Ton 120,176,000 72, Alat Baru 9. FLAT BED TRUCK E Ton
204,843, , Alat Baru 10. EXCAVATOR HP E M3 682,812, , Alat Baru 11. FLAT BED TRUCK
3-4 M3 E M3 179,687, , Alat Baru 12. GENERATOR SET E KVA 341,406, , Alat Baru 13.
MOTOR GRADER >100 HP E ,843, , Alat Baru 14. TRACK LOADER HP E M3 220,000, ,
Alat Baru 15. WHEEL LOADER M3 E M3 571,406, , Alat Baru 16. THREE WHEEL ROLLER
6-8 T E Ton 428,770, , Alat Baru 17. TANDEM ROLLER 6-8 T. E Ton 348,593, , Alat Baru 18.
TIRE ROLLER 8-10 T. E Ton 343,750, , Alat Baru 19. VIBRATORY ROLLER 5-8 T. E Ton
424,062, , Alat Baru 20. CONCRETE VIBRATOR E ,265,625 18, Alat Baru 21. STONE
CRUSHER E T/Jam 1,423,250, , Alat Baru 22. WATER PUMP E ,375,000 23, Alat Baru 23.
WATER TANKER L. E ,000.0 Liter 115,000,000 91, Alat Baru 24. PEDESTRIAN ROLLER E
Ton 12,500,000 17, Alat Baru 25. TAMPER E Ton 16,171,875 18, Alat Baru 26. JACK
HAMMER E ,781,250 18, Alat Baru 27. FULVI MIXER E ,000,000 56, Alat Baru 28.
CONCRETE PUMP E M3 112,500,000 65, Alat Baru 29. TRAILER 20 TON E Ton 166,250, ,
Alat Baru 30. PILE DRIVER + HAMMER E Ton 70,000,000 45, Alat Baru 31. CRANE ON
TRACK 35 TON E Ton 350,000, , Alat Baru 32. WELDING SET E Amp 17,500,000 41, Alat
Baru 33. BORE PILE MACHINE E ,000.0 Meter 2,250,000, , Alat Baru 34. ASPHALT LIQUID
MIXER E ,000.0 Liter 15,000,000 26, Alat Baru 35. TRAILLER 15 TON E Ton 115,000, , Alat
Baru 36. ROCK DRILL BREAKER E ,721,250 42, Alat Baru 37. COLD MILLING E ,750, ,
Alat Baru 38. VIBRATORY ROLLER 1 T. E Ton 48,000,000 30, Alat Baru File : xls.ms_office

2 E155 E157 E154 E001 E301 E06 E07 E212 E221 E10 E11 E12 E010 E14 E052 E080 E081
E084 E082 E089 E031 E341 E182 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E36
E37 ANALIS E asphalt mixing plants asphalt finisher asphalt sprayer bulldozer air compressor
concrete mixer crane truck dump truck excavator flat bed truck generator set motor grader track
loader whell loader three whell roller tandem roller pneumatic tire roller vibratory roller concrete
vibrator stone crusher water pump water tanker pedestrian roller plate temper jack hammer fulvi
mixer concrete pump trailer pile diver hammer crane on truck velding set bore pile asphalt liquid
mixer trailler cold milling (winget) rock drill breaker

3 URAIAN ANALISA ALAT No. U R A I A N KODE KOEF. SATUAN KET. A. URAIAN


PERALATAN 1. Jenis Peralatan TRAILLER 15 TON E35 2. Tenaga Pw HP 3. Kapasitas Cp
15.0 Ton 4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun b. Jam Kerja Dalam 1 Tahun W
1,500.0 Jam c. Harga Alat B 115,000,000 Rupiah 5. Alat Yang Dipakai : a. Umur Ekonomis A'
10.0 Tahun Alat Baru b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru c. Harga Alat (*)
B' 115,000,000 Rupiah Alat Baru B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 %
x B C 11,500,000 Rupiah 2. Faktor Angsuran Modal = i x (1 + i)^a' D (1 + i)^a' Biaya Pasti per
Jam : a. Biaya Pengembalian Modal = ( B' - C ) x D E 13, Rupiah W' b. Asuransi, dll = x B' F
Rupiah W' Biaya Pasti per Jam = ( E + F ) G 13, Rupiah C. BIAYA OPERASI PER JAM
KERJA 1. Bahan Bakar = ( Ltr/HP/Jam) x Pw x Ms H 39, Rupiah 2. Pelumas = ( Ltr/HP/Jam) x
Pw x Mp I 26, Rupiah 3. Perawatan dan = (12,5 % - 17,5 %) x B K 9, Rupiah perbaikan W' 4.
Operator = ( 1 Orang / Jam ) x U1 L 14, Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2
M 19, Rupiah Biaya Operasi per Jam = (H+I+K+L+M) P 108, Rupiah D. TOTAL BIAYA
SEWA ALAT / JAM = ( G + P ) T 122, Rupiah E. LAIN - LAIN 1. Tingkat Suku Bunga i % /
Tahun 2. Upah Operator / Sopir U1 14, Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 6,
Rp./Jam 4. Bahan Bakar Bensin Mb 2, Liter 5. Bahan Bakar Solar Ms 2, Liter 6. Minyak
Pelumas Mp 17, Liter 7. PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan File :
xls.ms_office

4 URAIAN ANALISA ALAT No. U R A I A N KODE KOEF. SATUAN KET. A. URAIAN


PERALATAN 1. Jenis Peralatan COLD MILLING (WINGET) E36 2. Tenaga Pw HP 3.
Kapasitas Cp Alat Baru : a. Umur Ekonomis A 10.0 Tahun b. Jam Kerja Dalam 1 Tahun W
1,500.0 Jam c. Harga Alat B 474,750,000 Rupiah 5. Alat Yang Dipakai : a. Umur Ekonomis A'
5.0 Tahun Alat Baru b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru c. Harga Alat (*) B'
474,750,000 Rupiah Alat Baru B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x
B C 47,475,000 Rupiah 2. Faktor Angsuran Modal = i x (1 + i)^a' D (1 + i)^a' Biaya Pasti per
Jam : a. Biaya Pengembalian Modal = ( B' - C ) x D E 82, Rupiah W' b. Asuransi, dll = x B' F
Rupiah W' Biaya Pasti per Jam = ( E + F ) G 83, Rupiah C. BIAYA OPERASI PER JAM
KERJA 1. Bahan Bakar = ( Ltr/HP/Jam) x Pw x Ms H 32, Rupiah 2. Pelumas = ( Ltr/HP/Jam) x
Pw x Mp I 21, Rupiah 3. Perawatan dan = (12,5 % - 17,5 %) x B' K 39, Rupiah perbaikan W' 4.
Operator = ( 1 Orang / Jam ) x U1 L 14, Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2
M 19, Rupiah Biaya Operasi per Jam = (H+I+K+L+M) P 127, Rupiah D. TOTAL BIAYA
SEWA ALAT / JAM = ( G + P ) T 211, Rupiah E. LAIN - LAIN 1. Tingkat Suku Bunga i % /
Tahun 2. Upah Operator / Sopir U1 14, Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 6,
Rp./Jam 4. Bahan Bakar Bensin Mb 2, Liter 5. Bahan Bakar Solar Ms 2, Liter 6. Minyak
Pelumas Mp 17, Liter 7. PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan File :
xls.ms_office URAIAN ANALISA ALAT

5 No. U R A I A N KODE KOEF. SATUAN KET. A. URAIAN PERALATAN 1. Jenis


Peralatan ROCK DRILL BREAKER E37 2. Tenaga Pw 3.0 HP 3. Kapasitas Cp Alat Baru : a.
Umur Ekonomis A 10.0 Tahun b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam c. Harga Alat B
27,721,250 Rupiah 5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru b. Jam
Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru c. Harga Alat (*) B' 27,721,250 Rupiah Alat
Baru B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 2,772,125 Rupiah 2.
Faktor Angsuran Modal = i x (1 + i)^a' D (1 + i)^a' Biaya Pasti per Jam : a. Biaya Pengembalian
Modal = ( B' - C ) x D E 4, Rupiah W' b. Asuransi, dll = x B' F Rupiah W' Biaya Pasti per Jam =
( E + F ) G 4, Rupiah C. BIAYA OPERASI PER JAM KERJA 1. Bahan Bakar = ( Ltr/HP/Jam)
x Pw x Ms H Rupiah 2. Pelumas = ( Ltr/HP/Jam) x Pw x Mp I Rupiah 3. Perawatan dan = (12,5
% - 17,5 %) x B K 2, Rupiah perbaikan W' 4. Operator = ( 1 Orang / Jam ) x U1 L 14, Rupiah 5.
Pembantu Operator = ( 1 Orang / Jam ) x U2 M 19, Rupiah Biaya Operasi per Jam =
(H+I+K+L+M) P 37, Rupiah D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 42, Rupiah
E. LAIN - LAIN 1. Tingkat Suku Bunga i % / Tahun 2. Upah Operator / Sopir U1 14, Rp./Jam 3.
Upah Pembantu Operator / Pmb.Sopir U2 6, Rp./Jam 4. Bahan Bakar Bensin Mb 2, Liter 5.
Bahan Bakar Solar Ms 2, Liter 6. Minyak Pelumas Mp 17, Liter 7. PPN diperhitungkan pada
lembar Rekapitulasi Biaya Pekerjaan File : xls.ms_office