You are on page 1of 24

BECHTEL

PLANT DESIGN & PIPING

ENGINEERING DESIGN GUIDE FOR


EQUIPMENT NOZZLE LOCATIONS
3DG P22 002, Rev. 00, 08/92
Prepared by: Bob Tarr
Approved by: E.F. Bausbacher

TABLE OF CONTENTS

Page No.

LIST OF FIGURES 2

LIST OF EQUIPMENT 3

1.0 PURPOSE 4

O:\WINWORD\3DG\P22\002-00.DOC PAGE 1 OF 1
LIST OF FIGURES

Figure 1 Centrifugal Pump - Electric Motor


Figure 2 Centrifugal Pump - Turbine Drive
Figure 3 Shell and Tube Exchanger
Figure 4 Shell and Tube Exchanger
Figure 5 Shell and Tube Nozzle Arrangements
Figure 6 Shell and Tube - Kettle Type, Nozzle Arrangements
Figure 7 Shell and Tube - Vertical Reboiler
Figure 8 Double Pipe Exchanger
Figure 9 Air Cooled Heat Exchanger
Figure 10 Horizontal Drum
Figure 11 Vertical Reactor - High Pressure
Figure 12 Spherical Reactor
Figure 13 Horizontal Reactor
Figure 14 Fractionation Tower - Internal Details
Figure 15 Fractionation Tower - Typical Orientation
Figure 16 Vessels - Motor/Agitator
Figure 17 Furnace - Box Type
Figure 18 Furnace - Cylindrical
Figure 19 Reciprocating compressors
Figure 20 Centrifugal Compressors - Horizontal/Vertical Split Case
Figure 21 Centrifugal Compressors - Steam Turbine

O:\WINWORD\3DG\P22\002-00.DOC PAGE 2 OF 2
LIST OF EQUIPMENT

Page No.

2.1.1 Centrifugal Pump - Motor Drive 5


2.1.2 Centrifugal Pump - Turbine Drive 6
2.1.3 Shell and Tube Exchangers 7
2.1.4 Shell and Tube Exchangers 8
2.1.5 Kettle Type Exchangers 9
2.1.6 Shell and Tube - Vertical Reboiler 10
2.1.7 Double Pipe Exchangers 11
2.1.8 Air Cooled Heat Exchanger 12
2.1.9 Horizontal Drum 13
2.1.10 Vertical Reactor - High Pressure 14
2.1.11 Reactor - Spherical - Horizontal 15
2.1.12 Fractionation Towers 16
2.1.13 Fractionation Towers 17
2.1.14 Fractionation Towers 18
2.1.15 Vessels - Motor/Agitator 19
2.1.16 Furnace - Box Type 20
2.1.17 Furnace - Cylindrical 21
2.1.18 Reciprocating Compressors 22
2.1.19 Centrifugal Compressors 23
2.1.20 Centrifugal Compressors - Steam Turbine 24

O:\WINWORD\3DG\P22\002-00.DOC PAGE 3 OF 3
1.0 PURPOSE

This design guide is intended to highlight criteria to be considered when


establishing equipment nozzle locations. Where options do exist, the piping
designer must make the final decision based upon the circumstances at
hand. This guide is not intended to address normal piping issues as they
are to be covered in the respective guides for each equipment item.

O:\WINWORD\3DG\P22\002-00.DOC PAGE 4 OF 4
O:\WINWORD\3DG\P22\002-00.DOC PAGE 5 OF 5
O:\WINWORD\3DG\P22\002-00.DOC PAGE 6 OF 6
O:\WINWORD\3DG\P22\002-00.DOC PAGE 7 OF 7
O:\WINWORD\3DG\P22\002-00.DOC PAGE 8 OF 8
O:\WINWORD\3DG\P22\002-00.DOC PAGE 9 OF 9
O:\WINWORD\3DG\P22\002-00.DOC PAGE 10 OF 10
O:\WINWORD\3DG\P22\002-00.DOC PAGE 11 OF 11
O:\WINWORD\3DG\P22\002-00.DOC PAGE 12 OF 12
O:\WINWORD\3DG\P22\002-00.DOC PAGE 13 OF 13
O:\WINWORD\3DG\P22\002-00.DOC PAGE 14 OF 14
O:\WINWORD\3DG\P22\002-00.DOC PAGE 15 OF 15
O:\WINWORD\3DG\P22\002-00.DOC PAGE 16 OF 16
O:\WINWORD\3DG\P22\002-00.DOC PAGE 17 OF 17
O:\WINWORD\3DG\P22\002-00.DOC PAGE 18 OF 18
O:\WINWORD\3DG\P22\002-00.DOC PAGE 19 OF 19
O:\WINWORD\3DG\P22\002-00.DOC PAGE 20 OF 20
O:\WINWORD\3DG\P22\002-00.DOC PAGE 21 OF 21
O:\WINWORD\3DG\P22\002-00.DOC PAGE 22 OF 22
O:\WINWORD\3DG\P22\002-00.DOC PAGE 23 OF 23
O:\WINWORD\3DG\P22\002-00.DOC PAGE 24 OF 24

You might also like