You are on page 1of 10
© LH ORE TECH coustmucTion conporarion Py NS Hoenn ons Pron ris s12500 Pax) esa Enalmangeowectiscom DAILY TIME RECORD [DATE: ‘5-Jan-2021, PROJECT TITLE: Layon Sanitary Landfil PROJECT NUMBER: GSWA 003-18 AW PM EE SIGNATURE EE INTIAL OR| TOTAL) “tconty at toa No | cost coDE NAME SIGNATURE HRS. | nor posta my ne in_| our in | our, eco HE Operator 0 i f) 2 | 06-6) | Abella, Andrew C. Ne =e rire 2 7 |Aguinaldo, Ismael M. Dla Hy 4 |_o&=6l | Alaman, DiosdadoT. (02% A [Ea Hjem 5 | ——_| Bobis, Florentino Jr. N. a a ip 6 7 3 2 ROD ¢~ v7} _| Calilung, Rogelio G. (—__| Camungao, Dindo \( Caritay, Amel C. DiAIR PsleelsPepe SiN TH RAIA) AO VOY YO Dangiw, Laudencio B. ([sreo 3:90] 10 Gandawali, Anuar T. < Rez 1 \__| Gonzales, Amold 0. v9 By rn Juego, VictorioS. eae 72 eZ) ya Mondalo, Reymund T._ | Sip |g > [ae : Nelmida, Alberto M a 15 Nelmida, Graymar To Ke 1 [a6 ‘Orejola, Michael S._ [O73 i Peje, Renato P. en Ramos, Allan D. lo” Thomas, Edmond B. 20 OLEAN Valdez, Augustin Jr. S. oo Tass, | [15a nore: 1. Please make sure that all envis in this DTR are complete and final before submiting to Payrblhin-Charge. i This should always be submitted to Payrol-In-Charge at the end ofthe day. I certify and approve thatthe above time racked of Emy (e8) RECEIVED BY: are tue and correc. Q| FROJECTENGIEER iE PRNTED NAVE AD [ACCOUNTING DEPARTMENT CORE TECH CONSTRUCTION CORPORATION Sen cout rr Core Drive, Sst 400, Tarr, Gunn 9013, hone (7 755000; Fa (71) 479-5500 Eat manor com DAILY TIME RECORD DATE: 5-Jan-2024 [PROJECT TITLE: Layon Sanitary Landfil PROJECT NUMBER: GSWA 003-18 Tee nmAL On| J rors] SE SIGNATURE no| cost coe NAME SEUNG? ae) [ase | our ww [our ene Carpenter 2&—6 | Dinglasan, Edgardo D. Alga is Duran, Marino M. (a) 57a Pelagio,FelimonP. gl |alchal [S@ o ‘Sahagun, Angelo S A 25 6&2 _| Vista, Rene R. caf] J Ke" [Cement mason 63-6] | Baluyut, Emerson C. ozo eRe 1520 0 [OK Duya, James G. o:20| 7 Wd 11 ari Lansang Jr, PedroM, (20 a eG 2 | o&=2)_| Mungcal, Roel S. 00/37: BH OW eS 4 [Steelman | 15 | —— | Malasarte, Gregorio B. 16 | S$—S_| Tiongco, Edgar M. OO es (BR 7 18 19 20 INoTE: 1. Please make sure that all entries inthis DTR are compete and final before submiting to Payroll.in-Charge, [2. This should always be submited to Payrol-In-Charge at the end ofthe day. RECEIVED BY: | certy and approve thatthe above time record o\Employees ( ACCOUNTING DEPARTMENT a € ®@ Dp TECH CONSTRUCTION CORPORATION 388 Sour Marne Cops Deve, Se 400, arin, Guam SETS Phone (61) 48.5000 Fax 673) 47-5500 Emak mamecreci com ORD DAILY TIME REC: [DATE: ‘S-Jan-2021 PROJECT TITLE: Layon Sanitary Landfil PROJECT NUMBER: GSWA 003-18 Ail Pin EE SIGNATURE no | cost cove nae EIA on fe x} our w_| our i Welder l DD 2 | 7&4] _|Laparan, Vincent G. | VIF lis:o}2336 & 3 | /€=0)_ ‘Monta, Christopher G.V 2830-7 + | a& = 4]| Moratillo, Sonny D. 2 [(St0] g pe alsa VA 1. Please make sure that all entries in this OTR are complate and final before submiting to Payrll-n-Charge. [2 This shoud always be submited fo Payrol-n-Charge at he end ofthe day. RECEIVED BY: =CT ENGINE |ACCOUNTING DEPARTMENT ‘PROTE (PRINTED NAME & SIGHOPORE) ITERNATIONAL 2 & cone Tech renner! Prine tin aso Fon oF) 47500 [OATE: 5-Jan-2021 DAILY TIME RECORD. PROJECT TITLE: _Layon Sanitary Landi [PROJECT NUMBER: GSWA 003-18 1. Please make sure that al ones in this OTR are complete and fra before submiting to Payot 2. Ths shoud alvays be submited to Payro-n-Charge a the end of the day. 7 —] WIT IATORE No NAME cost cove OR Tansy | hesee ecame relies ras 1__|Dump Truck Driver 2 7) = 3) Camacho, Timothy Charles G. v 4 Caoile, Richard Jayson O. 5 Castro, Art Junior 5 © | Castro, JuiiaT. OF=4_ [ead abe estat 7 Castro, Vincent D.M. @_| Chang, Cini P. Cee) LY > 9 Chargualaf, Peter John A. 10 _| Duenas, Leinani R. 1t_[ Flores, Ronnie L. rT 72. | Flores, Shirley M. SEmOmIZe 13__| Garcia, Jonathan J. Be 14__| Hernandez, John T. 45. | Heroncio, Jefrey oral 16 | King, Juan Jr. T. 47_| Leon Guerrero, LarryM. | Ok—A A _ IVE 78 | Magofna, Jose F. 19 | Manalo Jr., John M. ws eer [Menten ee CEP 1b Iga ee Charge | conty and approve that the above ime record of = (EE) are true and corec. RECEIVED BY: JACCOUNTING DEPARTMENT ® > CORE TECH INTERNATIONAL Sea neea ern Corsi Sun) Tenn Com NO ee eT asa8 Tm DAILY TIME RECORD. (DATE: 5-Jan-2021 [PROJECT TITLE: __Layon Sanitary Landf [PROJECT NUMBER: GSWA 003-16. Je AM. EE INITIAL PM ‘SIGNATURE, S ae Se coe oR | cae watts oye ww _|our|sionature! w | our myogeenecare 1_|Dump Truck Driver 1 2_| Manibusan, Joel J. OCF] as [Sz g ik 3_| Mendiola, Joseph Junior C. GF —6) oj ha a 3 ({ 4 | Paimer, Wayne A. CLA) zi qe |e 5__| Palomo, Donavan P. fr J 8 __| Perez, Nathan M. 4 7_|/Reyes, Cris Jude P. a] 8 _| Yanger, Christian C. sca ® 4| Wiss 7" it FE 2 3 = 4 Z 16 as 7 z 18 @ = Z 1: lease make sure that al entries inthis OTR are complete and fal before submiting to Payrol-in-Charge. 2. This should aays be submited to Payol-n-Charge at the endo he dy. RECEIVED By: |ACCOUNTING DEPARTMENT = (een r ~~ RE TECH INTERNATIONAL © Sethe ne DAILY TIME RECORD (BATE: 6Jan-2021 PROJECT TITLE: _Layon Sontary Landi [PROJECT NUMBER! GSWA 003-18 — 7] GE WIA, [_—_ Pa SIGNATURE No NAME cost cope oR Fata ieee cece ea iw [our}sionaure| mw | our rt pyeara us comt 1_|Carpenter f 2_| Cariazo Jr, Rodolfo. | ob=d, SUA aa [aw Perea 3_| Cruz, Rico James S. Pepa e 5 4 | Dela Cruz, Randy A. Ir §_[DeVenencia, Anthony T. “F=f AD rh | [7 AO 8 _| Nicolas, Noly P. 7 [Perala,toteyT lo =< |Saiel (Pee LD 5 1 t 4 5 a ’ 10 [Welder 11_| George, Harry D. = Ssl@o0l Ha lar |2zz1 12_| Pring, Egil D. = AW = \/2as| $500 » 45_|Plumber 48 |Reyes, Johnny VincentS.[_ &—%T [3p (3.00 2 Ths should always be submited to Payrltin-Charge atthe end of he day. is: |: Ptease make sure that all envies inthis OTR are complete and fal before submiting to Payol-n-Charge, RECEIVED By: |ACCOUNTING DEPARTMENT > CORE TECH INTERNATIONAL ORs DAILY TIME RECORD DATE: _S-Jan-2024 [PROJECT TITLE: Layon Sanitary Lanai [PROJECT NUMBER: GSWA 003-18 | | EE INTIAL Pi ‘SIGNATURE No NAME cost cope oR y_| our] SIGNATURE: oral w_| our cra core HAS | tcaty nat ethos crate Spotter/General Helper Gordon, Chargualaf J. ‘Ada Jr., Peter B. 4 Cruz, Bleyton D. s Flores, Jevin R. g 3 Muna, Kenneth J. 65— a) bs oa S Zs Perez, Kenneth M. i 2 3 4 5 6 | Muna, Benjamin D. 7 8 o ‘Sana, Joseph C. 10 _| San Nicolas, Brian J. 11_| Taimanglo, Jockin SN. | o&—Al 12_| Taimanglo, Joshua J. GEA ia 43__| Taimanglo, Justin M. 14 _| Taitague, Mark F.Q. INoTE: | Piease make sure that all enites in his OTR are complete and final before sutmiting to Payralt-i mis shoud aways be submited to Payrl-in-Charge al the end of he day. Charge. (EE) are twe and corect. RECEIVED BY: |ACCOUNTING DEPARTMENT Gone! Contactor PH CORPORATION DAILY TIME RECORD DATE: 5-Jan-2024 PROJECT NAME: Layon Sanitary Landfill, | rl AM EE SIGNATURE lo NAME EE imriat on] —t*—frorat| eon ant cost CODE SIGNATI HRS, In_| our in_| our, ; [Torres, Kraven R. 7) [a Ao | 2 UU [34 [4 [5 6 1 8 9 x 10 ff 13 | 14 18 16 s 17 a 18 z a 19 20 1 TOTAL REGULAR HOURS: [TOTAL OVERTIME HOURS: NOTE: 1. Please make sure that all envies in this OTR are completo and final before submiting to Payro-n-Char 2. This should always be submited to Payrolin-Charge atthe end ofthe da I certiy and approve that the above time foyoos (EE) are true and RECEIVED BY. ae TURE: D NAME: ———— f PROJECT "ACCOUNTING DEPARTMENT,

You might also like