ee
~
) >> CORE TE CH CONSTRUCTION CORPORATION
ee ee on
DAILY TIME RECORD
DATE: 7-Jan-2021 maces
PROJECT TITLE: Layon Sanitary Landfill
[PROJECT NUMBER: GSWA 003-18
AM ee inrTiaL OR; —P Tora] SE SIGNATURE
No | cost cope NAME woul sonrure | [ac | ee
1 HE Operator |
2 | o¢=v1_| Abella, Andrew C. Gas we ig
3 Aguinaldo, Ismael M. rs ie
aA Alaman, Diosdado T,X HE ie
G Bobis, Florentino Jr. N. ? 4u &
6 Calilung, Rogelio G.
7 Camungao, Dindo D. is
‘= Caritay, Amel C. iS
8 \_| Dangiw, Laudencio B. ie
10 Gandawali, Anuar T. ie
a } Gonzales, Arnold O. le
12 Juego, Victorio S. ts
3 Mondalo, Reymund T. ie
| 14 Nelmida, Alberto M. a es
15 Nelmida, Graymar M. Ed) 7
6 \___]| Orejola, Michael S. Ie
7 Peje, Renato P. 40 a
16 Ramos, Allan D. GE g
8 Thomas, Edmond B. E e
20 | DE 0] _| Valdez, Augustin Jr. S. y eelA Kiel? |Dnne |<
NOTE:
1. Please make sure that all entries in this DTR are complete and final before submiting to Payrol-n-Charge,
2. This should always be submitted to Payrol-in-Charge at the end of the day.
RECEIVED BY:
2
‘ACCOUNTING DEPARTMENT
RS oe]D> CORE TECH CONSTRUCTION c:
RE TE ORPORATION
DAILY TIME RECORD
[DATE: 7-Jan-2021 Ruse a
PROJECT TITLE: _Layon Sanitary Landfil =
PROJECT NUMBER: GSWA 003-18
Maen es PM
No| cost cope NAME Fes ane |
in our} SN
1 Carpenter lO
2 | 6-4 | Dinglasan, Edgardo D. As : e
a Duran, Marino M. i is BS
a Pelagio, FelimonP. Gil | A PZ ie
5 Sahagun, Angelo S, q oe
6 | 6&-- | Vistal, Rene R. | ] e
1
7
8 |Cement mason L
9 | Gy 3B [Baluyut, Emerson c. 676 PY | Ie 0
10 | 6 £-7) | Duya, James G. os
| Op-- | Lansang Jr., Pedro M. (7)
12 | @2—2) | Mungeal, Roel S.
3H 0% =
Fig
4 ‘Steelman
15 | Gp-Z | Malasarte,GregorioB. [7 96 WIG
16 | Cei—e) _| Tiongco, Edgar M. e=
00
20
NOTE) dv balan oer niu DIR ee eee rd tn bts srg io Peytiechare
2. This should always be submitted to Payrol-in-Charge at the end of the day.
RECEIVED BY:
‘ACCOUNTING DEPARTMENTy
Gq CORE TE CH CONSTRUCTION CORPORATION
yp Seance CONSTR Tamuning, Gus
Phone: (671) 475-5000 Pax (671) 41.8800" Ema mangertehit om
DAILY TIME RECORD
[DATE: 7-Jan-2021
[PROJECT TITLE: _Layon Sanitary Landfil
[PROJECT NUMBER: GSWA 003-18
| No] cost cope NAME
1 Welder
2 Laparan, Vincent G.
3 (ea | Monta, Christopher G.
4 | G74 | Moratillo, Sonny D.
s | 6) | Santiago, Christopher M.
6
7
@
@
Plumber
GE-A) Bactad, Crisaldo R.
1. Prease make sure that all enties in this DTR are complete and final before submitting to PayrolFin-Charge.
2. This should always be submitted to Payrol-in-Charge at the end of the day.
| centty and approve that the above time RECEIVED BY:
‘re ue and corroct.
ACCOUNTING DEPARTMENT‘368 South Marine Corps Drive, Sute 400, Tamering, Guam 96913
Phene:(671) 4785000. Pax (671) 4759300 Emat mangeorechn com
’ > CORE TECH CONSTRUCTION CORPORATION
DAILY TIME RECORD
DATE 7-Jan-2021 ]
PROJECT TITLE: Layon Sanitary Landfill, is
[PROJECT NUMBER: GSWA 003-18
in_| our
7 |Spotter/General Helper
2 | 06~U) | Baza, Vincent C. 730] 1) | GE
3 | O¥~-#) | Cruz, Blane Frankie M. VPs Ey
+ | O€#7_|Wasisang, Terry 207% GAR
; U
° |
7
:
Va
70
7
2
8
1%
5
76
7
7
78
20
NOTE:
+. Please make sure that all entries in this DTR are complete and final before submitting to Payroltin-Charge.
2 This should always be submitted to Payrol-In-Cherge at the end of the day.
| certy and approve thatthe above time record of Employees /) RECEIVED BY:
‘ate true and correct.
‘ACCOUNTING DEPARTMENT——S EO NR eT OO as ez 1 ey Nee ARPT, A LE eee ee ee ee
) CORE TECH INTERNATIONAL
Dy Sue 0,38 Su Marin Crs Dive, Sut 400, Tamnng, Gua
Prone: (672)4755000 Fx (o} 13 200
DAILY TIME RECORD
paTE:_T-Jan-2024 7aJan-2024 za
PROJECT TITLE: Layon Sanitary Landfill 2
[PROJECT NUMBER: GSWA 003-18 TE 1
EE INITIAL ]
No NAME cost cope oR |
mv four |stonarore| our] emnesaesenme | |
1_|HE Operator | | i
2_| Park, Jin K. Tk topo tinn |Se~ PE |
2_| Quindo Jr, June G "1E—2)_|e'30) Isa) §
4) |iRomero, Jiony A, Ord) eraS—— pare
s_| Daniel Taijeron
6
i
8 “a :
2 3
10 : 19
4
2
2
4
16
1
7
‘8
9
2
nore
1 Please mat sue hata ents nis OTR are comple and al before suming fo Payon-Chare.
> Ths shoud nays be submited Payrokn-Sharge the end they.
RECEIVED By
JaccounTiNG DEPARTIIENTfy» CORE TECH INTERNATIONAL
Py Sule 400.388 Seth Mate Cos Dive Ste 400, Targ, Guo 2913
Prone (672) 473 000. Fax (i) Taso
DATE:_7-Jan-2024
DAILY TIME RECORD
[PROJECT TITLE:
[PROJECT NUMBER: GSWA 003-18
Layon Sanitary Landfill
AM] EE INITIAL
NO NAME cost cope oR
w_| our |sionaTure
Dump Truck Driver
Afaisen, Jimmy J. Oy—4)
Camacho, Timothy Charles G.
5
2
= 3
4 | Cacile, Richard Jayson O. +
5_| Castro, Art Junior |
@_| Castro, Julia T. ee-4 ox Bred EA fase oe
7_| Castro, Vincent D.M. ( > | ES
@_| Chang, Cinji P. OF—7) sts
9 | Chargualaf, PeterJonna. og-cf | 1 | { S)
19_| Duenas, Leinani R. a5.
{i | Flores| Ronnie OF len| [ke ie
12_| Flores, Shirley M. i =
43, | Garcia, Jonathan J. Ce-7 b= se Oe P
14 _| Hernandez, John T. qe
15_ | Heroncio, Jefrey ap-7
76 | King, Juan Jr. T. =
i7_| Leon Guerrero, Lary M. | Ot =<]. Ca: Ze! 2
18, | Magotna, Jose F,
18_| Manalo Jr., John M.
20_ | Manibusan, Eric |
INoTE:
inal before submiting to Payrlbin-Charge,
Please make sure that all entries inthis DTR are complete and firal before submiting to
[2 This should atways be submitted fo Payrol-In-Charge atthe end of the day.
I certty and approve thatthe above time red of Eny
8 (EE) are tue and correct.
RECEIVED BY:
|ACCOUNTING DEPARTMENT] 1e)) CORE TECH INTERNATIONAL
Sancoucetecn one cennaseetn tener oon
NO ean as
DAILY TIME RECORD
(DATE: _7-Jan-2024
PROJECT TITLE: Layon Sanitary Landfl
PROJECT NUMBER: GSWA 003-18
AM] EE INITIAL
No Ne OS ICODE, OR {cert tal ba tal os eposte
in_|our|SIGNATURE| w_| our myn ec
SIGNATURE
+ [Dump Truck Driver
‘Manibusan, Joel J. eat] GE
Mendiola, Joseph Junior C.
Palomo, Donavan P.
Palmer, Wayne A. OFA) Pa en
Reyes, Cris Jude P.
Yanger, Christian C.
2
3
a
5
6 _| Perez, Nathan M.
7
8
9
20
Nore
ore make sr that
Fuss aye be sutra to Payron-Chrg ath
‘alentries inthis DTR are complete and final before submiting o Payrot-n-Charge.
nd of the day.
| certty and approve that the above time
(€E) are tue and correct
RECEIVED BY:
|AcCOUNTING DEPARTMENTFR
DG CORE TECH INTERNATIONAL
ron: (672)473 3000. Fou (GP) A760
DAILY TIME RECORD
(SATE: _7-Jan-2024
PROJECT TITLE: Layon Sanitary Landfill
PROJECT NUMBER: GSWA 003-18,
[aaa
No NAME cost cove OR
ww_| our | sionature
1 [Carpenter [
2 | Cariazo Jr, Rodolfo. | SK—4 by
3__| Cruz, Rico James S. Ox-y)_ 7)
4 |/Dela Cruz, Randy A.
5 | De Venencia, AnthonyT. O&~o) 1 AD
@_| Nicolas, Noly P. >
7_| Peralta, Jeffrey T. Ce:
@
yao
se make sue that all eniries in his DTR are complete and final before submitin to Payol-n- Charge,
la This should always be submited 9 Payrl-n-Charge atthe end ofthe day
70 [Welder
“1_| George, Harry D. [50 poe | He
72_| Pring, Egil D. G54 70
2
14
1
Plumber “
5
1 gq
7
7
‘el
®
79
70
20]
2
Nore
ameter tne crf Employes EE) fe and oc
fee ea RECEIVED BY:
|ACCOUNTING DEPARTMENTpare. _7-Jan-2021 a a NE oat:
[PROJECT TITLE: Layon Sanitary Landfill - a
PROJECT NUMBER: GSWA 003-18 = —— _ aa
me ee costcooe FE ER eR |
I |__| our|sionature| ww | our} | emmtstae see |
1_|Spotter/General Helper 5 ra
2. | Ada Jr., Peter B. 1 2]
3_| Cruz, Bleyton D. 5 maes|
4 | Flores, Jevin R. | 4
5 | Gordon, Chargualaf J |
6 [ Muna, Benjamin D. 8
7_|Muna, Kenneth J. OA EF t IEWle IZ
8__| Perez, Kenneth M. =|
ye Sana, Joseph C. a £
10 | San Nicolas, Brian J. |
11__| Taimanglo, Joekin SN. sy
12_| Taimanglo, Joshua J. Gi
13 | Taimanglo, Justin. |O&—A 30] 13
14_| Taitague, Mark F.Q. is
15 45}
16 te]
17 a
18 ig
19]
ewe mala ae at ares nh Tce nel pi srtg to Payrtin-Charge
cert and approve that te above te gordo Employees (EE re te and correct te
|AcCOUNTING DEPARTMENT
DDAILY TIME RECORD
TE: T-Jan-2021
ROJECT NAME: Layon Sanitary Landfill Bake
AMT PM, EE SIGNATURE
0, NAME {EE INITIAL OR | FOTAL| cart thatthe ota!
Cost CODE | SIGNATURE HRS | hours opposite my
IN_| OUT IN| our name are correct
1 |Torres, Kraven R.
10
14
43
i4
15
16
7
18,
19 \
20 l
TOTAL REGULAR HOURS: [TOTAL OVERTIME HOURS:
NOTE: 1. Please make sure that all entries in this DTR are complete and final before submitting to Payroll-in-Charge
2. This should always be submitted to Payrol-in-Charge at the end of the day
| certify and approve that the above time record of Employees (EE) are true aN RECEIVED BY:
correct
|SIGNATURE: —E
|PRINTED NAME:
PROJECT ENGINEER. ‘ACCOUNTING DEPARTMENT.