You are on page 1of 10
ee ~ ) >> CORE TE CH CONSTRUCTION CORPORATION ee ee on DAILY TIME RECORD DATE: 7-Jan-2021 maces PROJECT TITLE: Layon Sanitary Landfill [PROJECT NUMBER: GSWA 003-18 AM ee inrTiaL OR; —P Tora] SE SIGNATURE No | cost cope NAME woul sonrure | [ac | ee 1 HE Operator | 2 | o¢=v1_| Abella, Andrew C. Gas we ig 3 Aguinaldo, Ismael M. rs ie aA Alaman, Diosdado T,X HE ie G Bobis, Florentino Jr. N. ? 4u & 6 Calilung, Rogelio G. 7 Camungao, Dindo D. is ‘= Caritay, Amel C. iS 8 \_| Dangiw, Laudencio B. ie 10 Gandawali, Anuar T. ie a } Gonzales, Arnold O. le 12 Juego, Victorio S. ts 3 Mondalo, Reymund T. ie | 14 Nelmida, Alberto M. a es 15 Nelmida, Graymar M. Ed) 7 6 \___]| Orejola, Michael S. Ie 7 Peje, Renato P. 40 a 16 Ramos, Allan D. GE g 8 Thomas, Edmond B. E e 20 | DE 0] _| Valdez, Augustin Jr. S. y eelA Kiel? |Dnne |< NOTE: 1. Please make sure that all entries in this DTR are complete and final before submiting to Payrol-n-Charge, 2. This should always be submitted to Payrol-in-Charge at the end of the day. RECEIVED BY: 2 ‘ACCOUNTING DEPARTMENT RS oe] D> CORE TECH CONSTRUCTION c: RE TE ORPORATION DAILY TIME RECORD [DATE: 7-Jan-2021 Ruse a PROJECT TITLE: _Layon Sanitary Landfil = PROJECT NUMBER: GSWA 003-18 Maen es PM No| cost cope NAME Fes ane | in our} SN 1 Carpenter lO 2 | 6-4 | Dinglasan, Edgardo D. As : e a Duran, Marino M. i is BS a Pelagio, FelimonP. Gil | A PZ ie 5 Sahagun, Angelo S, q oe 6 | 6&-- | Vistal, Rene R. | ] e 1 7 8 |Cement mason L 9 | Gy 3B [Baluyut, Emerson c. 676 PY | Ie 0 10 | 6 £-7) | Duya, James G. os | Op-- | Lansang Jr., Pedro M. (7) 12 | @2—2) | Mungeal, Roel S. 3H 0% = Fig 4 ‘Steelman 15 | Gp-Z | Malasarte,GregorioB. [7 96 WIG 16 | Cei—e) _| Tiongco, Edgar M. e= 00 20 NOTE) dv balan oer niu DIR ee eee rd tn bts srg io Peytiechare 2. This should always be submitted to Payrol-in-Charge at the end of the day. RECEIVED BY: ‘ACCOUNTING DEPARTMENT y Gq CORE TE CH CONSTRUCTION CORPORATION yp Seance CONSTR Tamuning, Gus Phone: (671) 475-5000 Pax (671) 41.8800" Ema mangertehit om DAILY TIME RECORD [DATE: 7-Jan-2021 [PROJECT TITLE: _Layon Sanitary Landfil [PROJECT NUMBER: GSWA 003-18 | No] cost cope NAME 1 Welder 2 Laparan, Vincent G. 3 (ea | Monta, Christopher G. 4 | G74 | Moratillo, Sonny D. s | 6) | Santiago, Christopher M. 6 7 @ @ Plumber GE-A) Bactad, Crisaldo R. 1. Prease make sure that all enties in this DTR are complete and final before submitting to PayrolFin-Charge. 2. This should always be submitted to Payrol-in-Charge at the end of the day. | centty and approve that the above time RECEIVED BY: ‘re ue and corroct. ACCOUNTING DEPARTMENT ‘368 South Marine Corps Drive, Sute 400, Tamering, Guam 96913 Phene:(671) 4785000. Pax (671) 4759300 Emat mangeorechn com ’ > CORE TECH CONSTRUCTION CORPORATION DAILY TIME RECORD DATE 7-Jan-2021 ] PROJECT TITLE: Layon Sanitary Landfill, is [PROJECT NUMBER: GSWA 003-18 in_| our 7 |Spotter/General Helper 2 | 06~U) | Baza, Vincent C. 730] 1) | GE 3 | O¥~-#) | Cruz, Blane Frankie M. VPs Ey + | O€#7_|Wasisang, Terry 207% GAR ; U ° | 7 : Va 70 7 2 8 1% 5 76 7 7 78 20 NOTE: +. Please make sure that all entries in this DTR are complete and final before submitting to Payroltin-Charge. 2 This should always be submitted to Payrol-In-Cherge at the end of the day. | certy and approve thatthe above time record of Employees /) RECEIVED BY: ‘ate true and correct. ‘ACCOUNTING DEPARTMENT ——S EO NR eT OO as ez 1 ey Nee ARPT, A LE eee ee ee ee ) CORE TECH INTERNATIONAL Dy Sue 0,38 Su Marin Crs Dive, Sut 400, Tamnng, Gua Prone: (672)4755000 Fx (o} 13 200 DAILY TIME RECORD paTE:_T-Jan-2024 7aJan-2024 za PROJECT TITLE: Layon Sanitary Landfill 2 [PROJECT NUMBER: GSWA 003-18 TE 1 EE INITIAL ] No NAME cost cope oR | mv four |stonarore| our] emnesaesenme | | 1_|HE Operator | | i 2_| Park, Jin K. Tk topo tinn |Se~ PE | 2_| Quindo Jr, June G "1E—2)_|e'30) Isa) § 4) |iRomero, Jiony A, Ord) eraS—— pare s_| Daniel Taijeron 6 i 8 “a : 2 3 10 : 19 4 2 2 4 16 1 7 ‘8 9 2 nore 1 Please mat sue hata ents nis OTR are comple and al before suming fo Payon-Chare. > Ths shoud nays be submited Payrokn-Sharge the end they. RECEIVED By JaccounTiNG DEPARTIIENT fy» CORE TECH INTERNATIONAL Py Sule 400.388 Seth Mate Cos Dive Ste 400, Targ, Guo 2913 Prone (672) 473 000. Fax (i) Taso DATE:_7-Jan-2024 DAILY TIME RECORD [PROJECT TITLE: [PROJECT NUMBER: GSWA 003-18 Layon Sanitary Landfill AM] EE INITIAL NO NAME cost cope oR w_| our |sionaTure Dump Truck Driver Afaisen, Jimmy J. Oy—4) Camacho, Timothy Charles G. 5 2 = 3 4 | Cacile, Richard Jayson O. + 5_| Castro, Art Junior | @_| Castro, Julia T. ee-4 ox Bred EA fase oe 7_| Castro, Vincent D.M. ( > | ES @_| Chang, Cinji P. OF—7) sts 9 | Chargualaf, PeterJonna. og-cf | 1 | { S) 19_| Duenas, Leinani R. a5. {i | Flores| Ronnie OF len| [ke ie 12_| Flores, Shirley M. i = 43, | Garcia, Jonathan J. Ce-7 b= se Oe P 14 _| Hernandez, John T. qe 15_ | Heroncio, Jefrey ap-7 76 | King, Juan Jr. T. = i7_| Leon Guerrero, Lary M. | Ot =<]. Ca: Ze! 2 18, | Magotna, Jose F, 18_| Manalo Jr., John M. 20_ | Manibusan, Eric | INoTE: inal before submiting to Payrlbin-Charge, Please make sure that all entries inthis DTR are complete and firal before submiting to [2 This should atways be submitted fo Payrol-In-Charge atthe end of the day. I certty and approve thatthe above time red of Eny 8 (EE) are tue and correct. RECEIVED BY: |ACCOUNTING DEPARTMENT ] 1e)) CORE TECH INTERNATIONAL Sancoucetecn one cennaseetn tener oon NO ean as DAILY TIME RECORD (DATE: _7-Jan-2024 PROJECT TITLE: Layon Sanitary Landfl PROJECT NUMBER: GSWA 003-18 AM] EE INITIAL No Ne OS ICODE, OR {cert tal ba tal os eposte in_|our|SIGNATURE| w_| our myn ec SIGNATURE + [Dump Truck Driver ‘Manibusan, Joel J. eat] GE Mendiola, Joseph Junior C. Palomo, Donavan P. Palmer, Wayne A. OFA) Pa en Reyes, Cris Jude P. Yanger, Christian C. 2 3 a 5 6 _| Perez, Nathan M. 7 8 9 20 Nore ore make sr that Fuss aye be sutra to Payron-Chrg ath ‘alentries inthis DTR are complete and final before submiting o Payrot-n-Charge. nd of the day. | certty and approve that the above time (€E) are tue and correct RECEIVED BY: |AcCOUNTING DEPARTMENT FR DG CORE TECH INTERNATIONAL ron: (672)473 3000. Fou (GP) A760 DAILY TIME RECORD (SATE: _7-Jan-2024 PROJECT TITLE: Layon Sanitary Landfill PROJECT NUMBER: GSWA 003-18, [aaa No NAME cost cove OR ww_| our | sionature 1 [Carpenter [ 2 | Cariazo Jr, Rodolfo. | SK—4 by 3__| Cruz, Rico James S. Ox-y)_ 7) 4 |/Dela Cruz, Randy A. 5 | De Venencia, AnthonyT. O&~o) 1 AD @_| Nicolas, Noly P. > 7_| Peralta, Jeffrey T. Ce: @ yao se make sue that all eniries in his DTR are complete and final before submitin to Payol-n- Charge, la This should always be submited 9 Payrl-n-Charge atthe end ofthe day 70 [Welder “1_| George, Harry D. [50 poe | He 72_| Pring, Egil D. G54 70 2 14 1 Plumber “ 5 1 gq 7 7 ‘el ® 79 70 20] 2 Nore ameter tne crf Employes EE) fe and oc fee ea RECEIVED BY: |ACCOUNTING DEPARTMENT pare. _7-Jan-2021 a a NE oat: [PROJECT TITLE: Layon Sanitary Landfill - a PROJECT NUMBER: GSWA 003-18 = —— _ aa me ee costcooe FE ER eR | I |__| our|sionature| ww | our} | emmtstae see | 1_|Spotter/General Helper 5 ra 2. | Ada Jr., Peter B. 1 2] 3_| Cruz, Bleyton D. 5 maes| 4 | Flores, Jevin R. | 4 5 | Gordon, Chargualaf J | 6 [ Muna, Benjamin D. 8 7_|Muna, Kenneth J. OA EF t IEWle IZ 8__| Perez, Kenneth M. =| ye Sana, Joseph C. a £ 10 | San Nicolas, Brian J. | 11__| Taimanglo, Joekin SN. sy 12_| Taimanglo, Joshua J. Gi 13 | Taimanglo, Justin. |O&—A 30] 13 14_| Taitague, Mark F.Q. is 15 45} 16 te] 17 a 18 ig 19] ewe mala ae at ares nh Tce nel pi srtg to Payrtin-Charge cert and approve that te above te gordo Employees (EE re te and correct te |AcCOUNTING DEPARTMENT D DAILY TIME RECORD TE: T-Jan-2021 ROJECT NAME: Layon Sanitary Landfill Bake AMT PM, EE SIGNATURE 0, NAME {EE INITIAL OR | FOTAL| cart thatthe ota! Cost CODE | SIGNATURE HRS | hours opposite my IN_| OUT IN| our name are correct 1 |Torres, Kraven R. 10 14 43 i4 15 16 7 18, 19 \ 20 l TOTAL REGULAR HOURS: [TOTAL OVERTIME HOURS: NOTE: 1. Please make sure that all entries in this DTR are complete and final before submitting to Payroll-in-Charge 2. This should always be submitted to Payrol-in-Charge at the end of the day | certify and approve that the above time record of Employees (EE) are true aN RECEIVED BY: correct |SIGNATURE: —E |PRINTED NAME: PROJECT ENGINEER. ‘ACCOUNTING DEPARTMENT.

You might also like