You are on page 1of 10
@ GD CORE TECH CONSTRUCTION CORPORATION RD Bi eeriares Sons De, te 0 Prone: 6747208 Poser} «788300 Eat mangers com DAILY TIME RECORD [DATE: 6-Jan-2021 ae PROJECT TITLE: Layon Sanitary Landfill |PROJECT NUMBER: GSWA 003-18 — Ti Pi No | cost cove NAME ea ries ww | our iN o HE Operator 2 oe ‘Abella, Andrew C. jb) The 3 Aguinaldo, Ismael M. (00 4 Alaman, DiosdadoT. [61 9) Ale 5 Bobis, Florentino Jr.N. 30 JE 8 Calilung, Rogelio G. EI Liye 7 \__[Camungao, Dindo D. w 8 Z| Caritay, Arnel C. |/sza0| e. Dangiw, Laudencio B Isola 10 Gandawali, Anuar T. Yo(\; (6°01 " Gonzales, Arnold 0. [ss ici 12 ‘Juego, Victorio S. ger” 5a] 13 \ Mondalo, Reymund T. AED _ (4 \ Nelmida, Alberto M Bz 5 Nelmida, GraymarM. [g4 C 16 Orejola, Michael S. 15.04 g 7 Peje, Renato P. oP = 8 Ramos, Allan D. CF 2 wl Thomas, Edmond B. ie =A IS. 0023:40 8 IS 20 | OF—d | Valdez, Augustin Jr. S. 2) Qucihz = iy NOTE MOTE se make sur that al entries in is OTR are complete and nal before submiting to Paycln-Chage, Pu shoud ays be smite Papago oy. \caty and approve tat he above tie G(ce)| RECEIVED By: ear tue and cock. ‘ACCOUNTING DEPARTMENT QB} CORE TECH CoNsTRUCTION CORPORATION WZ sees uses Caps Dine, Sut 00 Tar oa Phone: (671) 475000; Fax (671) #126500 Ea mandorwchrs con DAILY TIME RECORD DATE: 6-Jan-2021 PROJECT TITLE: Layon Sanitary Landfill PROJECT NUMBER: GSWA 003-18 = — Pat Jee iia on} —> in | ou a NO | COST CODE NAME SIGNATURE i ww [our (Carpenter s Cs—A_| Dinglasan, Edgardo D. | wt [be re of - 4 Duran, Marino M. 90 Hee] 170) z BO _cs==s] | Pelagio, Felimon P. 36] Sahagun, Angelo S. ; OF) | Vistal, Rene R. on) } 7 FOF Cement mason O$=47) |[Baluyut, Emersonc. (7 Zoi” |lB| F | LPO) 10 | a= | Duya, James G. (a) At TE) 8 | 9 8 11 | @&-c7 _| Lansang Jr., Pedro M. 6: 0 i 5: at 12 | 62-0) _| Mungcal, Rgel S. (S:0093:: Ss Ib 3 XQ # [Steelman 15 | ——— | Malasarte, Gregorio B. 16 | @e—A7_| Tiongoo, Edgar M CO |p| io) S | =a 2 INoTE: Please make sure that ll envies in ths DTR are complete and final before submiting to Payro-n-Charge. 2’ This should always be submited to PayrollIn-Charge at the end ofthe | certiy and approve that the above time record o\ Employees ( ‘re ire and correct. RECEIVED By: ‘ACCOUNTING DEPARTMENT D <> GORE TECH CONSTRUCTION CORPORATION Fas INGE Rana ead ae aon DAILY TIME RECORD [DATE: 66-Jan-2021 [PROJECT TITLE! Layon Sanitary Landi = [PROJECT NUMBER: GSWA 003-18 = z AM Tee wma onf 9 roa. 30ST CODE NAME 5 HRS ww four] SSE [py [our Welder |S-d]__[Laparan, Vincent G. WS [e=d1_| Monta, Christopher G. C ISo0 O&]_| Moratillo, Sonny D. em) — © 4) _| Santiago, Christopher M. Plumber Gk] | Bactad, Crisaldo R- Li pao & Please make sure that all entries in his OTR are 12 This should alvays be submitted to Payroll i-n-Charge atthe end ofthe day. ‘complete and final before submiting o Payroltin-Charge, | certly and approve that the above time record 4 Employees ‘are true and correct. RECEIVED BY: ‘ACCOUNTING DEPARTMENT [Sites SS ee > >> CORE TECH CONSTRUCTION CORPORATION = Dive, Suite 40, Tararing. ums Soe Prone:(8T) 4755000. Fa 71) 475800) Ek Sonn ca DAILY TIME RECORD DATE: €-Jan-2021 |PROJECT TITLE: Layon, Sanitary Landfill [PROJECT NUMBER: GSWA 003-18. =] role = FT ae eee ru flan wa lea Tena | 1 [Spotter/General Helper ENz 57 2 | C&-q | Baza, Vincent C = eis ee e 3 | o¢=4 | Cruz, Blane Frankie M. [rep (5 Baia + | eyo [Wasisang Tory 144 LE \ Goo l4 [eke |F 5 t 5 7 a 5 i z 5 a fg a 7 7a 9 a oe amt mae lcacmaragtag sme once | cert and approve thatthe above time record o{ Employees 1€€) RECEIVED BY: Ferre » & CORE TECH INTERNATIONAL See 038 Se Yeon Cops Ove Sunt NF Bene rn rset ter Sa 2 DAILY TIME RECORD DATE: 6-Jan-2024 G-Jan-2021 PROJECT TITLE: Layon Sanitary Landfil PROJECT NUMBER: GSWA 003-18 iT eewnn PPT] «SIGNATURE eS ita meee ont HRS | cont ate ns wy | our|sionature| ww | our pratt 1_|HE Operator 2_| Park, Jin k. [e=j wel 3__| Quindo vr, June G. edt les sae 4__| Romero, Jiony A. Spaa eae 5__| Daniel Taijeron 6 Z 3 I 7 1 2 8 14 5 76 7 78 9 20 NOTE: please make sure thal all enes inthis DTR are complete and fal before submiting o Payot !2 This should always be submited fo Payrol-inCharge al the endo! the day. Charge | certy and approve thatthe above tine cord of fffayees (EE) are ive and coe. RECEIVED BY: lAccOUNTING DEPARTHENT | 2 CORE TECH INTERNATIONAL ID 52018, So iva cons Sut, Toman, Gm Prone (72) 755000 Fox i) ses DAILY TIME RECORD DATE: 6-Jan-2021 PROJECT TITLE: Layon Sanitary Landfill [PROJECT NUMBER: GSWA 003-18. NATURE aT eenmAL PM | SIC No NAME cost cove oR ore as ae ce 1_ [Dump Truck Driver 2_ | Afaisen, Jimmy J. 3__| Camacho, Timothy Charles G. 4 | Caoile, ard Jayson O. Castro, Art Junior 5 er @ | Castro, Julia. of) be Apress] 7_| Castro, Vincent 0M lo @ [(ehang, Gini P. A B (6: | 2 [charguaiat, Peter Jonna. O yA [E70 \s00 | t59O i0_| Duenas, Leinani R. a et = I> 11_| Flores, Ronnie L. a an 12_| Flores, Shirley M. cA L301 Be Js: is 13 | Garcia, Jonathan J. Oba) [500 I> 1_| Hernandez, John T. 2 15 | Heroncio, Jefrey Ox), (Seon) 16_| King, Juan Jr. T. 47_| Leon Guerrero, Larry M. 18_| Magofna, Jose F. 39_| Manalo Jr., John M. 20_| Manibusan, Eric | Ox 30, & SLEW. IF Neesnemerer SSRN CO acy chara aca es et tee eT cm RECEIVED [ACCOUNTING DEPARTNENT ) eee Lact INTERNATIONAL Phone (672) 473000 FF erst Oana Guan a DAILY TIME RECORD DATE: 6-Jan-2024 IPROJECT-TITLE: Lavon Sanitary Landi [PROJECT NUMBER: GSWA 003-18, % | AW [eEWTAL [PMT] STGNATURE No NAME cost cove oR Ti | tenn rs wv |our|stenature|_w | our Picotto + [Dump Truck Driver + 2_| Manibusan, Joel J 6d} [poo 3 Mendiola, Joseph Junior. —J] [dl 1. pHi) Palmer, Wayne A. CE=S) sa 2% Palomo, Donavan P. : E 6 | Perez, Nathan M, | 7_| Reyes, Gris Jude P. 4 ®_| Yanger, Christian C. 7 : ‘| * 10] i 2 3 = 5 16 7 78 9 2 NOTE yr frease make suc tat ales in his OTR are complete and final beter submiting to Payot-irCharge. |p: this should always be submied to Paya-in-Charge at he end of he day, RECEIVED BY: |ACCOUNTING DEPARTMENT fg CORE TECH INTERNATIONAL FF ect ane th Sao | DAILY TIME RECORD | (parE 6an-2021 cm Z al JPROJECTTTITLE: Lavon Santoy Landi [PROJECT NUMBER: GSWA 003-18, 7 SIGNATURE AM] EE INTIAL |__PM. No NAME ‘cost cove or | HRS: iw [our|SiGnaTuRE| iv | our 1_ [Carpenter 2_| Cariazo Jr., Rodolfo. | OF—)_ EA 3_| Cruz, Rico James S, 4 | Dela Cruz, Randy A. OX), 5_| De Venencia AnthonyT. k=) [oF @ | Nicolas, Noly P. 7 3 2 Ov g Peralta, Jeffrey T. ORF iS eel | 10_|Welder 10 11_| George, Hany D. ys lez0 (Zao | 233 oS |\FHE ale 72_| Pring, Egil D. J) |e %6| 134 [Zea 5044 = |e 2 13] i x4 is [Plumber 15 16 _[Reyes, Johnny Vincent S.| | —d) CH\B se 7 . 17| @ 18 © 19| 2 =a nove 1, Please make sur tat al entries in his OTR are complete and fal before submitng o Payal-i-Charge lz Ths should always be submited to Payoi-in-Charg at he end of he day lceity and approve that he above time RECEIVED By: |ACCOUNTING DEPARTMENT (@ CORE TECH INTERNATIONAL OD eee DAILY TIME RECORD (pare: _6-Jan-2024 PROJECT TITLE: Lavon Sanitary Landfil [PROJECT NUMBER: GSWA 003-18 aM] EE INTIAL PPM Tra Sass No NAME cost CODE oR 276" | sent nt tl oe ww |our|sienarure] w_ | our i_|Spotter/General Helper a 2 | Ada Jr., Peter B. 3_ | Cruz, Bleyton D. 4_ | Flores, Jevin R. 's_| Gordon, Chargualaf J. @ 7 3 ° ‘Muna, Benjamin D. Muna, Kenneth J. Oe-4) Perez, Kenneth M. Sana, Joseph C. 10_ | San Nicolas, Brian J 11 [ Taimanglo, Jockin SN. | C= (500 12 | Taimanglo, Joshuas. | ae —v) [foo 13, | Taimanglo, Justin M. Cr-41 14_| Taitague, Mark F.Q. od 3 5 D a 7 7| 8 73 9 a | |p 29 NOTE Please make sure that all envies in this DTR are completo and final before submiting to Payolin-Charge 2 This should always be submited to Payol-in-Charge al he end of he dy. | erty and approve thatthe above time \ecord of Employees (EE) are rue and conec. RECEIVED By: |ACCOUNTING DEPARTMENT PHC CORPORATION eral Contactor DAILY TIME RECORD 3 6-Jan-2021 NAME: Layon Sanitary Landfill 5 a a ame 7 eM | EE SIGNATURE i | AM | ee INITIAL OR froTAL| tery tat he total | MRS | hours opposit COST CODE ww four! SNATURE | iw [our py Horres, Kraven R. Ie a y 9 [TovAL REGULAR HOURS: TOTAL OVERTIME HOURS: INOTE:1. Please make sure that all entries in this DTR are complete and final before submitting to Payrol-in-Chargo, 2. This should always be submitted to Payroltin-Charge atthe end ofthe day. | corfy and approve that the above ti os sNATURE: record of Employees (EE) are true and RECEIVED By: eerie Sea ACCOUNTING DEPARTMENT le

You might also like