You are on page 1of 1

+2.40 CEILING LINE +2.

40 CEILING LINE +240 CEILING LINE

SHOWER

450

300 x 600mm WALL TILES 300 x 600mm WALL TILES


(AS PER APPROVED) (AS PER APPROVED)

800
VANITY 125

2400

2400
2400

2400
MIRROR TOWEL ROD
1600 TISSUE

2000
PAPER

150
HOLDER

LAVATORY

1000
(OVERHANG)

825
EQUAL
1150

C
ID -4
A B
ID -4 ID -4
2300

2300

D
CL
ID -4
A. T&B ELEVATION A SCALE: 1:40 M B. T&B ELEVATION B SCALE: 1:40 M
EQUAL
1150

- 1"

SHOWER 300 x 600mm WALL TILES


(AS PER APPROVED)

300 x 600mm WALL TILES TOWEL ROD


(AS PER APPROVED)
1600 SOAP NICHE

800

2400
2000

150
1500

1500
825

825
NOTE:
1. PLEASE FOLLOW TISSUE PAPER HOLDER LOCATIONS FOR EACH ROOM BLOW UPS,

A. TYPICAL TOILET & BATH REFERENCE PLAN C. T&B ELEVATION C SCALE: 1:40 M D. T&B ELEVATION D SCALE: 1:40 M
PROJECT: SHEET CONTENTS: PREPARED BY: CHECKED BY: APPROVED BY: SHEET REVISION NO:
DIVIMALL ID - 4
TYPICAL TOILET & BATH BLOW UP AND
C49-SAN ILDEFONSO
HOTEL SAN ILDEFONSO BULACAN
ELEVATION DETAILS MMG CBO ST
SCHEME
3
DATE: 04.17.21 DATE: DATE:

You might also like