This certificate of completion certifies that construction of a building covered by permit number 20-0518-B, issued on December 7, 2020 to owner Francis Angelo F. Cruz, has been completed in accordance with approved plans and the National Building Code. The two-story commercial building located beside the public market in Sta. Maria, Bulacan at a cost of 3.3 million pesos is ready for final inspection and issuance of a certificate of occupancy. The building was constructed between January 1990 and September 1990 using materials like 1,120 cement bags, 1,400 board feet of lumber, and 1800 kg of reinforcing bars.
This certificate of completion certifies that construction of a building covered by permit number 20-0518-B, issued on December 7, 2020 to owner Francis Angelo F. Cruz, has been completed in accordance with approved plans and the National Building Code. The two-story commercial building located beside the public market in Sta. Maria, Bulacan at a cost of 3.3 million pesos is ready for final inspection and issuance of a certificate of occupancy. The building was constructed between January 1990 and September 1990 using materials like 1,120 cement bags, 1,400 board feet of lumber, and 1800 kg of reinforcing bars.
This certificate of completion certifies that construction of a building covered by permit number 20-0518-B, issued on December 7, 2020 to owner Francis Angelo F. Cruz, has been completed in accordance with approved plans and the National Building Code. The two-story commercial building located beside the public market in Sta. Maria, Bulacan at a cost of 3.3 million pesos is ready for final inspection and issuance of a certificate of occupancy. The building was constructed between January 1990 and September 1990 using materials like 1,120 cement bags, 1,400 board feet of lumber, and 1800 kg of reinforcing bars.
THIS IS TO CERTIFY THAT THE CONSTRUCTION OF THE BUILDING COVERED BY THE
BUILDING PERMIT NO. 20-0518-B ISSUED ON DECEMBER 07, 2020 HAS BEEN COMPLETED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS ON FILE WITH THE OFFICE OF THE BUILDING OFFICIAL AND THE “NATIONAL BUILDING CODE” (PD 1096).
THAT THE SAID BUILDING AND/OR STRUCTURE IS READY FOR FINAL INSPECTION FOR THE ISSUANCE OF THE “CERTIFICATE OF OCCUPANCY”.
NAME OF OWNER: CRUZ FRANCIS ANGELO F.
(Last Name) (First Name) (Middle Name) ADDRESS OF OWNER :# 561J.P. RIZAL ST., SAN GABRIEL, STA. MARIA, BULACAN LOCATION OF CONSTRUCTION:BESIDE PUBLIC MARKET,POBLACIO, STA. MARIA, BULACAN USE OR TYPE OF OCCUPANCY : COMMERCIAL DATE OF CONSTRUCTION PROPOSED: JANUARY 1990 ACTUAL: 01/08/1990 DATE OF COMPLETION EXPECTED:SEPTEMBER 1990 ACTUAL: 09/22/1990 NO. OF STORIES: TWO ACTUAL HEIGHT: 7.20M ESTIMATED COST P: 3,222,426.00 ACTUAL COST P: 3,344,426.00 (For Statistical Purposes Only)
A.) MATERIALS (TOTAL COST) P: 2,006,665.00
1. CEMENT (bags): 1120 BAGS
2. LUMBER (board foot):1400 bd. ft. 3. REINFORCING BARS (kg.): 1800 kg 4. NO. OF G.I. SHEETS: 60 5. PRE-FAB STRUCTURAL STEEL (kg.):N/A
B.) DIRECT LABOR (TOTAL COST) P: 1,230,549.00
This includes compensation whether by salary or contract for project architect/engineer down to laborers.
C.) RENTAL OF EQUIPMENT (IF ANY): N/A
D.) OTHER COSTS P: 100,000.00
This includes professional fees, permits and other fees.
IF CONSTRUCTION IS UNDERTAKEN BY CONTRACT
ARCHITECT/CIVIL ENGINEER CONTRACTOR
PRC: PRC REG. NO. _________CLASS___ PTR: TIN ______________CTC __________ DATE ISSUED: ADDRESS _______________________