Professional Documents
Culture Documents
Maintenance Protocol System: Annual Preventive Maintenance Checklist
Maintenance Protocol System: Annual Preventive Maintenance Checklist
Maintenance Protocol
System
Annual Preventive Maintenance Checklist
Customer:
Address:
Fax / E-Mail:
Fax / E-Mail:
Department: Room:
Material-No.: Serial-No.:
Contract-No.: Expire date:
Order-No.: System - ID:
*) For imaging systems: The result of the image quality check shows no deviation from
the reference values.
Signature:
Date: Name:
Signature:
Date: Name:
Remarks:
Value:
2 Performing Daily Maintenance
2.3 Calibrating the Barometric Sensor
PM Calibrated the barometric sensor.
7 Yearly Maintenance
7.1 Replacing the Measurement Module Tubing
PM Replaced the measurement module tubing.
PM Replaced the pressure sensor bubbler grommet and the
pressure sensor bubbler.
PM Replaced the waste tubing.
7.7 Calibrations
7.7.1 Calibrating PO2Electronic Zero
PM Calibrated PO2 Electronic Zero.
7.7.2 Calibrating the Touchscreen
PM Calibrated the touchscreen.
7.7.3 Calibrating the Waste Detector
PM Calibrated the waste detector.
7.7.4 Calibrating the CO-ox Lamp
PM Checked the CO-ox lamp calibration.
PM Performed the CO-ox Wavelength Test.
7.7.5 Perform Manual Calibrations
PM Verified system performance.
siemens-healthineers.com