REV-B1/322/2020-REV
GOVERNMENT OF KERALA
Abstract
Revenue Department – Creation of a Special Deputy Collector office based at Ernakulam
and 11 Special Tahsildar LA Offices based at Thiruvananthapuram, Kollam, Alappuzha,
Pathanamthitta, Kottayam, Ernakulam, Thrissur, Kozhikode, Malappuram, Kannur &
Kasargod and acquisition of 955.13 Hectares of land of various villages of
Thiruvananthapuram, Kollam, Alappuzha, Pathanamthitta, Kottayam, Ernakulam, Thrissur,
Malappuram, Kozhikode, Kannur & Kasargod districts for Semi High Speed Railway Line
(Silver Line) Project - Sanction Accorded - Orders issued
REVENUE (B) DEPARTMENT
G.O.(Ms)No.163/2021/RD Dated,Thiruvananthapuram, 18/08/2021
ORDER
As per the G.O read as 2nd paper above, approval has been given for the Feasibility
Report and Alignment thereof of 3rd and 4th Railway Line between Thiruvananthapuram
and Kasargod Semi High Speed Rail Project submitted by M/s SYSTRA, subject to the
condition that value capturing, financial mobilization,etc mentioned in the feasibility report
will be made only after getting formal approval for the project from Railway Board.
File No.REV-B1/322/2020-REV
2. As per the letter read as 3rd paper above, "in principle approval (IPA)" for
taking up pre-investment activities for the construction of 3rd and 4th Railway Line
between Thiruvananthapuram and Kasargod (540 KM) - Semi High Speed Rail Corridor
Project has been conveyed by the Ministry of Railways.
3. The Manging Director, KRDCL as per the letter read as 4th paper above has
requested for the creation of Special Land Acquisition units exclusively for the acquisition
of Semi High Speed Railway Line (Silver Line) Project.
4. As per GO read as 5th paper above the Detailed Project Report (DPR) and
alignment thereof of "Silver Line" (Semi High Speed Rail Corridor) between
Thiruvananthapuram and Kasargod prepared by M/s SYSTRA has been approved and the
Managing Director, KRDCL was directed to approach financial institutions, nationalized
banks etc for the funding of the cost of Land Acquisition, Rehabilitation & Resettlement.
Permission was also granted to approach JICA, KfW, ADB & AIIB for meeting the debt
portion.
5. The Managing Director, KRDCL as per the letters read as 6th paper above has
requested to accord sanction for the acquisition of 955.13 Hectares of land of various
villages of Thiruvananthapuram, Kollam, Alappuzha, Pathanamthitta, Kottayam,
Ernakulam, Thrissur, Malappuram, Kozhikode, Kannur & Kasargod for Semi High Speed
Railway Line (Silver Line) Project as detailed below:
Thiruvananthapuram-78.42 Hectare
Thiruvananthapuram-78.42 Hectare
(Hectare)
File No.REV-B1/322/2020-REV
Block No 14
11,12,13,14,15,16,66,68,69,70,82,83,84,85,8
7,124,125,126,127,262,263,269,270,271,272,
288,306,308,312,315,316,322,326,327,328,3
29,348
227,228,229,237,238,239,240,241,242,245,2
46,254,341,345,346,347,351,352,363,382, 22
5
File No.REV-B1/322/2020-REV
Block No.24
259,264,265,323,324,328,332,334,335,347,3
50,351,352
372,384,385,386,388,389,392,393,397,403,4
04,406
Block.No18
12,13,14,15,16,17,18,19,32,67,68,69,70,111,
112,113,114,115,118,119,121,122,123,124,1
25,131,147,148,149,153,154,157,158,168,41
9,420,423,424,429,430,431,432,433,434,440,
504,506,507,508,511,512
Total 78.42
(Hectare)
Adichanalloor Kollam Block No.28 83.06
103,104,105,108,109,110,129,130,131,133,
134,165,166,168,169,170,171,172,180,181,
182,183,185,186,187,191,226,451,452,453,
454,471,472,475,476,478,480,481,496,498,
499,503,505,506,507
41
File No.REV-B1/322/2020-REV
5,8,9,10,25,27,40,41,42,43,72,170,171,173,
174,191,192,193,194,195,196,197,202,203,
204,293,480,481,482,493,494,496,501,503,
505,512,513,514,518,519,521,522,523,524
16,17,26,29,30,31,63,64,65,66,67,68
Block No.39
96,98,99,101,102,103,106,107,109,111,121,
122,123,124,125,134,135,136,141,142,414,
415,416,417,418,419
Block No.40
151,152,153,154,155,161,180,183,184,191,
193,195
294,298,299,300,302,303,304,305,306,307,
308,309,321,322,333,334,338,341,342,343,
354,366,367,370,371,373,374,375,382,383,
384
File No.REV-B1/322/2020-REV
482,483,485,486,491,492,494,495
Block No.31
27,33,34,35,36,37,40,47,49,53,54,55,173,17
6,177,178,243,244,249
Block No.32
110,169,170,210,215,216,217,218,219,234,
236,238,239,240
106,107,109,112,114,115,123,124,164,165,
166,172,174,178,219,222,223,224
Block No.10
483,484,485,486,487,492,493,498,500,550,
557,558,560,561,562,565,597,598,599,600
92,93,111,112,123,127,128,129,131,135, 12
2
File No.REV-B1/322/2020-REV
169,170,182,183,184,186,358,375,376,377,
378,382,383,384,385,390,400,401,402,403,
404,405,406,407,408,420,422,430,431,432,
433,434
Block No.28
22,23,27,28,29
Block No.23
58,59,60,61,62,63,74,75,154,157,158,160,1
64,165
109,115,116,129,130,141,142,143,144,149,
150,258,260,262,269,270,271,333,334,335,
341,342,343,344,351,352,353,359,360,361,
362,392
31,32,33,36,38,44,45,46,47,48,60,61,97,99,
224,225,24,7248,252,253,254,255,256,329,
330,331,338,345,346,359,360,361,362,363,
364,483,484,485,487,571,572,575,576,583,
586,590,592,593,594,646,655,656,657,664,
665,666,667, 247, 248
File No.REV-B1/322/2020-REV
398,399,400,401,405,406,408,413,451,452,
453,458,459,460,461,462,532,535,536,537,
538,539,542,543,545,546,559,560,562,573,
574,575,577
Block No.6
539,540,542,543,545,547
372,373,374,377,378,379,380,381,382
Total 83.06
(Hectare)
Mulakkuzha Chengannu Block No.16 26.09
r
427,436,437,438,439,440,461,462,464,465,47
0,471,472,473,482,483,484,485,487,488
Block No.17
533,534,552,553,580,581,582,585,587,588,58
9,592,593,656,657,658,659,660,661,672,673
Block No.23
247,248,249,250,267,268,269,270,273,274,27
5,276,277,278,286,287,686,708,709,710,711,
712,713,714,715,718,728,729,730,735,737,79
6,797,805,806,807,808,809,810,811
Block No.21
341,344,346,347,348,349,376,378,379,380,38
1,382,392,393,397, 340
Total 26.09
(Hectare)
Aranmula Kozhench Block No.11 44.47
ery
484,485,486,488,488,488,491,492,493,494,495,
500
6,8,10,16,30,31,32,54,55,147,151,152,153,157,1
58,233,237,238,240,253,254,255,256
Block No.13
444,445,450,463,464,465,511,512,513,514, 65
6
61,62,69,70,71,72,77,78,79,82,83,84,86,87,108,
109,110,222,223,224,228,229,230,231,234, 235
File No.REV-B1/322/2020-REV
122,125,127,136,227,228,230,231,232,241,242,
243,249,251,252,261,262,263,304,305,310,312,
313,316,317,322,323,324,327,329,330,333,334,
335,337,338,503, 123, 124
454,464,465,466,469,470,471,474,495,496,497,
498
554,555,557,558,559,561,562,563,839,840,845,
846,848,849,857,863,873,874,877,878,885,886,
901,902,903,914,915,1021
Block No.35
70,74,75,76,77,78,146,147,149,151,154,155, 15
6,159,285,301,304,306,305,310,335,338,342,34
3,344,351,352, 308, 309, 311
6,7,8,10,11,27,28,37,43,44,55,59,60,61,696
TOTAL 44.47
(Hectare)
File No.REV-B1/322/2020-REV
TOTAL 15.61
(Hectare)
Madappalli Changanasse Block No.9 108.11
ri
316,317,318,319,320,321,331,336,337,344,34
5,353,379,380,381,384
Block No.10
241,260,261,262,264
Block No.11
2,3,8,9,10,11,23,27,28,30,69,70,71,72,73,74,8
1,217,218,219,220,222,223,231,245,246,250,2
51,252,253,258,307,308,310,311,312
252,256,259,260,263,267,268,269,270,277,27
8,283,342,346,347,348,356,357,362,363,364,3
93,394,396,400,407,408,424,425
Block No.31
67,70,71,75,76,77
17,18,19,20,21,22,23,24,25,32,36,37,38
233,234,239,247
213,214,215,230,231,232,275,276,282,283,28
7,288,294,295,296,304,306,307,308,309,310,3
12,350,351,352
Block No.21
5,6,8,10,11,12,26,27,28,40,98,100,104,105,11
7,118,214,235,236,239,240,245,246,254,257,2
58,259,357,358,372,375,376,377,404,412,413,
422,425,429,624,626,628,629
File No.REV-B1/322/2020-REV
247,429,430,433,434,435,436,437,438,440,44
1,442, 443,469,470,471,473,474,475,478,479,
483,485,486, 487,496, 497
Block No.31
107,108,112,113,118,119,120,121,123,124, 17
6,177, 179,180,197,198,212,225,228,229,230,
231,252,253, 264,265,279,280,298,299,301,30
2,307
160,226,229,230,239,241,258,259,261,263,26
4,265, 271,272,283,284,285,294,295,296,297,
315
290,291,292,293
1,83,84,88,89,90,91,92,93,94,95,111,112, 11
8,119,120, 123,141,142,143,144,145
30,31,76,77,78,79,81,87,88,89,90,91,92,98,
99,100,101
Block No.11
154,156,157,158,160,161,183,184,185,188,19
0,191, 192,193,195,196,200,201,205
File No.REV-B1/322/2020-REV
59,60
Block No.8
65,67,74,76,77,78,82,85,86,87
Block No.9
25,27,28,29,30,31,32,34,41,42,43,65,67,68,71,
72,73,78,79,84,85,112,113,116,117,212,213,2
14,217,218,230,234,236,268,281,283,284,285,
287,288,289,290,291, 292, 294,305
153,154,156,157,158
83,84,93,95,97,146,147,148,157,206,207,227,
228,278, 279,280,281,313,315,316,353,354,40
2,405,407,408,409,429,430,466
45,44,46,48,49,63,64,196,197,198,199,203,20
4,205,210,211,325,326,327,328,330,331,337,3
38,433,434,435, 436,446,447,448,455,457,460
,461,604,605,614,615, 627,653,654,655,666,6
67,668,669,670,671,754,755, 756,758,764,765
,766,774,775
731
Total 108.11
(Hectare)
Kakkanad Kanayanno Block No.9 64.28
or
570,651,652,653,710,722
Block No.36
560
3,4,5,88,89,90,92,107,108,109,182,183,184,18
5,186,187,188,189,366,367,368,369,370,371,3
72,373,374,375, 376,380
File No.REV-B1/322/2020-REV
Block No.41
1,2,3,4,254,255,256,259,268,270,271
Total 64.28
(Hectare)
Aluva East Aluva Block No.32 56.44
23,26,31,32,42,43,44,72,149,150,151,152,
153,155,156,157,167,168,172,173,177,32
4
Block No.33
1,96,97,105,108,110,111,112
65,66,67,68,70,71,72,99,100,101,102,105,
231,232,233,234,236,246,247,248,253,25
5,257,259,263,264,266,269,272,273,285,2
56,257,288,289, 286, 287
357,369,370,371,372,377,383,391,392, 47
9, 3
169,170,171,186,187,188,200,201,202, 20
3,210,211,213,214,215,218,219,220, 263,
271,273,275,276,277,279,283,284, 306,30
7,310,311,312,381,399,400,401, 403, 415
,416
File No.REV-B1/322/2020-REV
100,101,102,103,104,117,121,122,163,16
4,165,168,169
Block.No.9
27,28,32,47,48,50,52,135,136,137,138,13
9,140,143,145,147,149,473,474,477,478,4
79,480,481,482,483,484,536,537,538,540,
541,542,552,553,554,555,556,567,568,57
1,572
27,28,30,269,273,274,276,306,307,308,30
9
Block No.5
164,165,166,169,172,173,174,176,181,18
8,189,190,196,221,222,223,228,229,233,2
34,235,237,238,257,362
Total 56.44
47, 48, 55, 57, 58, 61, 62, 77, 78, 79,
80, 84, 85, 151, 166, 167, 169,
170,171, 173, 182, 183, 184, 318,
321, 323, 324, 327, 328, 330, 331,
339, 344, 346, 347, 350, 351, 353,
355, 356, 357, 358, 375, 376, 377,
378, 379, 645
33, 34, 35, 36, 37, 38, 43, 44, 46, 47,
48, 49, 50, 51, 52, 53, 54, 65, 80, 81,
82, 83, 453, 454, 455, 456, 491, 493,
494, 496, 499, 500, 501, 504, 515,
516, 539, 543, 544, 549, 550, 551,
553
19, 22, 40, 41, 42, 45, 46, 47, 48, 68,
86, 87, 89, 185, 186, 187, 188, 189,
190, 194, 197, 198, 200, 201, 202
85, 92
33, 34, 35, 37, 38, 39, 40, 41, 62, 63,
64, 65, 66, 68, 69, 158, 159, 160,
163, 164, 165, 166, 196, 197, 199,
201, 202
433
Total 111.47
177,178,182,183,185,186,193,208,209,215,2 104.94
16,218,278,281,284,285,293,294,295,296,29
7,298,381,383,386
109,118,120,121,122,136,137,138,139,150,1
51,152,155
36,37,38,44,45,46,47,58,59,60,61,62,63,64,6
5,66,70,75,76,77,78,79,80,156,157,158,159,
160,173,174,192,193,204,205,206,295,297,3
02,303,304,305,306
File No.REV-B1/322/2020-REV
Block No.25
2,3,4,8,9,10,46,47,49,50,51,54,5,221,222,22
3,228,229,230,231,232,233,237,238,242,243
,244,245,253,254,255,258,259,267,268,269,
273,277,278,279,280,281,282,429,430,431,4
32,433,436,437,441,442,450,451,452,459,46
0,472
119,120,121
42,43,44,45,51,52,54,55,56,57,58,89,90,92,9
3,94,95,96,103,104,106,107,112,113,295
Block No.8
190,191,192,193,194,195,196,197,198,199,2
00,201,207,208,209,210,211,212,213,214,21
6,217,248,249,250,262,268,270,271,272,273
File No.REV-B1/322/2020-REV
217,218,219,241,242,243,244,256,257,258,2
77,278,279,280,286,287,295,316,352,354,35
6,357,358,359,360,361,367,368
65,66,67,72,73,74
40,201,204,205,231,232,233,234,23,239,240
,243,244,245,257,258,259,260,261,280,281,
282,283,284,302,303,319,320,321,322,325,3
26
117,118,119,123,124,125,129,130,131,154,1
56,157,158,159,167,291,292,293,295,297,29
8,375,376,377,386,389,390,414,415,416,419
,457
84,85,94,95,96,98,99,182,183,184,190,191,1
92,204,212,213,214
61,76,77,93,94,97,98,99,100,102,103,254,25
5,257,258,267,269,273,275,276,279,280,281
Block.No.81
1,2,3,5,6,7,9,31,32,33,56,57,58,127,128,129,
130,132,133,135,136,281,282,283,305,306,3
09,312,317,318,321,398,399,401,403,404,40
7,408,409,473
385,386,387,394,395,398,400
Block No.72
62,63,64,67,77,78,79,85,88,89,90
Block No.73
5,6,7,8,10,11,12,13,14,15,126,131,132,134,1
51,152,153,154,155,157,158,159,160, 162,
163,164,165,166
Total 109.94
35,36,37,40,42,44,53,54,57,58,59,62, 63
,64,65,87,88,89,90,92
1,3,4,16,17,18,19,20,21,25,26,27,28, 29,
30,31,55,56,59,60,61,63,64,65,81, 82,8
6,87,95,96,98,134,135,146,147
Block No.27
5,6,7,13,14,15,26,27,31,32,42,43,47
50,51,52,64,65,67,68,69,92,93,95,100,1
06,110,111,112,113,114,123,124
34,35,39,40,41,84,85,86,87,90,91,92, 10
0,101,102,114,115
Block No.283
23,24,26,27,30,31,32,33,78,79,80,111,1
12,113,115,116,194,195,207,208,209,21
0,211,212,213
File No.REV-B1/322/2020-REV
Block.No.278
12,13,14,15,18,20,21,26,27,28,34,35, 36
,37,38,39,40,41,63,64,65,66
Block No.279
10,11,29,30,31,32,34
Total 42.03
(Hectare)
Cherukunnu Kannur 1,7,8,40,41,42,46,85,86,89,90,94,95,10 53.95
0,101,253,254,258,259,260,261,262,26
3,270,271,304,305,313,314,315,316,32
5,359,365,366,367,377,379, 380,393,
394,395,396,526,540,541,543,549,550,
552,553
File No.REV-B1/322/2020-REV
1,84,86,87,88,93,100,101,102,103, 14
8,149,152,153,156,157,158,165, 166,
355,356,357,358,372,373,375, 377,37
8,380,381,383,391,392,393, 494,505,
503,506,507,508,509,563, 564,565,56
6,567,573,585,588,591, 601
Total 53.95
(Hectare)
Anjur Hosdurg Block No.89
104,105,106,112,113,136,137,140,141,
142,257,258,260,261,262,265,266, 26
8,269,272, 82
64,69,73,75
1,200,215,230,231,273,274,275,276, 27
7,278,279,280,281,282,307,308, 309,
310,312,316,317,446,447,449, 616,61
4,616, 613
8,9,11,23,24,26,28,29,32,33,39,40,41,4
2,43,86,87,88,89,90,141,143
71,72,80,81,82,85,113,115,119,127, 1
28,129,206,207,221,222,226,227, 229
45,46,47,56,57,58,59,60,62,63,64,65,16
8,213,214, 215,216,217,219,235, 237,
239,247,256,257,258,259,
370,379,380,381,382,383,384,401, 40
3,405,406,407, 408,409,494,496, 497,
498,500,510,512,513,516,517,
522
File No.REV-B1/322/2020-REV
103,104,106,107,108,130,132,136, 13
7,138,139,140
31,32,34,35,37,46,47,58.,59,60
1,2,3,5,6,7,358,408,654,712,713,714
3,4,5,11,12,19,20,21,37,103,104,108,10
9,110,111, 112,182,190,191,192, 212,
213,219,220,221,222,224,225,228, 188
76,78,79,80,267,268,269,344,345,346,3
47,356,357,715,721,722,727,728, 777,
654
33,34,35,36,38,75,76,77,78,79,176, 1
77,179,182,183,187,193,194,200, 201
123.129,130,132,134,135,141,145
26,27,29,30,31,32,93,94,95,97,98,106,1
07,118,139,140
3,4,23,24,27,28,29,104,110,111,112, 1
13,114,117,120,139,141,149,153,154,1
55,156,161,263
67,68
File No.REV-B1/322/2020-REV
3,12,13,14,16,18,19,20,21,22,23,24, 25
,26,28,29,30,31,32,33,36,44,45,46,70,7
1,72,73,75,76,85,86,87,88,90,91,94,95,
96,97
Block No.62
49,51,52,53,54,57,86,89,90,94,95,96,12
6
Block.No.63
11,12,13,14,15,54,55,56,62,63,64,65
Total 161.26
6. The Commissioner, Land Revenue in the letter read as 7th paper above has
informed that 11 Special Tahsildar LA Offices based at Thiruvananthapuram, Kollam,
Alappuzha, Pathanamthitta, Kottayam, Ernakulam, Thrissur, Malappuram, Kozhikode,
Kannur & Kasargod consisting of the following 18 staff needs to be created exclusively for
the acquisition of land for Semi High Speed Railway Line (Silver Line) Project from
Thiruvananthapuram to Kasargod. Further a Special Deputy Collector office consisting of
the following 8 staff may also be created for effective coordination. It has been informed
that an amount of Rs 13,49,47,730/- (Rs Thirteen Crores Forty Nine Lakhs Fourty Seven
Thousand Seven Hundred & Thirty Only) is required as establishment charges (ie the salary
& other expenses of the staff working in the LA units) for an year (12 months + 1 month
surrender + other allowances) for running the Special Deputy Collector Office & 11 Special
Tahsildar LA Offices.
6 Surveyor 4
7 Clerk 2
8 Village Field Assistant 3
9 OA 1
18
7. As per the G.O read as 8th paper above, sanction was accorded by Transport
Department for the following preparatory works for land acquisition for the proposed Semi
High Speed Railway Line (Silver Line) Project by availing a loan of Rs 2100 Crores from
KIIFB.
“ 1. (a) Social Impact Assessment study as contemplated in the LARR Act, 2013 will be
conducted by issuance of 4(1) notification and an expert committee would be constituted to
evaluate the Social Impact Assessment (SIA) study report.
(b) Govt. order to proceed with the Land Acquisition as per sub-section (2) of
section (8) of LARR Act, 2013 will be issued only after getting final approval for the
project from the Railway board.
(2) Contingency charges as provided in Rule 4(3) of LARR Rules, 2015, r/w G.O(P)
17/2018/RD dated 12.04.2018 would be deposited by the Requisitioning Authority
(KRDCL) in the relevant head of account of LAO.
File No.REV-B1/322/2020-REV
(3) Minimum Special LA units will be created by Govt. exclusively for the Land
Acquisition of Semi High Speed Railway Line (Silver Line). The establishment charges
(Salary and other expenses) for running the Special Units shall be met by KRDCL from the
funds provided by the State Govt. for the purpose, only after getting the project approved
by Govt. of India and Railway Board.
8. Govt. have examined the matter in detail and are pleased to accord sanction for
the following:
1. Sanction is accorded for the creation of a Special Deputy Collector office consisting
of 7 posts based at Ernakulam and 11 Special Tahsildar LA Offices based at
Thiruvananthapuram, Kollam, Alappuzha, Pathanamthitta, Kottayam, Ernakulam, Thrissur,
Malappuram, Kozhikode, Kannur & Kasargod consisting of 18 posts each as per the
following pattern exclusively for the acquisition of Semi High Speed Railway Line (Silver
Line) Project.
2 Junior Superintendent 1
3 Head Clerk 1
4 Clerk 2
5 OA 1
6 Computer Operator (on contract) 1
7
The above Special Deputy Collector Office & 11 Special Tahsildar Office s are created
subject to the following conditions:
a ) T h e 6 posts attached to Special Deputy Collector Office (other than the 1 post of
Computer Operator on contract) and 18 posts each attached to the 11 Special Tahsildar
Office are created temporarily for a period of one year and to make fresh appointment.
b ) One post of Compuer Operator attached to Special Deputy Collector Office may be
created on contract basis and KRDCL will take steps for the recruitment of the candidates
on contract.
c) The establishment charges to the tune of Rs 13,49,47,730/- for an year has to be borne by
the Requisitioning Authority, KRDCL
(a) Social Impact Assessment study as contemplated in the LARR Act, 2013 will be
conducted by issuance of 4(1) notification from the State Level Social Impact Assessment
(SIA) agencies empaneled for the purpose and an expert committee would be constituted to
evaluate the Social Impact Assessment (SIA) study report.
(b) The decision of the Govt. to proceed with the Land Acquisition as per sub-section
File No.REV-B1/322/2020-REV
(2) of section (8) of LARR Act, 2013 on receipt of the SIA report, Expert Committee
recommendation and the recommendation of the District Collector concerned will be issued
only after getting final approval for the project from the Railway board.
(c) The District Collector shall ensue that the requisitioning authority has
deposited 5% Contingency Charges of the cost of compensation or Rupees fifty lakhs
whichever is less as provided in Rule 4(3) of LARR Rules, 2015 r/w G.O(P) No.17/18/RD
dated 12.04.18, in the TSB account before proceeding with the acquisition. Before issuance
of 19(1) Declaration the District Collector should also ensure that the balance entire cost of
compensation as provided in Rule 4(6) of LARR Rules, 2015 has been deposited by the
requisitioning authority in the TSB account or else the acquisition proceedings may be
stopped atonce.
(By order of the Governor)
Dr A Jayathilak I A S
Additional Chief Secretary
To
The Commissioner of Land Revenue, Thiruvananthapuram
The District Collector, Thiruvananthapuram, Kollam, Alappuzha, Pathanamthitta, Kottayam,
Ernakulam, Thrissur, Malappuram, Kozhikode, Kannur & Kasargod
The Accountant General (A&E/Audit) Kerala, Thiruvananthapuram
The Managing Director, KRDCL
The Transport Department
The Finance Department
The I&PR (W & NM) Department
GA (SC) Department
Stock File/Office copy
Copy to :
PS to Hon'ble Chief minsiter
PS to Minister (Revenue)
PA to Additional Chief Secretary (Revenue & DM)
CA to Special Secretary (Revenue)
CA to Deputy Secretary (Revenue)
Section Officer