Doc #: PIB-004_F-01_MOP

Document type Template


METHOD OF PROCEDURE (MOP) Version: 2

Issue Date 25th Oct 2018

MOP # Prepared By Approved By Date


MOP Information Furqan Akram Abdul Qayyum 25-09-2019

MOP Title Shifting of WAN Links from CTHE-MX960-3 to CTHE-MX960-1


Reason / Purpose Shifting of WAN Links from CTHE-MX960-3 to CTHE-MX960-1
of Deployment

POC Details
Name Designation Department Supervisor
Abdul Qayyum Manager MMBB Core Adnan Ali

Stakeholders Info

☐ Planning ☒ Operations ☐ Projects

☐ Others

Root Cause Analysis


Shifting of WAN Links from CTHE-MX960-3 to CTHE- Define & Shifting of WAN Links from CTHE-MX960-3 to CTHE-MX960-1
Identified Gap MX960-1 Measure Gap
Shifting of WAN Links from CTHE-MX960-3 to CTHE-MX960-1
Determine the
Solution

Solution Implementation
Resolution All stakeholders IBM and PTCL Ops team is on-board. Planned is discussed and all teams are aligned for successful completion of this activity.
Statement / High
level information
Impact (Detailed HIS degradation will be faced.
impact elaboration)

Risks (Issue / Services HIS degradation will be faced.


that may get
impacted)

Page 1 / 2
This document is confidential and is the Property of PTCL
It is strictly forbidden to hand it to external parties under any circumstances without prior written authorization of Management.
Doc #: PIB-004_F-01_MOP
Document type Template
METHOD OF PROCEDURE (MOP) Version: 2

Issue Date 25th Oct 2018

Activity Participants  Abdul Qayyum


 Abrar
 Asad
Activity Duration 4 Hrs Constraint (If any) NIL

Tasks Before Activity/Pre check/Prerequisite

# Action Duration Status


NIL

Procedure/Plan Activity
# Action Impact/Risk Duration Status
NIL
Shifting of WAN Links from CTHE-MX960-3 to CTHE-MX960-1 HIS degradation will be faced. 4h

Verification

Success Criteria Check Health of Box. Monitor traffic on all interfaces.


Roll Back Plan
Database Update
Vendor System <Please make sure that special system rights given to Vendor for deployment has been revoked once activity is completed and verified>
Access rights
Verified By Date
Services Verification
Asad ALi 27-09-2019

Page 2 / 2
This document is confidential and is the Property of PTCL
It is strictly forbidden to hand it to external parties under any circumstances without prior written authorization of Management.