You are on page 1of 14

Name of the enterprise SIS SA

Project Name LIFE17 ENV ES 331 MULTI-AD


Name of staff member Horia CARP
Calendar Month / Year June 2021
Part / Full time* PART TIME (2 hours/day)
*indicate the number of working hours per day

DATE ACTION TIME WORK DESCRIPTION


15.06.2021 B2 2 Work on electrical cabinet design
16.06.2021 B2 2 Work on electrical cabinet design
17.06.2021 B2 2 Work on electrical cabinet design
18.06.2021 B2 2 Work on electrical cabinet design
22.06.2021 B2 2 Work on electrical cabinet design
23.06.2021 B2 2 Work on electrical cabinet design
24.06.2021 B2 2 Work on electrical cabinet design
25.06.2021 B2 2 Work on electrical cabinet design
28.06.2021 B2 2 Work on electrical cabinet design
29.06.2021 B2 2 Work on electrical cabinet design
30.06.2021 B2 2 Work on electrical cabinet design

Date and signature of staff member Date and signature of person in charge of the project
Name: Horia Carp Name: Gheorghe FLOREA
Signature: Signature:

Date: Date:
Name of Beneficiary SIS SA
Name of staff member Horia CARP
Is staff member employed Full-time or Part-time Part-time (2h)
Calendar Year 2021
Calendar Month June

Calendar Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Total


In case of absence, indicate one of the reason codes below
Hours worked on project LIFE17 ENV/ES/000331 PH 0,0 0,0 0,0 WE WE 0,0 0,0 0,0 0,0 0,0 WE WE 0,0 2,0 2,0 2,0 2,0 WE WE PH 2,0 2,0 2,0 2,0 WE WE 2,0 2,0 2,0 22,0
B1 PH WE WE WE WE WE WE PH WE WE
B2 PH WE WE WE WE 2,0 2,0 2,0 2,0 WE WE PH 2,0 2,0 2,0 2,0 WE WE 2,0 2,0 2,0 22,0
B3 PH WE WE WE WE WE WE PH WE WE 0,0
B4 PH WE WE WE WE WE WE PH WE WE
B5 PH WE WE WE WE WE WE PH WE WE
B6 PH WE WE WE WE WE WE PH WE WE
C PH WE WE WE WE WE WE PH WE WE
D PH WE WE WE WE WE WE PH WE WE
E PH WE WE WE WE WE WE PH WE WE
Hours worked on project Multiscale finance through Programul
Operaţional Competitivitate PH WE WE WE WE WE WE PH WE WE 0,0
Hours worked on project Smart Microgrid Controller EEA and
Norway Grants PH WE WE WE WE WE WE PH WE WE 0,0
Hours worked on project Prevention ITEA PH WE WE WE WE WE WE PH WE WE
Other activities PH WE WE WE WE WE WE PH WE WE 0,0
Total hours (including overtime) PH 0,0 0,0 0,0 WE WE 0,0 0,0 0,0 0,0 0,0 WE WE 0,0 2,0 2,0 2,0 2,0 WE WE PH 2,0 2,0 2,0 2,0 WE WE 2,0 2,0 2,0 22,0
*) indicate project reference
**
) Breakdown of hours worked per action is optional

Absences Summary for this month


Weekend WE Hours worked on project LIFE17 ENV/ES/000331 22,0
Sick leave SL 0 0,0
Public holidays PH 0 0,0
Annual holidays AH 0,0 Operaţional Competitivitate
Hours worked on project Multiscale finance through Programul
Other absence OA 0,0Norway Grants
Hours worked on project Smart Microgrid Controller EEA and
Hours worked on project Prevention ITEA 0,0
Other activities 0,0
Total hours (including overtime) 22,0
*) indicate project reference

Date and signature of staff member Date, name and signature of line manager/supervisor

Explanation for late submission Explanation for late validation

"INSTRUCTIONS
         For any days during the month that you did not work enter the appropriate Absence Code, i.e. sickness, holiday, recuperation of overtime, etc.
         Enter the hours you worked for the Life project each day. If you work for more than one Life project be careful to enter the hours against the correct project.
         Enter the hours you worked on other (i.e. non-Life) activities.
         After the last entry of the month, sign it and date it and pass it on to your line manager/supervisor for validation.
         Please ensure the timesheet is signed and dated by both yourself and your line manager/supervisor within the first two weeks after the month the timesheet relates to. IF this time limit is not respected, please add an 
explanatory comment"
TIMESHEET

Name of the enterprise SIS SA


Project Name LIFE17 ENV ES 331 MULTI-AD
Name of staff member Luiza Ocheana
Calendar Month / Year January 2021
Part / Full time* FULL TIME (8 hours/day)
*indicate the number of working hours per day

DATE ACTION TIME WORK DESCRIPTION


04.01.2021 B2 8 Sensor documentation checking
05.01.2021 B2 6 Sensor documentation checking
08.01.2021 B2 6 IO list checking and updating
12.01.2021 B2 6 Wiring diagrams checking and updating
19.01.2021 B2 6 Wiring diagrams checking and updating
25.01.2021 B3 2 Review automation cabinet design
26.01.2021 B3 6 Review automation cabinet design
28.01.2021 B3 6 Define cabinet specifications
29.01.2021 B3 6 Define cabinet specifications

Date and signature of staff member Date and signature of person in charge of the project
Name: Name:
Signature: Signature:

Date: Date:
TIMESHEET

Name of the enterprise SIS SA


Project Name LIFE17 ENV ES 331 MULTI-AD
Name of staff member Luiza Ocheana
Calendar Month / Year February 2021
Part / Full time* FULL TIME (8 hours/day)
*indicate the number of working hours per day

DATE ACTION TIME WORK DESCRIPTION


03.02.2021 B2 2 Sensor documentation checking
05.02.2021 B2 6 Sensor documentation checking
11.02.2021 B2 8 Wiring diagrams checking and updating
12.02.2021 B2 6 Wiring diagrams checking and updating
15.02.2021 B2 2 Wiring diagrams checking and updating
16.02.2021 B3 6 Review automation cabinet design
17.02.2021 B2 8 Wiring diagrams checking and updating
18.02.2021 B3 2 Review automation cabinet design
22.02.2021 B3 4 Review automation cabinet design
25.02.2021 B3 8 Cabinet specifications - updating

Date and signature of staff member Date and signature of person in charge of the project
Name: Name:
Signature: Signature:

Date: Date:
TIMESHEET

Name of the enterprise SIS SA


Project Name LIFE17 ENV ES 331 MULTI-AD
Name of staff member Luiza Ocheana
Calendar Month / Year March 2021
Part / Full time* FULL TIME (8 hours/day)
*indicate the number of working hours per day

DATE ACTION TIME WORK DESCRIPTION


01.03.2021 B2 2 Electrical cabinet - wiring diagrams
02.03.2021 B2 2 Electrical cabinet - wiring diagrams
03.03.2021 B2 2 Electrical cabinet - wiring diagrams
04.03.2021 B2 2 Electrical cabinet - wiring diagrams
05.03.2021 B2 6 Electrical cabinet - wiring diagrams
08.03.2021 B2 2 Electrical cabinet - wiring diagrams
09.03.2021 B2 2 Electrical cabinet - wiring diagrams
10.03.2021 B2 2 Testing procedures (FAT) ellaboration
11.03.2021 B2 2 Testing procedures (FAT) ellaboration
12.03.2021 B2 6 Testing procedures (FAT) ellaboration
15.03.2021 B2 2 Testing procedures (FAT) ellaboration
16.03.2021 B2 2 Testing procedures (FAT) ellaboration
17.03.2021 B3 2 Quotations requests and analysis
18.03.2021 B3 2 Quotations requests and analysis
19.03.2021 B3 4 Quotations requests and analysis
22.03.2021 B3 8 Quotations requests and analysis
23.03.2021 B3 4 Quotations requests and analysis

Date and signature of staff member Date and signature of person in charge of the project
Name: Name:
Signature: Signature:

Date: Date:
TIMESHEET

Name of the enterprise SIS SA


Project Name LIFE17 ENV ES 331 MULTI-AD
Name of staff member Luiza Ocheana
Calendar Month / Year April 2021
Part / Full time* FULL TIME (8 hours/day)
*indicate the number of working hours per day

DATE ACTION TIME WORK DESCRIPTION

Date and signature of staff member Date and signature of person in charge of the project
Name: Name:
Signature: Signature:

Date: Date:
TIMESHEET

Name of the enterprise SIS SA


Project Name LIFE17 ENV ES 331 MULTI-AD
Name of staff member Luiza Ocheana
Calendar Month / Year May 2021
Part / Full time* FULL TIME (8 hours/day)
*indicate the number of working hours per day

DATE ACTION TIME WORK DESCRIPTION


04.05.2021 B3 8 Quotations requests and analysis - components
05.05.2021 B2 2 Testing procedures (FAT) ellaboration - review
05.05.2021 B3 2 Quotations requests and analysis - components
06.05.2021 B4 8
06.05.2021 B4 8
07.05.2021 B4 8
11.05.2021 B4 8
09.05.2021 B4 8
10.05.2021 B4 8
12.05.2021 B4 6
27.05.2021 B2 8 Testing procedures (FAT) ellaboration - review

Date and signature of staff member Date and signature of person in charge of the project
Name: Name:
Signature: Signature:

Date: Date:
TIMESHEET

Name of the enterprise SIS SA


Project Name LIFE17 ENV ES 331 MULTI-AD
Name of staff member Luiza Ocheana
Calendar Month / Year June 2021
Part / Full time* FULL TIME (8 hours/day)
*indicate the number of working hours per day

DATE ACTION TIME WORK DESCRIPTION


02.06.2021 B2 3 Corelation between automation cabinet design and electrical cabinet
03.06.2021 B3 5 Cabling project design
04.06.2021 B3 5 Quotations requests and analysis - components
07.06.2021 B2 8 Corelation between automation cabinet design and electrical cabinet
08.06.2021 B4 8 Cabling project design
09.06.2021 B4 8 Analysis of electrical design project
10.06.2021 B4 8 Analysis of electrical design project
11.06.2021 B4 3 Analysis of electrical design project
15.06.2021 B4 6 Analysis of electrical clarifications response

Date and signature of staff member Date and signature of person in charge of the project
Name: Name:
Signature: Signature:

Date: Date:
Name of Beneficiary SIS SA
Name of staff member Luiza Ocheana
Is staff member employed Full-time or Part-time Full time
Calendar Year 2021
Calendar Month January

Calendar Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total


In case of absence, indicate one of the reason codes below
Hours worked on project LIFE17 ENV/ES/000331 0,0 0,0 0,0 8,0 6,0 0,0 0,0 6,0 0,0 0,0 0,0 6,0 0,0 0,0 0,0 0,0 0,0 0,0 6,0 0,0 0,0 0,0 0,0 0,0 2,0 6,0 0,0 6,0 6,0 0,0 0,0 52,0
B1 PH WE WE WE WE WE WE WE WE WE WE
B2 PH WE WE 8,0 6,0 6,0 WE WE 6,0 WE WE 6,0 WE WE WE WE
B3 PH WE WE WE WE WE WE WE WE 2,0 6,0 6,0 6,0 WE WE
B4 PH WE WE WE WE WE WE WE WE WE WE
B5 PH WE WE WE WE WE WE WE WE WE WE
B6 PH WE WE WE WE WE WE WE WE WE WE
C PH WE WE WE WE WE WE WE WE WE WE
D PH WE WE WE WE WE WE WE WE WE WE
E PH WE WE WE WE WE WE WE WE WE WE
PH WE WE WE WE WE WE WE WE WE WE 0,0
Hours worked on project Smart Microgrid Controller EEA and
Norway Grants PH WE WE 2,0 8,0 8,0 WE WE 8,0 2,0 8,0 8,0 6,0 WE WE 8,0 2,0 8,0 8,0 8,0 WE WE 6,0 2,0 WE WE 92,0
Hours worked on project Multiscale financed through
Programul Operaţional Competitivitate PH WE WE 2,0 WE WE 2,0 WE WE WE WE 2,0 2,0 WE WE 8,0
Other activities PH WE WE WE WE WE WE WE WE WE WE 0,0
Total hours (including overtime) ### ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 0,0 8,0 8,0 ### ### 152,0
*) indicate project reference
**
) Breakdown of hours worked per action is optional

Absences Summary for this month


Weekend WE Hours worked on project LIFE17 ENV/ES/000331 52,0
Sick leave SL
Public holidays PH
Annual holidays AH 0 0,0
Other absence OA 92,0 Grants
Hours worked on project Smart Microgrid Controller EEA and Norway
Hours worked on project Multiscale financed through Programul8,0
Operaţional Competitivitate
Other activities 0,0
Total hours (including overtime) 152,0
*) indicate project reference

Date and signature of staff member Date, name and signature of line manager/supervisor
Gheorghe FLOREA

Explanation for late submission Explanation for late validation

"INSTRUCTIONS
         For any days during the month that you did not work enter the appropriate Absence Code, i.e. sickness, holiday, recuperation of overtime, etc.
         Enter the hours you worked for the Life project each day. If you work for more than one Life project be careful to enter the hours against the correct project.
         Enter the hours you worked on other (i.e. non-Life) activities.
         After the last entry of the month, sign it and date it and pass it on to your line manager/supervisor for validation.
         Please ensure the timesheet is signed and dated by both yourself and your line manager/supervisor within the first two weeks after the month the timesheet relates to. IF this time limit is not respected, please add an 
explanatory comment"
Name of Beneficiary SIS SA
Name of staff member Luiza Ocheana
Is staff member employed Full-time or Part-time Full time
Calendar Year 2021
Calendar Month February

Calendar Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Total


In case of absence, indicate one of the reason codes below
Hours worked on project LIFE17 ENV/ES/000331 0,0 0,0 2,0 0,0 6,0 0,0 0,0 0,0 0,0 0,0 8,0 6,0 0,0 0,0 2,0 6,0 8,0 2,0 0,0 0,0 0,0 4,0 0,0 0,0 8,0 0,0 0,0 0,0 52,0
B1 WE WE WE WE WE WE WE WE
B2 2,0 6,0 WE WE 8,0 6,0 WE WE 2,0 8,0 WE WE WE WE
B3 WE WE WE WE 6,0 2,0 WE WE 4,0 8,0 WE WE
B4 WE WE WE WE WE WE WE WE
B5 WE WE WE WE WE WE WE WE
B6 WE WE WE WE WE WE WE WE
C WE WE WE WE WE WE WE WE
D WE WE WE WE WE WE WE WE
E WE WE WE WE WE WE WE WE
WE WE WE WE WE WE WE WE 0,0
Hours worked on project Smart Microgrid Controller EEA and
Norway Grants 2,0 6,0 WE WE 2,0 WE WE 2,0 6,0 8,0 WE WE 2,0 6,0 8,0 WE WE 42,0
Hours worked on project Multiscale financed through
Programul Operaţional Competitivitate 8,0 6,0 8,0 2,0 WE WE 8,0 6,0 8,0 2,0 WE WE 6,0 WE WE 2,0 2,0 WE WE 58,0
Other activities WE WE WE WE WE WE WE WE 0,0
Total hours (including overtime) 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 6,0 8,0 8,0 2,0 ### ### 0,0 0,0 0,0 152,0
*) indicate project reference
**
) Breakdown of hours worked per action is optional

Absences Summary for this month


Weekend WE Hours worked on project LIFE17 ENV/ES/000331 52,0
Sick leave SL
Public holidays PH
Annual holidays AH 0 0,0
Other absence OA 42,0 Grants
Hours worked on project Smart Microgrid Controller EEA and Norway
58,0
Hours worked on project Multiscale financed through Programul Operaţional Competitivitate
Other activities 0,0
Total hours (including overtime) 152,0
*) indicate project reference

Date and signature of staff member Date, name and signature of line manager/supervisor
Gheorghe FLOREA

Explanation for late submission Explanation for late validation

"INSTRUCTIONS
         For any days during the month that you did not work enter the appropriate Absence Code, i.e. sickness, holiday, recuperation of overtime, etc.
         Enter the hours you worked for the Life project each day. If you work for more than one Life project be careful to enter the hours against the correct project.
         Enter the hours you worked on other (i.e. non-Life) activities.
         After the last entry of the month, sign it and date it and pass it on to your line manager/supervisor for validation.
         Please ensure the timesheet is signed and dated by both yourself and your line manager/supervisor within the first two weeks after the month the timesheet relates to. IF this time limit is not respected, please add an 
explanatory comment"
Name of Beneficiary SIS SA
Name of staff member Luiza Ocheana
Is staff member employed Full-time or Part-time Full time
Calendar Year 2021
Calendar Month March

Calendar Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total


In case of absence, indicate one of the reason codes below
Hours worked on project LIFE17 ENV/ES/000331 2,0 2,0 2,0 2,0 6,0 0,0 0,0 2,0 2,0 2,0 2,0 6,0 0,0 0,0 2,0 2,0 2,0 2,0 4,0 0,0 0,0 8,0 4,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 52,0
B1 WE WE WE WE WE WE WE WE
B2 2,0 2,0 2,0 2,0 6,0 WE WE 2,0 2,0 2,0 2,0 6,0 WE WE 2,0 2,0 WE WE WE WE
B3 WE WE WE WE 2,0 2,0 4,0 WE WE 8,0 4,0 WE WE
B4 WE WE WE WE WE WE WE WE
B5 WE WE WE WE WE WE WE WE
B6 WE WE WE WE WE WE WE WE
C WE WE WE WE WE WE WE WE
D WE WE WE WE WE WE WE WE
E WE WE WE WE WE WE WE WE
WE WE WE WE WE WE WE WE 0,0
Hours worked on project Smart Microgrid Controller EEA and
Norway Grants WE WE WE WE WE WE 4,0 8,0 8,0 WE WE 8,0 28,0
Hours worked on project Multiscale financed through
Programul Operaţional Competitivitate 6,0 6,0 6,0 6,0 2,0 WE WE 6,0 6,0 6,0 6,0 2,0 WE WE 6,0 6,0 6,0 6,0 2,0 WE WE 2,0 WE WE 80,0
Other activities WE WE WE WE WE WE WE WE 0,0
Total hours (including overtime) 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 6,0 ### ### 8,0 8,0 8,0 8,0 2,0 ### ### 8,0 0,0 0,0 160,0
*) indicate project reference
**
) Breakdown of hours worked per action is optional

Absences Summary for this month


Weekend WE Hours worked on project LIFE17 ENV/ES/000331 52,0
Sick leave SL
Public holidays PH
Annual holidays AH 0 0,0
Other absence OA 28,0 Grants
Hours worked on project Smart Microgrid Controller EEA and Norway
80,0
Hours worked on project Multiscale financed through Programul Operaţional Competitivitate
Other activities 0,0
Total hours (including overtime) 160,0
*) indicate project reference

Date and signature of staff member Date, name and signature of line manager/supervisor
Gheorghe FLOREA

Explanation for late submission Explanation for late validation

"INSTRUCTIONS
         For any days during the month that you did not work enter the appropriate Absence Code, i.e. sickness, holiday, recuperation of overtime, etc.
         Enter the hours you worked for the Life project each day. If you work for more than one Life project be careful to enter the hours against the correct project.
         Enter the hours you worked on other (i.e. non-Life) activities.
         After the last entry of the month, sign it and date it and pass it on to your line manager/supervisor for validation.
         Please ensure the timesheet is signed and dated by both yourself and your line manager/supervisor within the first two weeks after the month the timesheet relates to. IF this time limit is not respected, please add an 
explanatory comment"
Name of Beneficiary SIS SA
Name of staff member Luiza Ocheana
Is staff member employed Full-time or Part-time Full time
Calendar Year 2021
Calendar Month April

Calendar Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Total


In case of absence, indicate one of the reason codes below
Hours worked on project LIFE17 ENV/ES/000331 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0
B1 WE WE WE WE WE WE WE WE PH
B2 WE WE WE WE WE WE WE WE PH
B3 WE WE WE WE WE WE WE WE PH
B4 WE WE WE WE WE WE WE WE PH
B5 WE WE WE WE WE WE WE WE PH
B6 WE WE WE WE WE WE WE WE PH
C WE WE WE WE WE WE WE WE PH
D WE WE WE WE WE WE WE WE PH
E WE WE WE WE WE WE WE WE PH
Hours worked on project Prevention ITEA WE WE WE WE WE WE WE WE PH 0,0
Hours worked on project Smart Microgrid Controller EEA and
Norway Grants 8,0 8,0 WE WE 5,0 WE WE WE WE WE WE PH 21,0
Hours worked on project Multiscale financed through
Programul Operaţional Competitivitate WE WE 3,0 8,0 8,0 8,0 8,0 WE WE 8,0 8,0 8,0 8,0 8,0 WE WE WE WE PH 75,0
Other activities WE WE WE WE WE WE 8,0 8,0 8,0 8,0 8,0 WE WE 8,0 8,0 8,0 8,0 PH 72,0
Total hours (including overtime) 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 ### 0,0 168,0
*) indicate project reference
**
) Breakdown of hours worked per action is optional

Absences Summary for this month


Weekend WE Hours worked on project LIFE17 ENV/ES/000331 0,0
Sick leave SL
Public holidays PH
Annual holidays AH Hours worked on project Prevention ITEA 0,0
Other absence OA 21,0 Grants
Hours worked on project Smart Microgrid Controller EEA and Norway
75,0
Hours worked on project Multiscale financed through Programul Operaţional Competitivitate
Other activities 72,0
Total hours (including overtime) 168,0
*) indicate project reference

Date and signature of staff member Date, name and signature of line manager/supervisor
Gheorghe FLOREA

Explanation for late submission Explanation for late validation

"INSTRUCTIONS
         For any days during the month that you did not work enter the appropriate Absence Code, i.e. sickness, holiday, recuperation of overtime, etc.
         Enter the hours you worked for the Life project each day. If you work for more than one Life project be careful to enter the hours against the correct project.
         Enter the hours you worked on other (i.e. non-Life) activities.
         After the last entry of the month, sign it and date it and pass it on to your line manager/supervisor for validation.
         Please ensure the timesheet is signed and dated by both yourself and your line manager/supervisor within the first two weeks after the month the timesheet relates to. IF this time limit is not respected, please add an 
explanatory comment"
Name of Beneficiary SIS SA
Name of staff member Luiza Ocheana
Is staff member employed Full-time or Part-time Full time
Calendar Year 2021
Calendar Month May

Calendar Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total


In case of absence, indicate one of the reason codes below
Hours worked on project LIFE17 ENV/ES/000331 0,0 0,0 0,0 8,0 4,0 8,0 8,0 0,0 0,0 8,0 8,0 8,0 8,0 6,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 8,0 0,0 0,0 0,0 0,0 74,0
B1 WE WE PH WE WE WE WE WE WE WE WE
B2 WE WE PH 2,0 WE WE WE WE WE WE 8,0 WE WE
B3 WE WE PH 8,0 2,0 WE WE WE WE WE WE WE WE
B4 WE WE PH 8,0 8,0 WE WE 8,0 8,0 8,0 8,0 6,0 WE WE WE WE WE WE
B5 WE WE PH WE WE WE WE WE WE WE WE
B6 WE WE PH WE WE WE WE WE WE WE WE
C WE WE PH WE WE WE WE WE WE WE WE
D WE WE PH WE WE WE WE WE WE WE WE
E WE WE PH WE WE WE WE WE WE WE WE
Hours worked on project Prevention ITEA WE WE PH WE WE WE WE WE WE WE WE 0,0
Hours worked on project Smart Microgrid Controller EEA and
Norway Grants WE WE PH WE WE WE WE 8,0 8,0 6,0 WE WE WE WE 22,0
Hours worked on project Multiscale financed through
Programul Operaţional Competitivitate WE WE PH 4,0 WE WE 2,0 WE WE 8,0 8,0 WE WE 8,0 8,0 6,0 WE WE 44,0
Other activities WE WE PH WE WE WE WE 2,0 WE WE 2,0 8,0 WE WE 8,0 20,0
Total hours (including overtime) ### ### ### 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 160,0
*) indicate project reference
**
) Breakdown of hours worked per action is optional

Absences Summary for this month


Weekend WE Hours worked on project LIFE17 ENV/ES/000331 74,0
Sick leave SL
Public holidays PH
Annual holidays AH Hours worked on project Prevention ITEA 0,0
Other absence OA 22,0 Grants
Hours worked on project Smart Microgrid Controller EEA and Norway
44,0
Hours worked on project Multiscale financed through Programul Operaţional Competitivitate
Other activities 20,0
Total hours (including overtime) 160,0
*) indicate project reference

Date and signature of staff member Date, name and signature of line manager/supervisor
Gheorghe FLOREA

Explanation for late submission Explanation for late validation

"INSTRUCTIONS
         For any days during the month that you did not work enter the appropriate Absence Code, i.e. sickness, holiday, recuperation of overtime, etc.
         Enter the hours you worked for the Life project each day. If you work for more than one Life project be careful to enter the hours against the correct project.
         Enter the hours you worked on other (i.e. non-Life) activities.
         After the last entry of the month, sign it and date it and pass it on to your line manager/supervisor for validation.
         Please ensure the timesheet is signed and dated by both yourself and your line manager/supervisor within the first two weeks after the month the timesheet relates to. IF this time limit is not respected, please add an 
explanatory comment"
Name of Beneficiary SIS SA
Name of staff member Luiza Ocheana
Is staff member employed Full-time or Part-time Full time
Calendar Year 2021
Calendar Month June

Calendar Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Total


In case of absence, indicate one of the reason codes below
Hours worked on project LIFE17 ENV/ES/000331 0,0 3,0 5,0 5,0 0,0 0,0 8,0 8,0 8,0 8,0 3,0 0,0 0,0 0,0 6,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 54,0
B1 AH WE WE WE WE WE WE AH WE WE
B2 AH 3,0 WE WE 8,0 WE WE WE WE AH WE WE
B3 AH 5,0 5,0 WE WE WE WE WE WE AH WE WE
B4 AH WE WE 8,0 8,0 8,0 3,0 WE WE 6,0 WE WE AH WE WE
B5 AH WE WE WE WE WE WE AH WE WE
B6 AH WE WE WE WE WE WE AH WE WE
C AH WE WE WE WE WE WE AH WE WE
D AH WE WE WE WE WE WE AH WE WE
E AH WE WE WE WE WE WE AH WE WE
Hours worked on project Prevention ITEA AH WE WE WE WE WE WE AH WE WE 0,0
Hours worked on project Smart Microgrid Controller EEA and
Norway Grants AH 5,0 3,0 3,0 WE WE WE WE 8,0 2,0 8,0 8,0 8,0 WE WE AH 8,0 WE WE 53,0
Hours worked on project Multiscale financed through
Programul Operaţional Competitivitate AH WE WE WE WE WE WE AH 8,0 8,0 8,0 WE WE 8,0 8,0 5,0 45,0
Other activities AH WE WE 5,0 WE WE WE WE AH WE WE 3,0 8,0
Total hours (including overtime) ### 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 8,0 8,0 ### ### ### 8,0 8,0 8,0 8,0 ### ### 8,0 8,0 8,0 0,0 160,0
*) indicate project reference
**
) Breakdown of hours worked per action is optional

Absences Summary for this month


Weekend WE Hours worked on project LIFE17 ENV/ES/000331 54,0
Sick leave SL
Public holidays PH
Annual holidays AH Hours worked on project Prevention ITEA 0,0
Other absence OA 53,0 Grants
Hours worked on project Smart Microgrid Controller EEA and Norway
45,0
Hours worked on project Multiscale financed through Programul Operaţional Competitivitate
Other activities 8,0
Total hours (including overtime) 160,0
*) indicate project reference

Date and signature of staff member Date, name and signature of line manager/supervisor
Gheorghe FLOREA

Explanation for late submission Explanation for late validation

"INSTRUCTIONS
         For any days during the month that you did not work enter the appropriate Absence Code, i.e. sickness, holiday, recuperation of overtime, etc.
         Enter the hours you worked for the Life project each day. If you work for more than one Life project be careful to enter the hours against the correct project.
         Enter the hours you worked on other (i.e. non-Life) activities.
         After the last entry of the month, sign it and date it and pass it on to your line manager/supervisor for validation.
         Please ensure the timesheet is signed and dated by both yourself and your line manager/supervisor within the first two weeks after the month the timesheet relates to. IF this time limit is not respected, please add an 
explanatory comment"

You might also like