Annular BOP Rev.A1
FHZ53-21

1
Security Guide
The manual covers matters needing attention for ensuring personal safety as well as protecting product and
connected equipment from damage.
All matters needing attention are given with symbols for clear warning and are also respectively described with
the following characters upon on the severity:
Notice
Ignoring proper prevention measures may cause injuries, deaths, serious personal injury or large property
loss.
Notice
Catch your attention on important information of the product or specific part during handling with the product
or files.
Competent person
No one but the competent person is authorized to assemble and operate the equipment. The competent
person shall be the person with certain experience on on-site well control and be able to assemble, perform
test run and operate the equipment according to specified safety practices and standards.
Correct way to use
Pay attention to the following:
Notice
The equipment and assemblies thereof shall be applied only to description in product catalogue or technical
manual, and shall be connected only with devices or assemblies that are approved by Shenkai or other
recommended manufacturers.
Safety first shall be complied for well control equipment. Any quick-wear metal and nonmetal part, in particular
the packer that influences the product safety and performance in test shall be replaced timely.
The product can work correctly and safely on the premise of correct transportation, storage, assembling,
installing, and being operated and maintained by the recommended mode.

Trademarks ○
R ○
R ○
R

, , , are the registered trademark of Shenkai.


Any third party using other names related to the trademarks in this manual for its own purpose (s) shall be treated as
infringing the rights and interests of the proprietor of the trademarks.
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd holds the copyright ○c 2013. All rights reserved.
None of the manual or contents may be reproduced, transmitted or used without clear written authorization.
Rights reserved. All rights reserved, including patent right, utility model or appearance design exclusive right.
The BOP meets the requirements of standards API 16A and GB/ T20174 and gained logo usage license issued by API
and production license issued by State Administration for Quality Supervision and Inspection and Quarantine:

16A-0111, , XK14-001-0002 .
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd hereby declares that by check the contents of the
manual are consistent with the product and cannot in the nature of things be free from error, the consistency is
maximized. The contents of the manual will be reviewed at fixed period and modified in the next version. Suggestions
for improvements are highly welcomed.
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd holds the copyright ○c 2015. No inform will be made for
any change.
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd Contract No.
Technical Support Department
Customer Hotline: +86(21)64290467 Fax: +86(21) 64290467
Website: www.shenkai.com Postal Code: 201114
Catalogue
1 Overview ......................................................................................................................................................1

2 Model & Specification and Technical Parameters .......................................................................................2


2.1 Model .................................................................................................................................................2
2.1.1 Bore Code ...............................................................................................................................2
2.1.2 Rated Working Pressure .........................................................................................................2
2.1.3 Temperature Grade .................................................................................................................3
2.2 Annular BOP Technical Parameters ..................................................................................................4
3 Working Principles and Structure Characteristics .......................................................................................5
3.1 Annular BOP Working principles .......................................................................................................5
3.2 Structural features of annular BOP ...................................................................................................7
3.3 Sealing principle of tapered packer ...................................................................................................7
3.4 Structural features of tapered packer ................................................................................................8
3.5 Parts list .............................................................................................................................................9
4 Installation and Use ................................................................................................................................... 11
4.1 Preparation for use .......................................................................................................................... 11
4.2 Pressure test and test run ............................................................................................................... 11
4.3 Usage and matters needing attention ............................................................................................ 12
5 Disassembly and Maintenance................................................................................................................. 14
5.1 Disassembling steps ...................................................................................................................... 14
5.2 Maintenance and Replacing of Annular BOP ................................................................................. 17
5.3 Replacement of packer .................................................................................................................. 18
5.4 Detection of service life of Taper packer ........................................................................................ 19
5.5 Matters needing attention for assembly ......................................................................................... 20
5.6 Daily maintenance .......................................................................................................................... 21
5.7 Operating Period Maintenance ...................................................................................................... 21
6 Preservation procedures .......................................................................................................................... 23
6.1 Storing for periods greater than 30 days ........................................................................................ 23
6.2 Storage of Rubber Parts ................................................................................................................. 23

7 Common Troubles and Troubleshooting .................................................................................................. 24

FHZ53-21 Annular BOP P/N:H15.00


This manual applies to
FHZ54-14 Annular BOP P/N:FHZ5414-00
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

1 Overview
Annular BOP is the key part of well control device and its main purpose is to control
wellhead pressure to effectively prevent blowout accident and realize safe construction
during drilling, well repair, well test and other processes. Its appearance sees Fig.1-1.
The annular BOP shall be used only after a BOP hydraulic control device is equipped,
and it is always used in match with ram BOP or works independently. The annular BOP
can be used for doing the works below:
 Sealing annular spaces of different sizes with one packer when there is drilling
tool, oil pipe or sleeve in the well;
 Sealing the whole wellhead when there is no drilling tool in the well;
 Sealing the annular spaces formed by the drilling rod, coring tool, cable, steel
wire rope and the like with the shaft in case of overflowing or blowout during
drilling, coring, testing well and other works;
 Forcibly lifting and lowering down the drilling tool through drill pipe sub of 18°
circular bead under the condition that the hydraulic control device with the
pressure releasing and regulating valve is used or the buffering energy storage
device performs control.

Fig.1-1 Appearance of annular BOP

1
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

2 Model & Specification and Technical Parameters


2.1 Model

FH Z
Code of bottom connecting flange:
omit when the connecting flange reaches the
rated working pressure.

Show related working pressure:


its unit is MPa.
Code of Bore
Code of form of rubber core: tapered rubber core-Z;
spherical rubber core-omit

Code of annular BOP

E.g.
“FHZ54-14“represents that the annular BOP is equipped with tapered rubber, its
bore size φ is 539.8mm(21 1/4″), the rated working pressure is 14Mpa(2000psi), and the
rated working pressure of the bottom connecting flange is 14MPa(2000psi)。

2.1.1 Bore Code

Table 2-1 Bore Code

Bore code Bore size (in) Bore code Bore size (in)
18 7 1/16 〃 48 18 3/4〃
23 9〃 53 20 3/4〃
28 11〃 54 21 1/4〃
35 13 5/8〃 68 26 3/4〃
43 16 3/4〃 76 30〃

2.1.2 Rated Working Pressure

The BOP has rated working pressure at six grades, as shown in Table 2-2.

Table 2-2 Rated working pressure

Rated working pressure


Code
MPa psi
14 13.8 2,000
21 20.7 3,000
35 34.5 5,000
70 69.0 10,000
105 103.5 15,000
140 138.0 20,000

2
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

2.1.3 Temperature Grade

Minimum temperature is namely the minimum environmental temperature that might


be suffered from, and maximum temperature is namely the maximum temperature of the
liquid flowing through the equipment.
Metal parts of the equipment work within the temperature range as shown in Table
2-3.
Synthetic rubber materials in the equipment, contacting with the liquid in the well,
work at the temperature grade as shown in Table 2-4.

Table 2-3 Temperature grade of metal material

Code of
API code Range of working temperature
temperature grade
T-75 75 -59℃~121℃(-75 ºF ~250 ºF)
T-20 20 -29℃~121℃(-20 ºF ~250 ºF)
T-0 00 -18℃~121℃(0 ºF ~250 ºF)

Table 2-4 Temperature grade of nonmetal sealing material in contact with liquid in well

Lower limit (first letter) Upper limit (second letter)


Code Temperature Code Temperature
A -26℃(-15℉) A 82℃(180℉)
B -18℃(0℉) B 93℃(200℉)
C -12℃(10℉) C 104℃(220℉)
D -7℃(20℉) D 121℃(250℉)
E.g. AB represents the temperature grade of -26℃~93℃ (-15℉~200℉), and the specific
temperature grade is marked on the sealing part.

3
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

2.2 Annular BOP Technical Parameters

Figure2-1 Outline drawing of FHZ54-14 Annular BOP

Table2-5 Specification and main technical parameters of annular BOP

Description Annular BOP


Model FHZ53-21 FHZ54-14
Bore 527.1 mm(20 3/4”) 539.8 mm(21 1/4”)
Rated working pressure 21 MPa(3000psi) 14 MPa(2000psi)
Hydrostatic test pressure 31.5 MPa(4500psi) 21 MPa(3000psi)
Hydraulic control rated
working pressure 21 MPa(3000psi)
Recommended hydraulic
control operation pressure 8.4-10.5MPa(1200-1500psi)
Opening capacity of
hydraulic cylinder 69 L 72 L
Closing capacity of
hydraulic cylinder 115 L 118 L
Temperature grade of metal
material T-20
Temperature grade of
nonmetal material
BB
Connection mode of bonnet
and shell
Jaw
Form of sealing packer Tapered
Specification of hydraulic
control connection Z1”(1 1/2”) ×2 Z1”(1 1/2”) ×2
Outside Dimension φ 1372×1463 φ 1516×1337
Net weight 7873kg 6780kg
Introductions:
The BOP is designed and manufactured according to specifications API Spec 16A.
The part in the BOP, in contact with liquid in well is resistant to hydrogen sulfide stress corrosion, and the
requirements of NACE MR-0175 are met.

4
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

3 Working Principles and Structure Characteristics


3.1 Annular BOP Working principles
The bonnet and shell of the annular BOP with the tapered packer are connected with
jaw chuck. The annular BOP is mainly composed of shell, bonnet, piston, packer, jaw
chuck, outer sleeve, inner sleeve, anti-wear plate, sealing part and other parts. (Fig.3-1)

Bonnet

Wear plate

Jaw

Tapered packer
Inner sleeve Piston

Shell

Sealing Outer
component sleeve

Fig3-1 Configuration of Annular BOP

5
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1
Hydraulic control principle:
 Sealing wellhead: feeding high-pressure oil conveyed through the hydraulic control
device from lower oil port of the shell into lower closed chamber of the piston to
push the piston to move upwards when well kick occurs and shut-in is needed, the
piston will push the taper-face sealing packer to move upwards, the packer moves
upwards and toward the center of the wellhead along the taper surface of the piston
and the anti-wear plate while moving upwards under the limitation of the anti-wear
plate until the rubber among the supporting ribs is extruded out to tightly hold the
drilling tool or seal the whole wellhead, so as to reach the purpose of sealing the
well.
 Opening wellhead: feeding high-pressure oil from the upper oil port in the shell into
the upper opened chamber in the piston to push the piston to move downwards, on
that basis, the extruding force on the anti-wear plate is removed, the packer is
gradually restored under the effect of elastic force of self, and as a result, the
purpose of opening the well is reached.
The oil channel diagram sees Fig.3-2.

Packer is closed and piston moves upwards


Packer is opened and piston moves downwards

Fig.3-2 Diagram of hydraulic oil line under opening-closing of packer and movement of piston

6
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

3.2 Structural features of annular BOP


1. The shell, bonnet, piston and other main parts are casted and molded through
quality alloy structural steel, their materials meet the provisions of NACE MR-01-75, and
the requirements of working conditions with acid medium are met. The materials are
subjected to special heat treatment, the hydrostatic pressure test is performed according
to the regulations of API 16A during manufacturing the product, in order to ensure safe
and reliable use under its working pressure.
2. Three dynamic sealing parts of the annular BOP are equipped with lip-type sealing
rings which bring pressure-based self-sealing performances, the wear of the sealing rings
is reduced, the sealing reliability is ensured, and leakage is avoided (Fig.3-1).
◆ Piston O.D.: packing pressure of opening chamber and closing chamber of oil
cylinder on the outside diameter of the piston;
◆Piston I.D: packing well pressure and closing chamber pressure on outer sleeve;
◆ Inner sealing part of bonnet: packing well pressure and pressure of oil cylinder
opening chamber on bonnet;
3. The piston travel measuring hole is formed in the bonnet and used for
continuously comparing the piston travel to measure the service life of the packer.
4. The shell is connected with the bonnet through 20 jaw chucks (Fig.3-1), the
connection is reliable, the force on the shell is uniform, and mounting and disassembling
are convenient. Two O-shaped sealing rings that can prevent the jaw chucks and the
bonnet from rusting integrally are arranged on the screw of each jaw chuck.
5. The upper inner chamber of the piston is conical and is directly contacted with the
taper surface of the packer. The taper is small, so the force for pushing the piston to
realize sealing is also small. The outside diameter is smaller than that of the annular BOP
of other types;
6. Detachable anti-wear plate (Fig.3-1) is assembled on the frictional surface in
which the top part of the inner chamber of the bonnet is contacted with the top plate of the
packer supporting plate, which can protect the bonnet and is convenient to replace.

3.3 Sealing principle of tapered packer


The sealing of annular BOP includes two steps, the first step is that the piston
pushes the tapered packer under the effect of hydraulic oil to move upwards, the packer
is driven to move upwards and toward the center of the wellhead along the taper surface
of the piston and the anti-wear plate, the supporting ribs are close to each other to
extrude the rubber to the center of the wellhead, so as to realize initial sealing; the
second step is that the piston further moves upwards under the effect of the internal well
pressure under annular area of the upper part of the inner chamber of the piston when
there is pressure in the well, thus the packer can be tightly sealed, and as a result, the
sealing performance of the packer is improved, namely, the effect of assisting sealing
with the well pressure is realized.

7
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

3.4 Structural features of tapered packer


1、The outer side surface of the packer is a taper surface, the bus of the taper
surface is in a certain included angle relative to the axis of the packer. The packer is
formed by vulcanizing a plurality of supporting iron cores and rubber, and the supporting
iron cores are radially arranged along the circular ring (Fig.3-3).
2. Large rubber storage capacity: the rubber among the supporting iron cores of the
packer can be extruded toward the wellhead to form sealing, and the amount of rubber is
far more than the volume of the space to be sealed. Therefore, drilling tools of different
shapes and different sizes can be sealed, and the whole wellhead can also be sealed. If
the hydraulic control pressure is under the control of the pressure releasing and
regulating valve or the buffering energy storage device, the packer can forcibly lift and
lower down the drilling tool to pass through the drill pipe sub of 18°circular bead. In case
that the rubber storage capacity is large and the packer is damaged a little, the sealing
can also be performed, and the service life can be measured. When the annular BOP
works, the packer is continuously worn, the travel of the piston is increased to extrude
more backup rubber to supplement. If the piston reaches the maximum travel (the piston
reaches the upper top point), or the upper end surface and the lower end surface of the
packer supporting iron cores are close to each other, the backup rubber of the packer
runs out, namely, the packer cannot be reliably sealed even after the hydraulic control
pressure is increased. Therefore, the service life of the packer can be measured by
measuring the travel of the piston. (Method for measuring service life of packer sees 5.5)

Fig.3-3 Schematic diagram of appearance of tapered packer

8
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

3.5 Parts list

12.

1.

2.
13.

14.
15.

3.

16.

4.

5.
17.

6.

18.

19.
7.

8.
20.
9.
21.
22.
10.
23.

11.
24.

25.

Fig.3-4 Detail sketch of parts of annular BOP


9
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1
Table 3-1 Parts list

FHZ53-21 FHZ54-14
No. Description Qty
Part No./Model Part No./Model
1 Bonnet H15.01 FHZ5414-03 1
2 O-ring FHZ5414-09 FHZ5414-09 2
3 Tapered packer H15.04.00 FHZ5414.02-00 1
4 Piston FHZ5414-13 FHZ5414-13 1
5 Stud GB70-85 M24×80 GB70-85 M24×80 16
6 Outer Sleeve FHZ5414-14 FHZ5414-14 1
7 Inner Sleeve FHZ5414-16 FHZ5414-16 1
8 Jaw chuck FHZ5414-05 FHZ5414-05 20
9 Screw of jaw chuck FHZ5414-06 FHZ5414-06 20
10 Screw GB70-85 M12×70 GB70-85 M12×70 4
11 Shell H15.02.00 FHZ5414.11-00 1
12 Z 3/4” Plug SFZ1310-01 SFZ1310-01 1
Inner sealing ring of
13 FHZ5414-08 FHZ5414-08 2
bonnet
14 Anti-wear plate FHZ5414-01 FHZ5414-01 1
15 Stud M12×35 GB5783-86 M12×35 GB5783-86 M12×35 6
16 Sealing ring of piston FH5414-15 FH5414-15 2
Seal Ring of Outer
17 FH5414-12 FH5414-12 2
Sleeve
18 O-ring FHZ5414-17 FHZ5414-17 1
19 Stud M12×45 GB70-85 M12×45 GB70-85 M12×45 16
20 O-ring 25×2.65 25×2.65 25×2.65 20
21 Supporting screw FHZ5414-07 FHZ5414-07 20
22 O-ring 53×5.3 53×5.3 53×5.3 20
23 Bonnet chuck FHZ5414-04 FHZ5414-04 4
24 Adapter substitute FHZ5414-10 FHZ5414-10 2
25 Plug F02-15 F02-15 2

Table 3-2 Spare parts list for one year

FHZ53-21 FHZ54-14
No. Description Qty
Part No./Model Part No./Model
2 O-ring FHZ5414-09 FHZ5414-09 2
13 Inner sealing ring of bonnet FHZ5414-08 FHZ5414-08 2
16 Sealing ring of piston FH5414-15 FH5414-15 2
17 Seal Ring of Outer Sleeve FH5414-12 FH5414-12 2
18 O-ring FHZ5414-17 FHZ5414-17 1
20 O-ring 25×2.65 25×2.65 20
22 O-ring 53×5.3 53×5.3 20

10
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

4 Installation and Use


4.1 Preparation for use
he annular BOP shall be subjected to sealing pressure test until reaching the rated
working pressure before installation and shall be transported to the well site only after
passing the test. The annular BOP shall be installed according to the form of combination
of BOP as specified by the well control regulations. The direction of the oil pipe joint shall
be the same as that of the ram BOP.

4.2 Pressure test and test run


The annular BOP shall be fixed firmly after installation. Whether the blowout
controller, well controller and choke manifold are connected well, the hydrostatic pressure
test shall be performed together with the complete set of wellhead device, in order to
examine the reliability of each connecting part and the sealing performance, and they just
can be used after passing the test.
The annular BOP shall be started and stopped twice on the drill stand and remote
control panel, in order to check whether the starting and stopping are consistent with the
actual starting and stopping, and whether the pipeline is connected correctly. The air in
the oil line shall be exhausted. When in general drilling, the annular BOP shall be in
startup position.
The wellhead device shall be comprehensively subjected to pressure test according
to related well control regulation. Each connecting bolt shall be fastened once after
pressure test, in order to avoid non-uniform elasticity. The tightening torque of the flange
bolt sees Table 4-1 or Table 4-2.

Table 4-1 Recommended value (Metric system) of connecting and tightening torque of stud and

screw

Specifications of Tightening Specifications of Tightening Specifications of Tightening

stud and screw torque/ N·m stud and screw torque/ N·m stud and screw torque/ N·m

M12 80 M33×3 1292 M52×3 5505


M16 153 M36×3 1737 M58×3 7892
M20 266 M39×3 2272 M64×3 10885
M22 424 M42×3 2910 M70×3 14549
M27 643 M45×3 3654 M76×3 18957
M30×3 930 M48×3 4516 M80×3 21565

11
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

Table 4-1 Recommended value (British system) of connecting and tightening torque of stud and

screw

Specifications of Tightening Specifications of Tightening Specifications of Tightening

stud and screw torque/ ft·lb stud and screw torque/ ft·lb stud and screw torque/ ft·lb

1/2-13UNC 59 1 1/4-8UN 953 2-8UN 4060


5/8-11UNC 113 1 3/8-8UN 1281 2 1/4-8UN 5821
3/4-10UNC 196 1 1/2-8UN 1676 2 1/2-8UN 8028
7/8-9UNC 313 1 5/8-8UN 2146 2 3/4-8UN 10731
1-UN 474 1 3/4-8UN 2695 3-8UN 13982
1 1/8-UN 686 1 7/8-8UN 3331 3 1/4-8UN 17830

4.3 Usage and matters needing attention


1. The annular BOP is equipped with individual pressure releasing and regulating
valve, the pressure shall be controlled to be less than or equal to 10.5MPa in general,
and the pressure is in a certain proportional relation with the internal well pressure and
the size of the sealing drilling tool. If the drilling tool is of a large diameter or the internal
well pressure is small, the control pressure shall be correspondingly reduced to prolong
the service life of the packer.
2. When in well kicking, the wellhead shall be sealed through the annular BOP,
long-time sealing shall be avoided when possible because the packer is easily damaged
early, and locking device for locking is not provided. The annular BOP shall be not used
to seal empty hole unless special conditions occur.
3. The examination on the annular BOP shall be reinforced after entering the
targeted layer. The annular BOP shall be started and stopped once each day under the
condition that there are drilling tool and no well pressure in the well, in order to prevent
the packer from blocking.
4. When operating the annular BOP to lift and lower down the drilling tool without
well control, the drill pipe sub of 18°circular bead shall be used. If the energy storage
device can be assembled on the closing oil line of the hydraulic control system of the
annular BOP, besides the individually provided pressure releasing and regulating valve,
the hydraulic impact in the chamber can be closed to realize buffer, and therefore, the
service life of the packer can be prolonged. When forcibly lifting and lowering down the
drilling tool, the hydraulic pressure shall be reduced when possible on the premise that
the sealing is ensured, and meanwhile, the speed of lifting and lowering down the drilling
tool shall be controlled strictly, the drilling tool is particularly slowly lifted and lowered
down during passing through the sub.
5. After well cementing operation, open and close annular BOP three times to
discharge the cement in Body sleeve to prevent the cement solidification lead to the
piston cannot be moved.
6. Whether the annular BOP is completely started shall be examined while starting
12
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1
each time, in order to prevent the packer from being hung and damaged.
7. Releasing internal well pressure by opening the packer of the BOP is prohibited.
8. The drilling tool can be moved up and down, rather than rotating when the
annular BOP is in the state that the pipe is closed.
9. The hydraulic oil shall be kept clean.
Recommended Hydraulic Oil for the Hydraulic System for BOP Stacks
 ISO Brand: HM32 (used for plunger pump system with low or no Zn)
 Mobil Brand: D.T.E24 (used for plunger pump system with low or no Zn)
 Shell Brand: Tellus32 (used for plunger pump system with low or no Zn)
Note: The kinematic viscosity of hydraulic oil is 17-33 mm2/s when the temperature
is at 50℃.

Warning: Lugs on the annular BOP shell is used only for lifting the annular BOP
body, rather than lifting the BOP set (annular BOP+ ram BOP+ drilling spool+
others)!

13
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

5 Disassembly and Maintenance


The BOP shall be subjected to appearance examination and seal test before starting
drilling each time or entering high-pressure hydrocarbon reservoir.
BOP shall be comprehensively disassembled for examination and cleaning after
serving a well each time, and any damaged parts shall be replaced timely. Oil shall be
coated on the inner taper surface of the piston to avoid rusting, and the screw thread oil
shall be coated on the connecting thread part.

5.1 Disassembling steps


All the part numbers below refer to Fig.3-4.
5.1.1、Screw down the internal hexagonal screw (Number 10), and disassemble the
bonnet chuck (Number 23).

5.1.2、Release the jaw chuck screw (Number 9, anticlockwise rotate in about 5.5
cycles), and take away the jaw chuck from the bonnet.

14
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1
5.1.3、Lift out the bonnet (Number 1) through the lifting ring screw, and disassemble
the anti-wear plate (Number 14, disassemble only for replacement).

5.1.4 Lift out the tapered packer (Number 3) with lifting ring screw.

15
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1
5.1.5、Suck off oil from the oil chamber of shell through oil pump or cotton cloth, and
then slowly lift out the piston (Number 4) through lifting tool.

5.1.6、Screw out internal hexagonal screw (Number 5) and lift out the outer sleeve
(Number 6).

16
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1
5.1.7、Screw out internal hexagonal screw (Number 19) and lift out the inner sleeve
(Number 7).

5.2 Maintenance and Replacing of Annular BOP


1、The inner conical surface of piston:Check the sealing surface between the
piston’s inner conical surface and packer, repair them with abrasive paper or oilstone for
shallow scratch. It should be repaired or replaced according to SY/T6160 if there are
defects such as serious wear, crack or pit.
2、Piston: It should be repaired and replaced if the O.D. or I.D. of the piston is worn
0.5mm more than the limited tolerance. The wear ring should be replaced if its O.D. is
worn over original limited tolerance.
3、Check the wear plate in the bonnet. It should be replaced in time if it is worn
seriously.
4、Seal groove:Inspect the seal groove. It should be repaired with abrasive paper or
oilstone if there is any pit.
5 、 Packer: Inner hole and conical surface of packing unit with any serious
deformation, crack, broken and distortion of supporting rib, and aging of packer are not
allowed.
6、Sealing ring: First inspect it’s lip. The sealing ring should be replaced if there is
any damage, wear or aging.
7、 Shell:if the wear on the internal diameter or the external diameter of the sealing
matching part of the Shell is 0.5mm more than the tolerance, the housing shall be
repaired. For the wearing ring, if the external diameter wearing volume exceeds the
original deviation limit, the wearing ring shall be replaced.
8、Backing ring groove: the flange sealing backing ring groove shall be examined
to avoid defects that influence the sealing performance.

17
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

5.3 Replacement of packer


The packer is the key part that determines the shut-in effect of the annular BOP. Any
seriously-damaged packer cannot perform the shut-in effect. The seriously damaged
packer shall be replaced timely at the logistics base when possible.
Steps of replacing packer at well site:
1. If there is no drilling tool at the wellhead, disassemble the connector (jaw chuck)
between the bonnet and the shell, lift out the bonnet, mount the lifting ring screw on the
packer, lift out the old packer with rope, mount a new packer, mount the bonnet, and lock
the bonnet and the shell through the jaw chuck.
2. Perform pressure test again after replacement in order to examine the sealing
performance of the packer.
3. If there is drilling tool at the wellhead, cut the new rubber (Fig.5-1) with rubber
cutter (lubricate blade with soapy water under the assistance of crow bar), wherein the
cutting face shall be fat; when lift the bonnet, and lift the old packer with the rope, cut the
old packer, and mount a new cut packer for emergency.
Remove flash of the rubber of the assembled new packer, and coat molybdenum
disulfide lubricating grease in the part where the bonnet is contacted with the packer.

Fig.5-1 Replace packer when there is drilling tool

18
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

5.4 Detection of service life of Taper packer


The service life of the packer can be detected by measuring the travel of the piston.
The travel of the piston can be detected through the vertical piston travel detection
hole in the bonnet. The method for measuring the distance from the top surface of the
bonnet to the top surface of the piston and the maximum value and the minimum value of
the distance see Fig.5-2 and Table 5-1. The rest sealing travel value of the piston directly
shows the rest service life of the packer. The actual travel of the piston and the closing
pressure under the initial sealing shall be recorded during each daily testing of the BOP.
The previous record result and the maximum piston travel shall be compared to ensure
that the next sealing can be normal. Only the rest piston travel measured on the premise
that the packer is completely sealed is valid.

Fig.5-2 Measurement of piston travel

Table 5-1 Distance from top surface of bonnet to top surface of piston

Distance from top surface of bonnet to top surface of piston


Position of piston FHZ54-14Value FHZ53-21 Value
Maximum value (the piston is at the bottom) 384mm(15.12 in.) 426mm(16.77 in.)
Minimum value (the piston is on the top, and
84mm(3.31 in.) 126mm(4.96 in.)
the travel is done.)

19
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

5.5 Matters needing attention for assembly


The assembly is in sequence opposite to disassembly and needs attention on
the following points:

1. Examine whether there is burr or sharp corner in the part, if any, remove them, so
as to prevent the lip side of the sealing ring from being scratched. Please keep clean;
2. Slowly and steadily lift and assemble to prevent the parts from being blocked or
sealing ring from being damaged, as well as prevent foul from entering the sealing
surface;
3. Coat lubricating oil on surface of sealing ring when the sealing ring is assembled,
coat oil on the inner surface and the external surface of the matched sealing ring, in order
to assemble conveniently;
4. Pay attention to the direction of the lip-type sealing ring, and make sure that the
opening of the lip side faces the pressure direction.
5. Make sure that the sealing ring can pass through the oil hole smoothly without
scratching;
6. In case of clearance appearing between the bonnet and shell during mounting,
slowly press the bonnet through the internal hexagonal screw (Number 10) and bonnet
chuck (Number 12) until the clearance is completely removed, and then lock with the jaw
chuck. (Fig. 5-3)

Fig.5-3 Installation of bonnet

20
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

5.6 Daily maintenance


1. After use of each well, disassemble hydraulic pipeline that is connected with the
BOP, and block the hole opening with screwed plug; remove internal foul and external
foul of the BOP, check each sealing part and matching face, and coat waterproof grease
for lubricating and preventing rusting at the bolt hole, backing ring groove, piston
supporting face and other places.
2. Check all disassembled connecting parts like backing ring, bolt, nut and special
tool, and then store into the box to avoid losing.
3. Always examine the loosening condition of the screw in each place, and timely
tighten any loosened screw.
4. Keep the hydraulic oil clean, and prevent foul from entering the oil cylinder to
prevent the oil cylinder and piston from being pulled and damaged.
5. All rubber spare parts shall be reasonably stored according to the following
regulations:
a). Store according to the wareshell sequence and the number of old and new
levels, namely, old first and new second, in order to realize sequential use;
b). Store in dark and dry room under a slack state. It is prohibited to store in open
air. The rubber spare parts shall be avoided bending and extruding. It is
better to horizontally place into wooden box. O-shaped ring shall be not hung
on timber pile.
c). Do not contact with corrosive medium, and keep away from motor and
high-voltage electrical equipment, in order to prevent the rubber part from
being corroded by generated ozone.

5.7 Operating Period Maintenance


For the existing BOP, besides the onsite daily maintenance, it is recommended to
have periodical examination according to requirements of SY/T 6160 Examination and
Maintenance of BOP, for the purpose of confirming the repair items. The period of
examination is divided into three-month examination, one-year examination and
three-year examination. The examination shall be done on time and may be performed in
advance according to usage condition. If one well is continuously operated over the
specified examination period, the examination shall be done according to requirements of
the next examination period after going back to the warehouse. ▲! Caution: The
maintenance of BOP shall be subject to relevant local regulations about usage of
BOP, and the BOP shall be certified periodically by the bop original manufacturer
or a qualified third party, so as to make sure the stability and the reliability of usage
of BOP.

21
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1
The three-month examination content

1、 Disassemble the BOP, carry out a visual examination of the parts;

2、 Equipment shall be tested in accordance with API 16A.

One-year examination content:


1、 Check the bore of the bonnet, piston the shell. Measure the maximum bore
diameter and estimate the maximum wear on any side. If any radius is more than
3mm oversize, the parts shall be repaired.
2、 Check the wear ring and sealing rings, not allowed serious attrition and
deformation;
3、 Check the thread hole, cannot have disorderly buckle, the phenomenon such as
lack of buckle;
4、 Check the sealing face of the bonnet or the piston. Check the sealing grooves of
the shell ,piston and the bonnet . Make sure there is no defects affected sealing.
5、 Check the sealing grooves of the flange ,which should have no defects affected
sealing.
6、 Check the packers and seals. The sealing surface shall be avoided serious
deformation, wear, cracking, ageing of rubber core and phenomena the like;
7、 All rubber sealing parts, backing ring and O-ring that have been used over one
year or that have been damaged shall be replaced (see Table 3-2).
Three-year examination content:
1、 Disassemble all of the parts and clean up. In addition to examinations
according to the requirements of the one-year check, also should deal with
important size measurement of main parts. a) If the wear extent of inner
diameter of the bore of any side is more the 3mm, the parts should be
remanufactured; b) If the wear extent of the diameter of the sealing face is
more than 0.5mm, the parts shall be remanufactured; c) For parts with wear
rings, if the diameter of the wear ring is lower than the metal, the wear rings
shall be replace. d) Check the sealing face of the shell, bonnet and piston, if
there is any concaves, flaws or the parts is wearing seriously, the parts shall
be remanufactured
2、Hardness testing shall be carried out on the pressure-containing parts and the
pressure-controlling parts such as shell and bonnet. If the hardness is abnormal(>
HRC22), contacting manufacturer is necessary.
Repair and remanufacture parts shall be carried out according to API Spec 16A
appendix B. Replacement of parts shall be design and manufacturing by the OEM. After
checking the Bop, if the pressure-containing parts need to be welded to restore the
performance, the bop is not suitable for easy maintenance in the field, must be
remanufactured by the API Spec 16A qualified remanufacturer or authorized
remanufacturer.

22
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

6 Preservation procedures
Prior to shipping and storage, all equipment should avoid direct sunlight, rain and
snow shower, keep them away from acid and alkali, organic solution etc, which would
affect the quality of rubber material.

6.1 Storing for periods greater than 30 days


 All equipment shall be drained after testing and prior to storage;
 Prior to storage, parts and equipment shall have exposed metallic surfaces
protected with a rust preventative that does not become fluid and run at a
temperature of less than 50 °C (125 ℉) (Recommendation: Lithium base grease
3#) ;
 All connection faces and ring gasket grooves shall be protected with durable
covers during storage;
 The hydraulic operating system shall be flushed with a non-freezing,
corrosion-inhibiting fluid. Ports shall be plugged prior to storing
(Recommendation: Antiwear hydraulic oil 32#) .

6.2 Storage of Rubber Parts


All rubber parts shall be properly stored according to the following regulations:
 It is a must to store rubber parts in the indoor, low light and dry place with
temperature of 0-25ºC and relative humidity 50% ~ 85% and to keep them away
from the heating equipment and direct sunlight. It’s better to preserve them in the
original packaging or the packaging similar to the original packaging materials,
which has the function of shading.
 Keep rubber parts clean while in storage. Prevent them from being contaminated
by solvents, oil, grease or other semi-solid or liquid matters and from being
directly contacted with sulphur, manganese, copper, copper alloy (including
bronze), polyvinyl chloride (PVC), timber containing wood preservative oil and
other rubber products including different rubber constituents.
 Keep rubber parts away from ozone-generating equipment( e.g.: mercury vapor
lamp, high-voltage electrical equipment, electric motor or any electrical devices
which can generate electric arc; avoid being directly exposed under the sunlight
or the light (e.g.: the fluorescent lamp) containing plenty of ultraviolet.
 Store the rubber parts which are under the slack state and have no bending,
extrusion and hanging. It is not allowed to tie the tag on the rubber parts by the
string, metal wire or adhesive tape in order to prevent causing deformation to the
sealing surface.
 Check the rubber parts frequently. In the case that they have clamminess,
softening, hardening, aging, embrittlement, cracking, bending, flaw etc, it is not
 Generally, the storage period of rubber parts is 2 years.
23
Manual of FHZ54-14 and FHZ53-21 Annular BOP Rev.A1

7 Common Troubles and Troubleshooting


No. Trouble Cause Troubleshooting
 The old packer is seriously  Replace packer.
worn, separated by blocks or  Activate the packer at
The oil line is controlled aged. many times.
normally, the packer  The new packer is uneasy to be  Clean groove and
1 cannot be tightly sealed, tightly closed. other parts of packer,
and the well pressure  Foreign matter is deposited in and activate packer at
cannot be packed. the groove of the packer. fixed period.
 Oil slides in the piston sealing  Replace piston sealing
ring. ring.
 The packer is easily  Replace packer
permanently deformed and  Disassemble bonnet
aged after long-time closing. (piston) and then
Opening is failed after
2  The annular BOP is used for clean.
closing.
well cementing, and solidified
cement slurry is below the
packer.
 The pipeline oil line is  Smooth the pipeline.
The opening and unsmooth.  Repair the pipeline.
3
closing are inflexible.  Leakage occurs in pipeline oil
line.
 The corresponding sealing  Replace
Internal medium slides parts on bonnet or piston are corresponding
4
into the oil cylinder. damaged. damaged sealing
parts.
 The sealing surfaces of the oil  Replace sealing part at
Pressure cannot be
cylinder of the shell, the piston each part, and repair
stabilized in the
5 and the bonnet are damaged, the sealing surface.
hydraulic movement
and the sealing part is
part.
damaged.
The piston movement  The BOP of the control stand is  Rearrange the oil line
direction is inconsistent in inaccurate connection with pipeline of the BOP
6 with the mark on the the oil pipeline. body.
plate of the control
valve.

24
Design by:

(Technical engineer)

Audited by:

(Chief engineer)
26 Rev:A1