Once client/government accepts a tender, it is binding on both parties.

This means that the person


or company that won the tender has to provide the goods or services in the manner agreed to and at
the price offered, and client/government must pay the agreed price at the agreed time. In other
words, once accepted, a tender is a binding contract.
2.2 Types of tendering
When talk about tendering, it is involved some kind of complicated process and procedure. Before
any tendering process can be done, professional team and employer must make sure all necessary
tender documents have been prepared, checked and approved. The source of the funding also must
have been identified and the project financing put in place. The procedures for subsequent stages
should have been established with the express consent of the employer to ensure the tendering
process will go smoothly.
What types of tendering that employer want to choose is depends on nature of contract, complexity
of the construction, expertise needed and several reasons. But usually for the government project all
over the world, is tend to make open tender to ensure the procurement and works to be done in
fairly manner without prejudice. As the researcher mention before, open tender is one of the types
of tendering that commonly used in this world. Actually there are several types of tender including
open tender, selective tender, negotiated tender, serial tender and term tendering.
2.2.1 Open tender
Open tendering is the main tendering procedures employed by both the government and private
sector. The client advertises the tender offer in the local newspaper giving detail and key
information of the proposed works and inviting interested contractor to tender. In the legal sense
such tender notices constitute invitation to treat, a mere request by the employer for suitable
contractor to submit their bids or offers.
If the pre-requisite to tendering on the form of possession of the necessary registration has been
identified in the tender notice, then the advertisement is directed to only that particular class of the
public having the said qualifications. In order to reduce number of enquiries, earnest money is
deposited (for private project). Until the receipt of a bone fide tender selected then it will be
returned. Although price is very important in the decision on which tender or bid to accept, it is not
the only factor taken into account. Client does not bind to accept the lowest or any offer. The
advantages and disadvantages of open tender are stated below:
Advantages
Disadvantages
It allows any interested contractor to tender. Therefore it gives opportunity for an unknown
contractor to compete for the work.
The tender list can be long as too many contractors tendering for one job.
Allowing the tender list to be made without bias. Client will obtain the bargain possible. No
favouritism in selecting contractors.
Uneconomic use of source.
Ensuring good competition not obliged to accept any offers.
Public accountability may be questioned if the lowest offer is not accepted.
Traditional method of tendering, familiar to all sector of the engineering and construction industry.
Does not attract reputable and established contractor unless they are forced to, due to lack of work.
Selective tender
Selective tendering is the one alternatives developed to address the limitations of the open
tendering procedure. In this method, a short list of contractor is drawn up and they are invited to
submit tenders. The purpose of the elective tendering are to improve the quality of the bids
received, to ensure that contractors with the necessary experience and competence are given the
opportunity to submit the necessary bids, due to urgency work involved, for specific reasons of the
employer, eg security reasons in government projects. etc. and to make the tendering procedure
more manageable and less a burden on the parties involved. Such list may be prepared through
recommendation from the Client’s professional adviser whom have knowledge of the Contractors
undertaking the work in the past or advertisement through the newspaper (prequalification). The
advantages and disadvantages of the selective tendering are stated below.
Advantages
Disadvantages
Only the competent contactors were invited to tender, then the lowest can be accepted.
Reduces the availability of work for other contractors’ especially new contractors.
It reduced the cost of tendering (economic use of resources, reduced tender documentation, shorter
tender periods, better management of the tender process, etc.)
Tender Price may invariably higher than would have been in open tendering.
Greater chance of collusion.
Tendering period longer because it involved two distinct stages.
Favouritisms may occur in the short listing.
Two Stage Selective Tender
Two stage selective tendering combined elements of competition and negotiation into a formula
where the employer could utilize the contractor’s expertise at an early stage of the project cycle so
as to maximize innovation, ingenuity and quality and simultaneously optimize cost, time and
resource input. A contractor is selected competitively early in the design process. The tender
documents contain approximately quantities of the major value items. As design and planning
proceed, the final tender is developed from cost and priced data supplied with the initial tender.
Two stage selective tendering was very popular in developed countries. It was different from
selective tendering because has two (2) distinct stages namely:
Selection of suitable contractor
This involves the selection of a suitable contractor and the establishment of a level of pricing for
subsequent negotiations.
The objective is to select suitable contractor as early as possible is to work together with the
professional team and to establish a level of pricing for subsequent negotiation.
The criteria for short listing is normally confined to items such as technical and financial capability,
experience in similar works and extent of resources (manpower, plant and equipment).
The pricing document should be flexible enough to cater for adjustment of price fluctuation for the
period between two stages and the pricing of the second stage.
In selecting a suitable candidate, a basis for pricing the subsequent second stage should be
established accordingly.
Determination of Contract Price
Once a suitable contractor is selected, he will work together with the project team start contributing
to the pre contract process in his capacity as unbiased but independent construction expert. This
contractor will contribute the following:
Contribution as a Technical Advisor to the Design Process
Practical Skills and Buildability
Minimization of Project Delay
During this stage, a negotiation to reach an agreement on the final contract price is undertaken and
the pre contract process is perfected.
If no agreement being reached, the employer has an option to abandon the tendering exercise and
re-tender the works using any other tendering procedure.
The application of two stage selective tendering might be appropriate where the works are a very
complicated nature, where at the time of selection of the contractor, the magnitude of the work
may not be known with sufficient certainty and where it is an essential pre-requisite for works to be
finished by an early completion date. Table below are some advantages and disadvantage of two
stages selective tendering.
Advantages
Disadvantages
Benefit of the contractor’s expertise in buildability, specialist knowledge in proprietry systems,
project scheduling, etc resulting in value for money.
Its application requires a high level of familiarity and commitment on the part of employers and
contractors.
Early commencement of work at site even when the magnitude of the works is not known with
sufficient certainty at the time of site possession.
Owing to a relatively smaller element of competition, but on the other hand higher negotiations
content, the tender process is relatively more expensive and longer than other common procedures.
Savings of time due to the overlap of the design and tendering stage.
Should the second stage be deadlocked or result in no acceptable agreement being reached, the
tender process has to be initiated all over again, albeit, through a different route. This incurs a time
and cost penalty to the project as a whole.
The procedure utilizes the best aspects of both competition and negotiation to arrive at the most
favourable arrangement at an optimum firm price before work commences.
This procedures requires a high level of commitment, integrity and good faith on the part of both
sides which sadly is usually lacking, hence the apparent failures encountered to date.
Since the contractor is part of the project team at a very stage of the project, this results in better
communication and information flow.
Generally there will be fewer claims and disputes in the post contract award stage due to the
contractor’s involvement at the design / pre contract stage. Experience has shows that the
contractor has a clearer understanding of the requirements and a better appreciation of the
intricacies of the design and contract documentations.
Negotiation Tender
Negotiation tendering is extensively used in the engineering and construction industry commencing
from tendering till dispute resolutions, i.e. under the styles of pre-contract negotiations and post
contract negotiations. Usually with single contractor but may be up to three contractors. Negotiation
process involves are as follows:
Identification by the employer of a suitable contractor to negotiate with. The contractor can be
selected either from the employer’s own list of preferences or on the advice of the professional
team.
The contractor being apprised of the workscope.
The selected contractor is issued with details such as the scope of work involved, relevant drawings,
design and /or information to enable him to appreciate the extents of obligations and the
employer’s actual needs. Some employers prepare and issue to the contractor proper tender
documents inclusive of a nominated bills of quantities to assist contractor in pricing the works for
the forthcoming negotiations. Negotiations can be applied to the following type of contract:
In Partnering type of contracts under the so called win-win formula.
Where the employer has a long term business relationship with the contractor.
In situations where the parties are in a relationships of holding and subsidiary companies.
Where the contractor is involved in the financing of the project.
In situations where the employer finds it advantages to employ the same contractor to continue an
initial or existing contract for the new works
Where there is a pressing need to have a very early start of work on the site and to complete the
works on a fast tract basis.
In special circumstances e.g. Security reasons, emergencies etc where it is expedient to secure the
services of a particular contractor only.
Where there is only a single contractor who is the only one available or with ether the special skill or
resources to carry out the particular works.
The employer’s resources are either limited or constrained thereby making the use of the other
tendering impractical.
Only Advantages
Disadvantages
Reputable contractor are invited for negotiation.
The cost work is likely higher than competitive tender.
The Contractor can contribute his expertise during design stage.
Reduces the availability of work for other contractors.
Early Commencement of work on site. It shortens the period involved in appointing the contractor.
Should the negotiations be deadlock or prove eventually unsuccessful, this causes wastage of
valuable resources on both sides and loss of time for the employer, thereby delaying the overall
selection of suitable contractor.
Reduce risk of failure
Best alternatives for the employer to adopt is special circumstances such as emergencies, security
reasons and etc.
Experience has shows that contracts let out this basis result in fewer disputes and claims during the
construction stage.
Term Tender
Term tendering normally used on major maintenance projects. It may be awarded to a contractor to
cover a range of different buildings in different locations. It is often limited to a fixed time scale,
although the needs of the client may often require this to be extended. It is like a standing offer to
undertake a loosely defined extends of work usually within a fixed time period. The type of work is
usually specified and priced in a schedule of rates. The contractor will initially be offered the work to
cover a number of different trades usually on the basis of prices contained in a schedule prepared by
the client.Where the client supplies the rates for the work, the contractors are given the option of
quoting a percentage addition or deduction from these rates depending upon their desire to win the
project. The contractor offering the most advantageous percentage to the client will then be
awarded the contract. An indication of the amount of work expected over the specified period of
time will assist the contractors in the consideration of the percentage to be quoted.
2.3 Conventional Tendering Process
As the researcher mentioned before, this chapter will focus on conventional tender while the next
chapter will focus on electronic tendering. Therefore readers will see clearly background on
conventional tendering and electronic tendering. Conventional tendering process will involve pre-
tender stage, tender advertisement stage, closing of tender, tender opening process, tender
evaluation process and finally tender award.
2.3.1 Pre-tender Stage
At pre-tender stage, when the clients have an idea, client will appoint consultant to discuss further
about the project. Consultant will do their job, advising, managing the tender and contract, and also
transfer the idea into the drawing. At this stage client and consultants will brainstorming about the
scope, time to complete and budget that client willing to allocate. Researcher believes that pre-
tender stage is most crucial matter because it will initiate the next step of a project. If the pre-tender
stage is failed, the project will not successfully complete.
2.3.2 Tender Advertisement
Tender advertisement also called tender notice. The conventional tender notice will advertise in
local newspaper. In tender notice, basic requirement should be appearing are:
Title of the project.
Class of contractor, head and subhead needed.
Location, date, and time to obtain the tender document.
Fees for tender document.
Location, date and time for submission of tender doc.
2.3.3 Closing of Tender
In tender notice will mention the time and date of tender closing process. If the contractors fail to
submit their bids within specific time and date, it considers the contractors refuse to bid for the
tender. At that time also tender validity period is started. At this period, contractors can withdraw
back their bids if they are no more interested to fight for the tender. Consultant use this period to
make assessment and evaluation each of the offers.
2.3.4 Tender Opening and Evaluation Process
Quantity surveyors usually will handle tender opening process. In order to preserve the integrity of
the competitive process, it is imperative that the evaluation of proposals is undertaken objectively,
consistently and without bias towards particular suppliers.  Tenders are usually evaluated against a
pre-determined set of criteria. The evaluation of the tenders shall be prepared the soonest possible
after the tender opening. A report prepared by the Quantity Surveyor will describe the findings of
the said evaluation and it will be supported by tables and graphs. In the end, the Quantity Surveyor
will recommend which tenderer, who in his opinion, is the most suitable to undertake to execute the
project.
2.3.5 Tender Award
An evaluation team will examine each tender received and make recommendations as to which
tender represents best value for money.  Once the contract has been awarded, both the successful
and unsuccessful tenderers will be notified. Once the final decision has been made on the tender
award, the tender administrator creates the tender results notification which is in letter form, and
then sent to all participating contractors.