Professional Documents
Culture Documents
Dear Sir,
RATES FOR NEW SPARE PARTS AND HYDRAULIC TESTING/PAINTING OF FIRE EXTINGUISHERS: (E)
Complete Squeeze Grip valve /Cap Assembly for Stored Pressure As per relevant BIS
13
type Fire Extinguisher [Water CO2 9 Ltr/ABC 6Kg] specifications
14 Complete Squeeze Grip valve /Cap Assembly for Cartridge type Fire
Extinguisher [Water CO2 9 Ltr/ABC 6Kg]
Discharge horn ( non-conductor of electricity ) with Rubber Grip for
15
3/4.5/22.5 Kg CO2 extinguisher
Braided High Pressure Hose pipe with discharge horn for 4.5/6.5kg
16 (Hose shall be tested minimum bursting pressure of 275kg/cm2 )- 1
mtrs
Braided High Pressure Hose with discharge horn for 22.5kg (Hose shall
17
be tested minimum bursting pressure of 275kg/cm2 ) - 5 mtrs
In respect of
19 Trolley for CO2 22.5 Kg Fire Extinguishers any Brand
Minimax/
Replacement charge of new CO2 Gas cartridge of 60/120/200 gms. Kanex/Lifeguard/
20 Capacity as per IS: 4947 with ISI mark with empty cartridge during Safex/Exflame only
refilling.
Total (E ) : Rs.
In words: Rs
In Letters:
Grand total of Indicative Price Bid (F) = Rs. ( D+E)
In words: Rs
In Letters:
I. It is mandatory for all the vendors to quote the rates for each item. If the vendors do not quote the rate of any item, it
will be treated that the vendor will execute that item as free of cost.
II. The rates quoted shall be inclusive of labour, transportation, octroi, entry tax, toll tax or any local tax/ levy etc. and
excluding of prevailed GST.
III. Servicing/ Maintenance charges shall be inclusive of all minor spare part like rubber washers, safety pin, safety clip,
wall bracket, handle etc.
IV. All the rates will be applicable throughout the Lucknow Circles in all the establishment of State Bank of India and
also corporate Centre Establishment/SAMB/SARB/ BPR Outfits etc. Operated in Geographical Area of Luckonw
Circle.
V. The Bank has its discretion to reject/cancel the empanelment process as a whole or part of it at any time.
VI. Periodicity of Refilling will as per BIS: 2190:2010, although Bank has its own discretion to set the periodicity of
refilling as required by the Bank for training and demonstration purpose to the staff.