ORDER CONFORMATION

Our Ref- IC/OC/KSPC/2023


Date: 27/02/2023

Kind attn Mr. Apoorv raj


M/S K.S PULP CREATOR
Hardoi
Mobile - 9721258439
Email - csr7576@gmail.com , kspulpcreator@gmail.com

ORDER CONFIRMATION FOR YOUR ACCEPTANCE


HIGH EFFICIENCY DESIGN
BUBBLING BED SOLID FUEL FIRED THERMAL FLUID HEATER

Dear Sir,

As discussed we are pleased to forward to you this order confirmation letter for your acceptance. As a token of
acceptance of this order acceptance please sign & return one copy of the same. Also put short initial at end of
each page.
It will be assumed as accepted if the same is not return within three days.

ISOTEX SOLID FUEL, SOLID FUEL FIRED THERMIC FLUID HEATER

Qty Max Max Heat


MODEL Outlet Capacity Fuel Efficiency
Oil Temp.
ECOTHERM n˚ °C Kcal/hr %
VX-BF-1000 01 280 10,00,000 Rice husk
80 ± 2

Note: See detailed offer for Scope of supply and inclusions in net price
This document supersedes all previous communications.
We remain at your full disposal for any further request and we send you our best regards
For, ISOTEX CORPORATION PVT LTD

2
SCOPE OF SUPPLY

ECOTHERM – VX-BF SERIES


SOLID FUEL FIRED THERMAL FLUID HEATER
Sr. SUPPLY OF EQUIPMENT DESCRIPTION QTY SCOPE
No (ISOTEX/CLIENT)
HEATER ASSEMBLY
UNIQUE concentric COILS DESIGN assembly, forming Three flue
Pass heat exchanger made from best Quality heavy thickness
01 boiler tubes, suitable for high temperature operation
1 ISOTEX
One soot blower arrangement fitted in top of heat exchanger for
online cleaning
 Heat Exchanger
 Coil – MOC: BS 3059 ERW
 Shell MOC – IS 2062
FURNACE
(CYCLONIC COMBUSTION CHAMBER FOR HIGH COMBUSTION
EFFICIENCY)
The furnace is constructed from Heavy duty M.S. Sections and
02 covered with M S sheets.
Furnace will be provided with necessary openings and nozzles for 1 ISOTEX
combustion air. It offers ample provision for combustion of
volatiles within the combustion zone. Adequate number fire
doors & ash doors are provided for ash removal. The brick wall
design is engineered for very minimal heat loss & long life of
bricks.
COMBUSTION SYSTEM – BUBBLING BED
03 Plenum chamber with distributor plate complete with bubbling
1 ISOTEX
air nozzles and air supply
Opening for uniform bubbling of fuel materials.
04 Screw feeder for fuel feeding with VFD
1 ISOTEX
AIR PREHEATER (APH)
Multi pass counter current flow shell and tube type self cleaning
05 design air pre heater to pre heat the air for combustion by
drawing heat from flue gasses for optimum efficiency of Thermic
Fluid Heater. 1 ISOTEX
 Tube MOC: IS 1239
 Jacket MOC: IS 2062

3
TREXMA CYCLONE DUST COLLECTOR (DC)
cyclone Dust Collector made out of Chilled Cast Iron Cone to
06 Reduce the Fly Ash Emission. 1 ISOTEX

 DC for < 450 mg/Nm3 outlet dust concentration


THERMAL FLUID CIRCULATING PUMP
Air Cooled With Zero Leakage Mechanical Seal
High temperature Thermic fluid circulating pump with Air cooled
1 ISOTEX
07 Mechanical seal, suitable for high temp operation, directly
coupled with an electric motor mounted on a common base
frame with back pull out coupling.
Non-Compartmentalized Power Cum Control Relay based
control panel
Free standing type, conforming to IP 42 degree of protection.
The panel shall be made out of 14/16 SWG CRCA sheets. The
required power switchgear for all drives shall be housed in the
08 power section
1 ISOTEX
Feeders For all drive.
All the feeders for the heater shall be included panel only to hook
up 3 phase supply at the incomer of this power panel.
Safety Trip for the heater;
Audio visual alarm for the individual safety trip;
VFD shall be incorporated in MCC.
EXPANSION TANK
The Thermic oil expands at the rate of 7% for every 100°C rise in
the temperature.
To compensate this, a specially designed Expansion tank of
09 suitable size will be provided. 1 ISOTEX

 Tank MOC: IS 2062


 Level gauge 1 no.
 Level Switch 1 no.
10 Deaerator for suitable Heater flow
One Deaerator vessel is provided, which keeps system free from
gases 1 ISOTEX

 Tank MOC: IS 2062 Gr B


Induced Draft (ID) Fan Assembly
ID FAN assembly complete with pulleys, driving belt. Damper,
safety guard chaired on base frame
1 ISOTEX
11  ID fan; belt driven with motor base frame, motor;
 Impeller MOC: IS 2062;
 Fan MOC: IS 2062 Gr. A/B
4
Forced Draft (FD) Fan Assembly
 FD fan direct coupled with motor;
1 ISOTEX
12  Impeller MOC: IS 2062;
 Fan MOC: IS 2062 Gr. A/B
13 Insulation
 Thermal oil heater – 100 mm thk
 APH 1 ISOTEX
 Insulation material :- Rock Wool, Density 100-120 kg/m3
along with GI cladding
14 Refractory
1 ISOTEX
Refractory for furnace
Combustion Air Ducting
15  FD fan outlet to APH inlet 1 ISOTEX
 APH outlet to Furnace Inlet
Fuel Gas Ducting
16  Heater Outlet to APH Inlet
 APH outlet to DC inlet 1 ISOTEX
 DC outlet to bag filter inlet
 Bag filter outlet to ID fan inlet
17 ID fan suitable for bag filter with VFD 1 ISOTEX
18 Diesel Engine 6.5 hp 1 ISOTEX
19 Top up Pump 1 ISOTEX

5
INSTRUMENT CONTROL AND SAFETIES OF HEATER

01 One pressure indicator for circulating pump pressure.


02 One pressure indicator for circuit pressure measurement.
03 One Gauge glass assembly on expansion cum de aerator tank.
04 One digital temperature indicator cum controller for thermic fluid forward temperature.
05 One digital temperature indicator cum controller for thermic fluid returns temperature.
06 One Audiovisual alarm for abnormal operating conditions.
07 One Low-level alarm switches on expansion tank.
One differential pressure switch for protection against low/ no flow conditions
08 connected across inlet and outlet heaters.
09 One digital temperature indicator cum controller for Stack

SCOPE OF DOCUMENTATION & ENGINEERING

Sr. No. Drawing / Documents Reference (Electronic Copy)


1. Civil Foundation loading drawing
2. Piping & Instrumentation Diagram
3. General Arrangement Drawing
4. Operation & Maintenance Manual including the Operation & Maintenance manuals for the
individual components / instruments in the package.

6
ISOTEX BATTERY LIMITS – AS PER STD SCOPE

Thermic Fluid Line Intel & Outlet of Main Thermic Fluid Circulating Pump
Inlet & Outlet headers of Heaters
Intel & Outlet connections of Expansion tank

Fuel and Ash Fuel feeder


Ash removal door
Outlet of ash collectors on heaters.
Air & Flue gas ID Fan Suction and Discharge Flange
Outlet of Dust collector
Electricals Terminal Connections on control panels, all Motors, Instruments and
Controller etc.

EXCLUSIONS

THIS OFFER EXCLUDES THE FOLLOWING FROM OUR SCOPE OF SUPPLY AND WORK
01 All civil/structural work and foundation bolt for installing the system.
02 All Insulation wherever required except main heater.
03 Fuel handling system
04 All Thermic Fluid piping and drain piping with relevant valves.
05 Thermal oil drain tank
06 All interconnecting cable, cable tray, cable supports
07 Main chimney, Ducting from ID fan to chimney If bag filter is in ISOTEX Scope else ducting
up to MDC
08 Expansion tank structure.
Labor, tools and tackles, utilities (water, power, air etc.) and consumables required for
09
Assembling, Erection of thermic fluid heater.
10 Spares for Installation, Operation and Maintenance of heater.
Fuel, diesel, lubricants, water, instruments and accessories for commissioning operation
11
and performance testing.
12 Any other items not specifically mentioned in our offer.

7
TECHNICAL SPECIFICATION

GENERAL

Model VX-BF-1000

Heater Capacity Kcal/hr 10,00,000

Type 3 – pass Vertical

Fuel Rice husk

Fuel Size Less than 10 mm < 10%


0-1 mm < 10%
Combustor Bubbling bed

Mode of Fuel Feeding Auto

Ash collection Manual

PERFORMANCE, DESIGN AND OPERATING PARAMETERS

Heat output Kcal/hr 10,00,000

Max TF outlet temperature Deg C 280

TF flow rate M3/hr 65

TF temperature difference Deg C 32

Pressure at heater outlet Kg/cm2 2

Coil Design pressure / Temp Kg/cm2 / Deg C 7/340

Flue gas outlet temp (Stack) Deg C <220

Outlet Dust emission Mg/nm3 450

Efficiency @NCV % +/- 2 80 on imported coal


BS 845 Pt-I indirect

8
HEATER / ACCESSORIES SPECIFICATION

Heater Coil MOC BS: 3059 Part-I ERW 320

Type of coil construction 3 Helical Concentric Coil + roof coil

Coil volumetric capacity Ltr 1000

Expansion tank capacity Ltr 1500

UTILITY CONSUMPTION

Connected Electrical load kw 41.3

Fuel consumption Kg/hr Rice husk - 380

Compress air / Nitrogen TBC

9
SITE CONDITIONS AND PERFORMANCE CRITERIA

Ambient temp Deg C 30

Electrical power supply 415 V + 10%, 3 phase, 4 wire AC supply


230 V + 10%, 1 phase, 2 wire AC supply
50 Hz frequency + 3%
Thermal fluid: Specific gravity between 0.65 -0.75
No insoluble in thermal fluid
Max. bulk temperature 305 deg C
Flash point above 190°C
Fuel Fuel Specs
Fuel Size
Efficiency As per BS 845 Part-I, indirect method

THERMAL FLUID: (RECOMMENDED THERMINOL 55)


 Specific gravity between 0.65 -0.75
 No insoluble in thermal fluid
 Max. bulk temperature 305 deg C
 Flash point above 190°C

The output and performance specified in this offer shall hold well only if input meets the specification and
guideline given in the Offer and/or O&M manual.

THERMAL EFFICIENCY IS GUARANTEED ON THE TEST BED AS PER STANDARD BS-845 PART I UNDER
NORMAL OPERATING CONDITIONS & CLEAN INTERNAL & EXTERNAL HEAT TRANSFER SURFACE.
Fuel Specification
Rice Husk
Carbon 36.7
Hydrogen 3
Nitrogen 0.4
Sulphur 0.08
Moisture 10
Ash 18.5
Oxygen 31.2
Net Calaorific Value (NCV) kcal/kg 3300

10
COMMERCIAL OFFER

DESCRIPTION Qty VX-BF-1000 Unit price –


EX-Works
Price for VX-BF heater
Thermic heat-exchanger assembly
Cyclonic circular Furnace,
Air –preheater 01
ID-fan Suitable for DC, FD fan
De aerator cum Expansion tank,
Control panel
Price for Screw feeder for fuel feeding along with VFD 01
Price for TREXMA cyclone dust collector with RAV 01 Rs. 22,50,000/-
Price for Refractory for furnace 01
Price for Insulation of heater & APH Supply and lining 01
Price for Thermic fluid circulating pump with Motor. 01
Price for air/flue gas ducting up to ID fan 01
Price for ID fan suitable for bag filter with VFD 01
Price for Diesel Engine 6.5 HP 01

11
COMMERCIALS TERMS & CONDITIONS
PRICE BASIS: EX-Works
The prices mentioned above are Ex-Works , Ahmedabad/Dahej/Vendor workshop and
are exclusive of the following charges: GST, transit insurance and freight from our
works to site. The above-mentioned taxes and levies shall be charged at the rate
prevailing at the time of dispatch.
HSN CODE: 8402 1990
FREIGHT - INSURANCE – OCTROI: By Client
TAX (GST): Extra as applicable. (18% on Total value)
TCS TAX: Extra as applicable (0.01% on Total value)
PACKING & FORWARDING: Packing and forwarding will be done in accordance with manufacturer’s standard
practice. Any special requirement desired by purchaser will be charged additionally.
PAYMENT TERMS: 40% advance along with LOI/P.O.
Balance with applicable taxes and duties against Performa invoice before delivery.
We shall send Performa invoice inclusive of all taxes and incidental charges, around the
time the ordered materials are made ready for delivery in full or part.

SUPERVISION OF ERECTION & Charges - 7500 per man Day


COMMISSIONING CHARGES:
Nos. of Days/Visits Required/Considered
For Pre-Commissioning – 1 days
For erection – 2 days
For commissioning/ handover- 3 days

Client scope
st
TO& FRO 1 class Fares
Boarding & lodging facilities
Local Conveyance
(NOTE : Please refer SITE SUPERVISION POLICY for terms and conditions
DELIVERY PERIOD: The equipment shall be ready for delivery at our works in 6 months from the date of
confirmed order with advance. This delivery period will be counted from the date of
receipt of Advance and fully confirmed technically/commercially formal order/approval
of drawings if any, whichever is later.

Delivery schedule is subject to milestone-based payment obligation fulfilled by


customer, any delay in payments shall affect the delivery schedule accordingly.

VALIDITY OF THIS DOCUMENT: This proposal is valid for period of 2 weeks from date of issue.

12
ISOTEX STANDARD TERMS AND CONDITIONS

WARRANTY FOR EQUIPMENT

The boiler is warranted against malfunction arising out of faulty design, material and/or workmanship for a period of 12 months from
the date of commissioning or 15 months from the date of Invoice, whichever is earlier. This clause will be applicable if the purchaser
strictly adheres to and follows manufacturer’s recommendations on feed water, fuel quality, thermic oil, power supply, etc.Malfunction
arising out of mishandling, misuse etc. are not covered under Warranty.

ISOTEX’s liability in respect of any defect in or failure of equipment supplied by ISOTEX or any loss, injury or damage attributable
thereto, is limited to making good by replacement or repairs, defects, which appear therein, provided the equipment is operated and
maintained in accordance with ISOTEX’s instructions, and arise totally from proved fault in design, materials or workmanship, within a
period of 12 months from the date of commissioning of the equipment or 15 months from the date of invoice dispatch, whichever is
earlier, at the end of which period, all liability on ISOTEX’s part will cease.

Any replacements/repairs required under provisions of the above warranty will be carried out at ISOTEX’s option either at site or at
ISOTEX’s works. In the latter case, Buyer will send the defective parts to ISOTEX works at Buyer’s cost & liability.

The decision on manufacturing defects will be taken by Isotex based on site evaluation, etc. will be final and binding on purchaser.

Warranty Excludes
A. Normal Wear & Tear of rotating parts.
B. Damages/defects due to wrong operation at the purchaser’s end, and/or arising out of force majeure.
C. Bought out components are guaranteed only to the extent of guarantees given to by the respective manufacturers/suppliers.
D. Rubber components and instruments such as pressure gauges,TIC, pressure switch etc. are however, not covered under this
warranty.
E. Damage due to power fluctuation: motors, electric heaters, VFD, panel switch gears, panel instruments/controllers, etc.

This warranty is valid subject to the following conditions:


a. Installation completed within three months from the date of dispatch of the equipment and as per our installation instructions.
b. The supply/installation formally accepted as per the handing over clause of this offer.
c. Use of right fuel as per specification mentioned in our offer.
d. The equipment being operated and maintained as per our Operation and Maintenance Manual.
e. The equipment or part thereof not being subject to accident, alteration, abuse, or misuse.
f. Any replacements/repairs required under provisions of the above warranty will be carried out at as perour option of either at
site or at works. In the latter case, Buyer will send the defective parts to our works at Buyer’s cost & liability.
g. Warranty period for the entire equipment including replaced or repaired parts will be limited to the unexpired portion of the
total warranty period.
h. Warranty of Thermic fluid pump, Boiler feed pump, other pumps shall be as per supplier warranty norms.
i. Accessories and brought-outs not manufactured by us, form an integral part of the equipment supplied, the warranty for such
accessories &brought-outs will be co-terminus with the main equipment.
j. If the purchaser delays lifting of the equipment on its readiness, the warranty will be limited to 18 months from the date of
intimation ofreadiness at our works.
k. Any repair/replacement on our equipment during the warranty period shall be carried out by or authorized
representatives/company in writing from us.
l. The warranty obligations will be honored by us provided Buyer has fulfilled obligations under the order relating to release of
due payments, etc.

13
1. ORDER CONFIRMATION:
All Orders placed on us directly or through our regional offices will be binding on us only after our Head Office in Ahmedabad
has issued on order confirmation.

2. PRICES:
All prices are ex-works Naroda, Ahmedabad/Dahej/Ex-Vendor Works for the part of the goods to be manufactured at their
works and are exclusive of transit insurance, all taxes and other duties and levies as applicable at the time of dispatch, which
shall be charged separately. Freight, State Penalties for ODC Cargo, Octroi, Entry Tax,if any, shall be borne by the purchaser,
The Purchasers registered under the GST Act (Goods and Service Tax Act) are advised to send their GST registration number
along with the Purchase Order.

3. MODE OF DELIVERY:
All deliveries will be Ex-Works, Naroda, Ahmedabad/Dahej/Ex our supplier’s work. The goods may be dispatched in one or
separate lots at our option. If we are required to dispatch the goods on behalf of the purchaser, we can arrange to do so by
road transport only to a destination named by the purchaser, on freight to pay basis, on the understanding that no liability is
attached to us. The freight charges contracted by us on behalf of the purchaser will be treated as negotiated under the
purchaser’s authority and shall therefore, be final.

4. INSPECTION:
Inspection (if applicable) should be mentioned at time of ordering/PO. the goods will be offered for Final visual inspection
before packing at our works/our supplier’s works. The date of inspection will be intimated by us about 15 days in advance. If
inspection is not carried on the date so advised, we shall be free to dispatch the consignment as per the terms of delivery.

5. PACKING AND FORWARDING:


Packing wherever necessary will be done by us in accordance with our standard practice.

6. SPECIFICATIONS, ETC.:
Basic Specification, dimensions, designs, descriptions, shades of paints etc. are not binding on us in minute details and are
subject to reasonable alterations without notice.

In case of changes in technical specifications, ratings and/or un-availability of mentioned makes, the supplier reserves the right
to propose and use alternates. This shall be done no less than 15 days before dispatch.

7. VARIATION OR ADDITION IN SCOPE OF SUPPLY:


The scope of supply is restricted to as specified in our offer. Any subsequent addition or alteration will be acceptable to us
provided, it is convenient to do so and the change in price and delivery period is mutually agreed upon. Unless such revision is
authorised from the buyer within 15 days of our intimation, we shall be at liberty to suspend further work and recommence it
only after fresh negotiation on prices and delivery period.

8. WAREHOUSING CLAUSE:
If payment is not made within 15 days from the date of proforma invoice, we reserve the right to divert the ordered material.
We will give a fresh delivery period and price at the time of diversion, which will be binding on the purchaser and the contract
cannot be rendered void on this account. If the goods cannot be diverted, charges will be applicable for storage, insurance, and
interest at the rate of 1% of the invoice value for each week to a maximum of 5% commencing 15 days from the date of
proforma invoice.

9. ADVANCES:
Advances paid against an order shall not be subject to any interest. We shall have the right to adjust against such advances
against payments which might become due because of delay in lifting the ordered equipment or because of any incidental
expenses, we may incur on the purchaser’s behalf. The advances shall be forfeited in case request for cancellation of order is
accepted by us.

14
10. DELAYS IN PAYMENT:
If Any delay in receipt of payment beyond the due dates, will entitle us to suspend further work under the order without any
liability for delay in delivery and/or completion and to receive interest on the outstanding amount for the period of delay at a
rate higher by two percent than the bank lending rate prevailing at that time.

11. CHANGES IN LAW:


During execution of order If there is any change in scope nature of work/location due to change in Government rules or
regulation, an adjustment in purchase order terms including but not limited to prices, deliveries etc shall be mutually agreed.
We are not obliged to proceed with thechanges until we receive amendment to purchase orders incorporating necessary
changes.

12. BOUGHT OUT ITEMS:


The purchaser shall indemnify the manufacturer for any delay arising from delay in supply of specific make of sub-delivery
insisted upon the purchaser where the manufacturer has no control over the delivery of that sub-delivery.

13. COMMISSIONING:
Commissioning service offered at the rate and terms mentioned in the quotation cover reasonable number of visit/ meetings
to
 Help in preparing the user to safely unload the material, when received.
 Discuss installation details in terms of physical/technical requirements.
 Make the user conversant with statutory requirements, if any.
 Discuss details of requirements in respect of power supply, feed system, fuel system etc.
 Ensure that the installation has finally been made as recommended.
 Commission the unit for a short run from the point of view of mechanical working and controls set as necessary.
 Conduct demonstration for the purpose of user’s education for the equipment operation and maintenance.

14. HANDING OVER OF THE BOILER


The purchaser/user is expected to put the equipment to commercial use only after issuing a formal completion certificate or by
signing the commissioning/handing over report of our commissioning engineer. Our responsibility in terms of warrantee shall
cease straightway if the equipment is used without formal taking over.

a) The material has been supplied as per the terms of scope of supply or with agreed deviations, if any.
b) Erection if involved has been completed generally as per the terms of order or with unavoidable deviations.
c) The equipment has been commissioned, if applicable, generally as agreed or the equipment and/or Installation has been
put to commercial use either with or without the help of our engineer. The purchaser/user is expected to commenceusage
of the equipment for commercial purpose only after issuing a formal completion certificate.

15. PERFORMANCE OF EQUIPMENT:


This equipment supplied is a tried tested equipment and performance trials of the same have been carried out multiple sites,
and Performance Parameters as well as results established and standardized.
The equipment being supplied to you is of the same Standardized Design & Proven Performance. Thus, no performance
trials/demonstration runs shall be provided by the supplier at site.
Performance demonstration at site, if required, shall be done on chargeable basis, applying the relevant code of measurement,
by the manufacturer with suitable tolerance for fuel, air, water, temperature based upon actual site conditions.

16. BOILER REGISTRATION (APPLICABLE FOR IBR BOILER ONLY):


The boiler is manufactured as per Indian Boiler Regulations with latest amendments/ISO. One set of relevant documents and
certificates signed by the Director of Boiler, Gujarat will be forwarded to the customer. The purchaser at his cost shall
complete subsequent formalities for registration of the boiler with boiler inspectorate of the state concerned.

15
17. GENERAL LIEN:
We shall be entitled to general lien on goods in our possession or dispatched for all money due to us from the purchaser, both
under this contract or any other account, and we shall also be entitled to apply any money in our hands under any contract
due to us under any other contract or contracts.

18. EXCESS MATERIALS:


The excess materials send to site along with components for contingency and safe transportation purpose will be used up to
the maximum extent possible and excess material shall be taken back by Isotex.

19. WRONG SUPPLY OF MATERIALS:


In case of wrong supply of any material, we shall replace the wrong one andcollect back theexcess material from site.

20. FORCE MAJEURE:


The offer is subject to force majeure by which it means, causes such as war, invasion, civil disobedience, government orders or
restriction, strikes, lock outs, riots, fires, epidemics, sabotage, earthquakes, floods, accidents, break-down of machinery,
delayor inability to obtain labor, raw materials, wagons, shipping space or any other causes whatsoever beyond our reasonable
control, affecting us or our sub-contractors, suppliers etc.

21. CONSEQUENTIAL DAMAGES:


Neither party shall at any time be liable to the other for any loss of profits or any similar indirectdamages, howsoever
described, incurred, or suffered by either party in respect of the project.

22. CANCELLATION:
Order received and acknowledged shall not be cancelled without the written consent of the manufacturer. The advance paid
along with the order shall be fully forfeited in the event of cancellation of order. If manufacturing activities havee commenced,
the purchaser shall compensate us for the work already carried out on purchaser’s behalf, in addition to forfeiture of advance.

Customer will not have any claims over designs, drawings andmaterial lying with ISOTEX, which after cancellation of order, will
become M/s ISOTEX’sproperty.

23. SPECIAL NOTE:


Please note that this offer is made strictly on the basis of divisible contract. The property in the goods shall pass to the buyer
on the goods being handed over to the carrier for onward dispatch to site endorsement and waybills in your favour.

24. SECRECY:
All data, specifications and drawings submitted by us as a part of the order are proprietary innature and will not be passed on
by the Buyer to any third party, for whatever reason, withoutour written consent.

25. ARBITRATION:
In the event of any difference in the interpretation of these terms or dispute arising in executing the order, the same will be
resolved by reference to two arbitrators under provision of Indian Arbitration Act, 1996.

26. PLACE OF JURISDICTION:


In the event of any dispute of arising as result of contracting to supply against this offer and quotation, the place of Jurisdiction
will be Ahmedabad and not any other place.

27. GOVERNING LAWS:


Indian Laws and Regulation shall govern execution of this project.

28. GENERAL:
Any condition or other matters pertaining to this offer not expressly stipulated will be a matter of mutual discussions.
16
ISOTEX FIT SERVICE &SITE SUPERVISION POLICY
Price basis – mentioned price is perman/day
TAX – Extra 18% GST
SAC CODE: 998719

DOCUMENTATION COVERED UNDER THE POLICY


Documentation includes:
i. Daily Work Report
ii. Handover Report /completion report
iii. Log-book format
iv. Iv. Essential spares list

ACTIVITIES COVERED UNDER THE POLICY


Supervision activities includes:
i. Layout finalization
ii. Civil Marking supervision
iii. Supervision of Erection & Commissioning
iv. Training of Client’s personnel

INCLUSION
i. 8 Hours Working at Site considering break for Lunch & Tea break.
ii. Documentation as mentioned in the policy.

EXCLUSION
i. Mobilization & Demobilization of Engineers/Technicians (To & Fro Air/Railway Tickets)
ii. Accommodation near site in good Hotel
iii. Incidentals (Meals etc.)
iv. Personal Protective Equipment (Safety Helmet, Safety shoes, Safety Glass etc.)
v. Local Transportation
vi. Gate-pass, Training
vii. Any tools & Tackles required for erection, testing, commissioning, and refractory & insulation works.
viii. Unskilled/Skilled Labor
ix. Consumables
x. Any utilities

OTHER TERMS & CONDITIONS


i. Client will be liable to provide necessary provision to Expat for Thermal Screening, Sanitization, Masks (N-95 Type) due to Pandemic
conditions of COVID-19.
ii. One working day shall be equal to 8 Man-hours. 2 Hours extra time to be considered for 2 days maximum. Overtime shall be
calculated beyond those hours.
iii. Any extra days/hours due to NO fault of ISOTEX will be charged as per our daily rate as we cannot be held responsible for the local
contractor’s /client’s work completion schedule.
iv. Any Extra days/hours due to fault of ISOTEX will not be charged to client, but all exclusions shall be borne by client only.
v. In a week, our team will operate six days. Weekly-Offs/Sundays/Holidays will be charged as a working day unless otherwise noted.
vi. One week of advance intimation period is required to mobilize our team. In case ofhigh urgency of requirement of Expat,
Supervision charges shall be quoted case to casebasis.
vii. Any order arising from this offer will be subject to ISOTEX standard terms and conditions.

For,
ISOTEX CORPORATION PVT LTD.