You are on page 1of 2
UVR YUU eee oD «—' ~*~ CHENAB BRIDGE, — "> AME CLIENT ¢ KONKAN RAILWAY core. } |. Location ; cRosses CHENAB River) BETWEEN BAKEAL AND kaurl IN | FROM , KAGHMIR TO KANYAKUMACL + STEEL ANDCONCRETE BRIDGE. CONNECTS THE KASHMIR, VALLEY To THe Rest OF THE COUNTRY. + REASI IGIRICT ‘ + Lt [6 LINK IN THE STRETCH OF | tue CONTRACTOR 2 AFCONS inewasrauct | IILEM. BETWEEN KATRA AND | Lib, mumoat “FY BANIHAL. H j \ J Tr eT a Ae BRIDGE IN FIGURES é eee acti a 116 39M: HIGHER 2,315 THAN THE TP <> OFTHE EIFFEL TOWER IN PARIS emery = ME BRIDGE [6 1,216M- ap IN LENGTH WITH THE MAIN ARCH SPAN OF 467M, AT 954M Keove THE RIVER BEO- CHIGHEST RAILWAY BRIDGE) CONSTRUCTION INVOLVED 28,660 MeTRIC TONNES OF THE HEIGHT OF THE o—emmee CABLE cranes PYLW (326KM. — &9I2CR- OM THe GRNAGAR ENP | toraL Cost OF i Steet , lOLARH CUM is 127. Ha -72M — | STRETCH THE BRIDGE j BARTAWORE. sauer HAN GELHIS | 220 KMPH lookMeH * an QUTUB MINAR - { WIND VELOUTY = MAxIMUM \ ow g | AT THEDECK © GPEED PERME. | 2 er tig af tet ey » pANIHAL eS an : k 23 48 $ 5% e = gi 2u <8 By 6 S VUUVUUUTEBEeeaus FOUNDATION . SLOPE FOUNDATION AND SLOPE DETAILS CLEFT BANED + THE ERECTIONOF ARCH CPROCESS) + + USING DERRICK CRANES -

You might also like