Item
No. DESCRIPTION QTY. UNIT UNIT COST AMOUNT
1.0 EARTH WORKS 358,000.00
1.1 Excavation
1.1.1 Column Footing 560 m³ 300.00 168,000.00
1.2 Back Filling and compaction
1.2.1 Back filling 400 m³ 250.00 100,000.00
1.2.2 Gravel Base 200.0 m³ 450.00 90,000.00
``