GRADE 20 CONCRETE MIX NOTE:


1. ALL CONCRETING WORKS TO BE IN GRADE 20 CONCRETE
60 MIX
40 2. ALL FABRICATION WORKS MUST BE CONSTRUCTED AND

30
INSTALLED BY KERB MAKER MACHINE

272
152
150
90
3. ALL DIMENSION OF MOULD SHAPES TO BE IN MILLIMETRES
40
SCALE

30
60

300
REINSTATEMENT WORK
302
ALL EXISTING ROAD, FOOTPATH ETC, DAMAGED DURING
Y10 STEEL BAR
36
30
36
30
36
30
36
30
36 60 30 30 60 CONSTRUCTION SHALL BE REINSTATED AND RECTIFIED BY
60 CONSTRUCTOR.

62

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

40
PLAN AND SECTION DETAIL OF REINFORCED PRECAST CONCRETE INLET SUMP
NTS

50 100
CONCRETE DRAIN CONCRETE FOOTPATH

272
272

205 P.C. ROAD KERB

100 GRADE 20
CONCRETE MIX
REINFORCED PRECAST
225 X 225 OPENING CONCRETE INLET SUMP TO REINFORCED PRECAST
100
DETAIL CONCRETE INLET SUMP TO
DETAIL

GRADE 20 CONCRETE MIX


225

225
WELL COMPACTED HARDCORE
100 GRADE 20 CONCRETE MIX

WELL COMPACTED HARDCORE

INSTALLATION TYPE I INSTALLATION TYPE II


NTS NTS

DIREKABENTUK: NAMA PROJEK: TAJUK LUKISAN:


ANNUAL CONTRACT OF RECTIFICATION INSTALLATION AND CROSS-SECTION
DEWAN BANDARAYA KUCHING TIMBALAN PENGARAH
DILUKIS:

DISEMAK:
AND MAINTENANCE WORK FOR ROAD DETAILS FOR PRECAST REINFORCED
UTARA TARIKH: OCT, 2017
SIDE KERB, PEDESTRIAN WALKWAY AND CONCRETE OUTLET CHANNEL
OUTLET CHANNEL WITHIN DBKU AREA, NO KERJA: NO LUKISAN:
ARKITEK/JURUTERA/PERANCANG SKEL: AS SHOWN KUCHING DBKU / IMT/ L / 17 - 18 9/14