Project: Page: 1
12.6.0H
Date: 12-26-2020
Contract: SN:
Engineer: Study Case: LF Revision: Base
Filename: bai bao cao 1
Config.: Normal
ETAP
Project: Page: 2
Location 12.6.0
Date: 12-26-2020
: H
SN:
Contract:
Engineer: Study Case: LF Revision: Base
Filename: bai bao cao 1 Config.: Normal
ETAP
Project: Page: 3
Location 12.6.0
Date: 12-26-2020
: H
SN:
Contract:
Engineer: Study Case: LF Revision: Base
Filename: bai bao cao 1 Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Line1 29.376 1.291 -29.112 -17.072 264.1 -15781.6 101.4 99.8 1.63
Line9 75.625 13.710 -74.270 -22.722 1355.1 -9011.4 101.4 98.4 3.03
Line2 -20.564 -10.847 20.672 -2.735 108.3 -13582.7 99.8 100.6 0.81
Line3 129.676 27.921 -126.273 -27.818 3402.9 102.3 99.8 95.7 4.11
Line5 48.250 0.734 -47.528 -15.321 721.9 -14586.1 100.6 98.4 2.21
Line6 41.078 22.001 -40.348 -35.744 730.3 -13743.2 100.6 96.8 3.74
Line4 -68.727 -22.181 69.863 14.440 1136.7 -7741.0 95.7 98.4 2.71
Line7 -133.066 23.601 137.796 -23.047 4730.0 554.4 98.4 100.0 1.63
Line8 -94.652 -4.256 97.729 -4.326 3076.6 -8582.0 96.8 100.0 3.16
15525.9 -82371.3
ETAP
Project: Page: 4
Location 12.6.0
Date: 12-26-2020
: H
SN:
Contract:
Engineer: Study Case: LF Revision: Base
Filename: bai bao cao 1 Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Critical Report
Marginal Report
ETAP
Project: Page: 5
Location 12.6.0
Date: 12-26-2020
: H
SN:
Contract:
Engineer: Study Case: LF Revision: Base
Filename: bai bao cao 1 Config.: Normal
MW Mvar MVA % PF
Number of Iterations: 24
BÀI 2 :PHÂN TÍCH DÒNG ĐIỆN NGẮN MẠCH
Ví dụ áp dụng: Mô phỏng tính toán ngắn mạch cho hệ thống điện sau,dữ liệu của hệ thống được
cho trong đơn vị tương đối trên cơ bản 100MVA như sau:
Đường dây: TL12, TL13, TL23: 100MVA 230kV X1=X2= 0,1 ; X0 = 0,3
R=1 , X/R=25
kết quả
Project:
ETAP
Page: 1
Location: 12.6.0H
Date: 12-26-2020
Contract:
SN:
Engineer:
Revision: Base
Filename: BAO CAO NGAN MACH Study Case:
SC Config.: Normal
All fault currents are in rms kA. Current ip is calculated using Method C.
* LLG fault current is the larger of the two faulted line currents.
Project:
ETAP
Page: 2
Location: 12.6.0H
Date: 12-26-2020
Contract:
SN:
Engineer:
Revision: Base Config.:
Filename: BAO CAO NGAN Study Case: SC
MACH Normal
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1 230.000 1.22034 31.87564 31.89900 1.22034 31.87564 31.89900 1.01558 29.93530 29.95252 0.00000 0.00000 0.00000
Bus2 230.000 1.41873 40.31397 40.33893 1.41873 40.31397 40.33893 0.81724 22.61860 22.63336 0.00000 0.00000 0.00000
Bus3 230.000 1.65755 55.65504 55.67973 1.65755 55.65504 55.67973 1.14229 95.56498 95.57181 0.00000 0.00000 0.00000
Bus4 25.000 0.00706 0.17889 0.17903 0.00706 0.17889 0.17903 0.00501 0.13022 0.13032 0.00000 0.00000 0.00000
Bus5 13.800 0.00493 0.13108 0.13117 0.00493 0.13108 0.13117 0.00560 0.13989 0.14000 0.00000 0.00000 0.00000