Professional Documents
Culture Documents
St-09 (r1) - 120mld STP-R.C Details of Lintel Beam - A3-11.07.2020-Model
St-09 (r1) - 120mld STP-R.C Details of Lintel Beam - A3-11.07.2020-Model
450
Y8 @ 100 C/C Y8 @ 200 C/C
450
450
2-Y12+
2 1-Y16
2-Y12+ 2-Y12+
Y8 @ 100 C/C Y8 @ 100 C/C 1-Y16 1-Y16
(900) Y8 @ 200 C/C (900)
1 SECTION "1-1" SECTION "2-2"
L.S OF BEAM "LB1-1" ( 230 X 450 ) ( 230 X 450 )
( 230 X 450 )
B A
1800 1800 230 230
450
LB2 LB5 Y8 @ 100 C/C Y8 @ 200 C/C
450
450
3-Y16
4 3-Y16 3-Y16 BEAM SCHEDULE
Y8 @ 100 C/C Y8 @ 100 C/C
(900) Y8 @ 200 C/C (900)
SECTION "3-3" SECTION "4-4" Sl.NO NAME SIZE in "mm"
3
( 230 X 450 ) ( 230 X 450 )
L.S OF BEAM "LB1-2"
01 LB1-1 230 x 450
( 230 X 450 )
02 LB1-2 230 x 450
1 2 3 03 LB2 230 x 450
230 230
1100 1100 1100 1100 04 LB5 230 x 450
3-Y12+ 3-Y12
5 3-Y12+ 6 3-Y12 3-Y12+ 3-Y12+ 3-Y12 3-Y12+ 2-Y16
2-Y16 2-Y16 2-Y16 2-Y16
450
450
450
450
2-Y12+ 2-Y12+
6 1-Y16 2-Y12+ 2-Y12+
1-Y16
Y8 @ 100 C/C Y8 @ 100 C/C Y8 @ 100 C/C Y8 @ 100 C/C 1-Y16 1-Y16
(900) Y8 @ 200 C/C (900) (900) Y8 @ 200 C/C (900)
SECTION "5-5" SECTION "6-6"
5
( 230 X 450 ) ( 230 X 450 )
L.S OF BEAM "LB2"
( 230 X 450 )
1 2 3 4 5
1100 1100 1100 1100 1100 1100 1100 1100 1100
7 3-Y12+ 8 3-Y12 3-Y12+ 3-Y12+ 3-Y12 3-Y12+ 3-Y12+ 3-Y12 3-Y12+ 3-Y12+ 3-Y12 3-Y12+ 3-Y12+ 3-Y12
2-Y16 2-Y16 2-Y16 2-Y16 2-Y16 2-Y16 2-Y16 2-Y16 2-Y16
450
450
450
450
450
LB1-2
230 230
SPACER BARS SHALL BE
3-Y12+ 3-Y12 MAX. DIA. OF TOP ROD.
2-Y16
CLIENT :
ALL STIRRUPS ARE 2 LEGGED CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD
Y8 @ 100 C/C Y8 @ 200 C/C UNLESS OTHERWISE SPECIFIED.
450
450
DRAWING No.