You are on page 1of 4

UNITATEA/UNIT Digester Eq.

ŞANTIER/SITE SIBIU WWTP PUNCT DE LUCRU/WORK SECTION Sludge Digester


OBIECTUL/OBJECT

Raport de Acceptare a Calităţii/ Report of Quality Acceptance

Nr./No DATA/DATE 5/12/2007

Data Inspectiei/Inspection Carried Out At:

Echipamente livrate in santier.


Equipment delivered for Sludge Digester

Documentatie Folosita/Document Used:

Facturi / Documente Vamale


Invoices / Costumes.

Din Verificarile Efectuate pe Teren si Examinarea Documentelor au Rezultat Urmatoarele / Findings, as a


Result of Site Inspections and Document Examination:

4,17,2,2 Injector(1pcs)/ Pompa de injectie (1 buc.)


4,17,2,3 Scum traps(1pcs)/ Captare spuma (1 buc.)
4,17,2,4 Drip traps(3pcs)/ Captare picaturi (3 buc.)
4,17,2,5 Flame trap(5pcs)/ Captare flacara (5 buc.)
4,17,2,6 Sediment trap(3pcs)/ Captare sediment (3 buc.)
4,17,2,7 Gravel filter(1pcs)/ Filru pietris (1 buc.)
4,17,2,8 Ceramic filter(1pcs)/ Filtru ceramica (1 buc.)
4,17,2,9 Digester gas hood(1pcs)/ Captator gaz la Rezervorul de fermentare (1 buc.)
Mentiuni Speciale/Special Observations:

Echipamentele corespund specificatiei din contract


Equipments are comply with contract specification; Clause 4.32/3B-52, clause 2.24/3C-46

ENGINEER BENEFICIAR CONTRACTOR

Numele/Surname CORFAR POPA SAYIN


Prenumele/ Firs Name ADRIAN DAN TAMAY
Semnătura/ Signature:
UNIT_________________
_____________________
_____________________
___________________
SITE_________________
_______ WORK
SECTION_____________
_____________________
______

OBJECT______________
_____________________
_____________________
___________________

REPORT OF QUALITY ACCEPTANCE


No._______ Date__________

Inspection carried out at:

_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
___________________
Documents used:
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
___________________
Findings, as a result of
Site Inspections and
document examination

_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
___________________
Measures taken
(conclusions reached)

_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
___________________
Special observations:

_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
___________________
INVESTO DESIGNE CONTRA
R R CTOR
________ ________ ________
Surname _ ___ _
________ ________ ________
First Name _ ___ _
________ ________ ________
Signature __ ___ _

You might also like