Persons Saw horses Operation

P1 SH1 OP1
P2 SH2 OP2
P3 OP3
OP4
OP5
Operation Time
Place joist on saw horses 15
Measure correct length (23 feet) 5 15 5
Mark cutting line for circular saw 5 P1, P2 P1,P2
Trim joist to correct length 20 SH1 SH1
Stack trimmed joist in a designated
20 OP1 OP2
area
Bottleneck (P3, SH2)

p3 100
SH2 66.6
Total bottleneck 166.6

Cost of bottleneck 283.25


Schedule (Time view)

5 15 5 20 5 20
P3 P3
SH1 SH1
OP3 OP4
P1,P2
SH2 Bottleneck (P1, P2, SH2)
OP1, OP2
p1+p2 P1,P2
50 SH1 Bottleneck (P1, P2)
SH2 OP5
16.65 P3
total bottleneck SH2 Bottleneck (P3)
66.65 OP3, OP4
P1+P2 P1,P2
10 SH2
OP5
40
Labour cost per hour 300 5
Machine cost per hour 200 3.333333