o RIPARIAN CORRIDOR STUDY
o FINAL CITY CREEK MANAGEMENT PLAN
o
o
o
o APPENDIX B: DETAIL DRAWINGS OF SELECTED
o IMPROVEMENT TECHNIQUES
o
o This appendix provides schematic drawings (not to scale) that illushate the materials, form, and construction of
o selected improvement techniques. These drawings are not intended to substitute for site-specific engineering design.
Site-specific calculations should be completed by a qualified hydrologist, engineer, and/or landscape architect to
o determine appropriate rock sizing, structure dimensions, etc. for installation in a particular location. In most cases,
O installation of these types of projech will require relevant State, County, and City permih. It is recommended that
the publications, tables, and resources provided in chapter 4 of this document be consulted prior to designing or
o constructing any of these improvement measures. Particular care should be exercised when construction involves
o disfurbance of areas within the annual high water level of any stream.
o
List of Drawings:
o
a Drawing 1. No-mow buffer
o Drawing 2. Vegetated soil lifts with rock toe protection

o Drawing 3. Vegetated modular block retaining wall


Drawing 4. Vegetated crib retaining wall
o Drawing 5. Vegetated gabion basket retaining wall
o Drawing 6. Slope flattening
Drawing 7. Storm drain outlet protection using vegetated rock
o Drawing 8. Vegetated rock-lined swale
o Drawing 9. Replacement of narrow-span stream crossing strucfures
a Drawing 10. Gabion basket retrofit
Drawing 11. Rock-lined tailwater pool (plan view)
o Drawing 12. Rock-lined tailwater pool (cross-section view)
o Drawing 13. Rock step pool

o Drawing 14. Vortex rock weir


Drawing 15. A-jacks toe protection
o Drawing 16. Plan view of recommended bank stabilization installation
o Drawing 17. Rock vanes with J-hooks

o Drawing 18. Access steps


Drawing 19. Stabilized pervious access ramp
o
o
o
o
o
o
o
o
o
o SALT LAKE CITY OCTOBER 201O

o DEPARTMENT OF PUBLIC UTILITIES B-1 BIO-WEST, INC.

o
a
RIPARIAN CORRIDOR STUDY
o
FINAL CITY CREEK MANAGEMENT PLAN o
o
o
o
DRAWING NOT TO SCALE o
o
o
o
o
o
MOWSTRIP
OR OTHER BUFFER
o
WATER EDGE DELINEATOR o
FLOW
o
MANICUREOTURF a
I o
a
RIPARIAN PLANTINGS
o
ANO SHREDDEO BARK
MULCH; AVOID USE OF
o
BARK IN AREAS SUBJECT
TO INUNDATION AND ON
o
SLOPES STEEPER THAN 2:1 o
a
o
o
o
RIPARIAN PLANTINGS
o
AND SHREDDEO
BARK MULCH
6'x6" CONCRETE
MOW STRIP o
o
FINISH GRAOE o
WATER SURFACE
o
v o
6" GRANULAR BORROW o
o
o
CROSSSECTION VIEW o
NO.MOW BUFFER a
o
Drawing 1. No-mow buffer. o
a
SALT LAKE CITY ocToBER 2010
a
DEPARTMENT OF PUBLIC UTILITIES B-2 BIO.WEST, INC.
o
o
o
o RIPARIAN CORRIDOR STUDY
o FINAL CITY CREEK MANAGEMENT PLAN
o
o
o
o DRAWING NOT TO SCALE

O
o
o
o
o
o
o
o WOVEN COIR MAT
TOPSOIL, SEEO,
O ANO PLANTS

o
o
o
o
o
o
o LIMIT OF PERENNIAL
VEGETATION I
o I
,

o WATER SURFACE
v ,

a Ir OF COMPACTED

a
o 18'MEDIAN OIAMETER
ROCK (MTNIMUM)
o
o 'ALL TOE PROTECTION
TO MAXIMUM OEPTH OF SCOUR
o
o GRAVEL FILTER
LAYER
o SECTION VIEW

o
o VEGETATED SOIL LIFTS
o WITH ROCK TOE PROTECTION
o
o
o Drawing 2. Vegetated soil lifts with rock toe protection.
o
OCTOBER 201O
a SALT LAKE CITY

o DEPARTMENT OF PUBLIC UTILITIES B-3 BIO-WEST, INC.

O
O
RIPARIAN CORRIDOR STUDY
o
FINAL CITY CREEK MANAGEMENT PLAN o
o
a
o
DRAWING NOT TO SCALE o
a
o
o
TOPSOIL. SEED. o
ANO PLANTS
o
o
o
o
SOIL.FILLED
MODULAR BLOCK
o
o
o
o
EXISTING SLOPE
o
o
CRUSHED ROCK
LEVELING PAD
o
a
WATER SURFACE
v I
o
o
18'MEDIAN OIAMETER
ROCK(MTNTMUM)
o
a
INSTALL TOE PROTECTION
TO MAXIMUM OEPTH OF SCOUR
o
o
GRAVEL FILTER
LAYER o
SECTION VIEW
o
o
VEGETATED MODULAR BLOCK o
RETAINING WALL o
o
o
o
o
Drawing 3. Vegetated modular block retaining wall.
o
SALT LAKE CITY OCTOBER 201O
a
DEPARTMENT OF PUBLIC UTILITIES BIO.WEST, INC.
o
o
a
o RIPARIAN CORRIDOR STUDY
o FINAL CITY CREEK MANAGEMENT PLAN
o
O
a
o DRAWING NOT TO SCALE
o
o
o
o
o
o
o TOPSOIL, SEED.
O AND PLANTS

o LIVEPLANT..a
o STAKES
\
o
o 4'MtN.
O EXISTING SLOPE
DIAMETER LOGS

o
o WATER SURFACE
V
o
o
o 18" MEDIAN DIAMETER

a ROCK (MTNTMUM)

o INSTALL TOE PROTECTION


o TO MAXIMUM OEPTH OF SCOUR

o
o GRAVEL FILTE
LAYER

O SECTION VIEW

o
o VEGETATED CRIB RETAINING WALL
o
o
o
o
o
o Drawing 4. Vegetated crib retaining wall.
o
a SALT LAKE CITY OCTOBER 201O

o DEPARTMENT OF PUBLIC UTILITIES B-5 BIO-WEST, INC.

o
o
RIPARIAN CORRIDOR STUDY
o
FINAL CITY CREEK MANAGEMENT PLAN o
o
o
o
DRAWING NOT TO SCALE o
a
o
o
a
o
o
TOPSOIL, SEED,
o
AND PLANTS
a
LIVE PLANT
STAKES
o
o
o
WIRE.MESH GABION BASKETS
o
EXISTING SLOPE LINED WITH EROSION CONTROL
BLANKET AND FILLED wlTH
a
ROCKS AND SOIL
o
WATER SURFACE
V
o
o
o
18" MEDIAN DIAMETER
O
ROCK (MTNTMUM)
o
INSTALL TOE PROTECTION
o
TO MAXIMUM DEPTH OF SCOUR
o
a
GRAVEL FILTER
LAYER o
SECTION VIEW o
VEGETATED GABION
o
BASKET RETAINING WALL
o
o
o
o
o
o
o
Drawing 5. Vegetated gabion basket retaining wall.
o
SALT LAKE CITY OCTOBER 201O
a
DEPARTMENT OF PUBLIC UTILITIES B-6 BIO-WEST, INC.
o
o
O
o RIPARIAN CORRIDOR STUDY
a FINAL CITY CREEK MANAGEMENT PLAN
o
o
o
o DRAWING NOT TO SCALE

o
o
o
o
O
o
o
a
o
o
o EXISTING SLOPE
TOPSOIL. SEED. AND PLANTS
o
o
o
o
o EROSION CONTROL
BLANKET
o
o
a 2:1 SLOPE

o OR FLATTER

o WOOD STAKES OR METAL STAPLES FOR


o ANCHORING EROSION CONTROL BLANKET

o cRosssEcrro[vrE!/v
o -_./
o SLOPE FLATTENING
o
o
o
o
o
O
o Drawing 6. Slope flattening.
o
o SALT LAKE CITY OCTOBER 201O

o DEPARTMENT OF PUBLIC UTILITIES B-7 BIO-WEST, INC.

o
o
RIPARIAN CORRIDOR STUDY
o
FINAL CITY CREEK MANAGEMENT PLAN a
o
a
o
DRAWING NOT TO SCALE a
o
o
o
ROCK APRON o
VEGfiATEO
ROCK.LINED SWALE
4' (MIN.) WDER THAN
PIPE DIAMETER o
a
STORM DRAIN
OUTLET PIPE
o
o
o
o
o
o
o
a
a
LIVE PLANT STAKES TAPER EDGES OF
ROCK APRON UPHILL o
PLAN VIEW
INTO EXISTING SIOE
SLOPES o
o
o
STORM ORAIN
OUTLET PIPE
o
ROCK APRON
o
o
a
o
GRAVEL FILTER
LAYER o
CROS$SECTION VIEW SOIL AND SEED
o
o
STORM DRAIN OUTLET a
PROTECTION USING o
VEGETATED ROCK o
a
a
Drawing 7. Storm drain outlet protection using vegetated rock.
o
o
SALT LAKE CITY OCTOBER 201O
o
DEPARTMENT OF PUBLIC UTILITIES B-B BIO-WEST, INC.
o
o
o
o RIPARIAN CORRIDOR STUDY
o FINAL CITY CREEK MANAGEMENT PLAN
a
o
o
o DRAWING NOT TO SCALE

o
o
o
o
o
o
o
o
a
o
o
o
o
o
o
a
o
o
a
o EROSION CONTROL BLANKET
a ANCHORED WITH METAL STAPLES

o CROSS.SECTION VIEW

a
o
o VEGETATED ROCK.LINED SWALE
o
o
o
o
o
o
o Drawing 8. Vegetated rock-lined swale.
o
o SALT LAKE CITY OCTOBER 201O

o DEPARTMENT OF PUBLIC UTILITIES B-9 BIO-WEST, INC.

o
o
RIPARIAN CORRIDOR STUDY
o
FINAL CITY CREEK MANAGEMENT PLAN o
o
o
o
DRAWING NOT TO SCALE a
NARROW.SPAN CROSSING:
o
CONSTRICTS FLOW, TMPS
OEBRIS, INTERRUPTS
o
CONNECTIVITY, SCOUR ANO
CLOGGING LIKELY
o
o
ROADOR
I
!
I
o
TRAIL I
t o
I
t o
WATER
o
FLOW o
I o
o
PLAN VIEWOF
NARROW-SPAN CROSSING o
o
o
o
o
WDE.SPAN CROSSING;
MAINTAINS CONNECTIV]TY ANO
o
ALLOWS NAruRAL TMNSPORT
OF SEDIMENT ANO OEBRIS
o
o
o
ROADOR a
TRAIL
o
a
WATER
FLOW o
o
I O
PI.AN VIEW OF RECOMMENOEO WDE.SPAN O
BRIOGE OR OPET+,BOTTOM BOX CULVERT
o
REPLACEMENT OF NARROW-SPAN o
STREAM CROSSING STRUCTURES o
o
Drawing 9. Replacement of narrow-span stream crossing structures. o
a
SALT LAKE CITY ocToBER 2010
O
DEPARTMENT OF PUBLIC UTILITIES B-10 BIO-WEST, INC.
o
o
o
o RIPARIAN CORRIDOR STUDY
o FINAL CITY CREEK MANAGEMENT PLAN
o
o
o
o DRAWING NOT TO SCALE

a
o
o
o
a
o
o REMOVE UPPER TIERS OF GABIONS TOPSOIL, SEED, AND
PLANTS. INCORPORATE
o (ABOVE AHWL). LAY BACK SLOPE TO
GREATEST EXTENT POSSIBLE AND EXISTING
BIOTECHNICAL
METHODS ON SLOPES > 3:'l
o REVEGETATE USING TOPSOIL, SEED,
AND BIOTECHNICAL STABILIZATION
SLOPE

o TECHNIOUES AS NEEDED

o
o RETROFIT LOWER GABION TIERS

o (WITHIN AHWL) WITH LIVE PLANT


STAKES. CREATE PILOT HOLES SLOPE AFTER
o W|TH REBAR, PIPE. ANO/OR DRILL
EQUIPMENT. REWIRE BASKETS AS
RETROFIT

o NEEDED WITH PVC-COATED WRE

o
WATER SURFACE
O V
o EXISTING UNVEGETATED

o GABION BASKETS

o
o SECTION VIEW

o
o GABION BASKET
o RETROFIT
o
a
o
o
o
o
o
o Drawing 1O. Gabion basket retrofit.
O
ocToBER 2010
o SALT LAKE CITY

o DEPARTMENT OF PUBLIC UTILITIES B-11 BIO-WEST, INC.

o
o
sfL RIPARIAN CORRIDOR STUDY
o
.lii
l,fl FINAL CITY CREEK MANAGEMENT PLAN o
o
o
DRAWING NOT TO SCALE
o
o
o
o
o
l
1.-
o
o=
<6
o
6z
zz
#t
o
FO

z
O
9
o
U
g
o
o
to o
o
v\ o
c
i
o
o
o
E
O
o
o
o
eB
ao
uo
96
Hii$fliHH o
o
B9 o
IHEIffi
PE
EU
o
o
a
a is=i H.b,rh o
o
1$.i o
o
o
'J3i
$$ffi
$P.D'
9t
ol
tl
o.
=E
<U
a-o^, o
O
o
o
o
o
Drawing 11. Rock-lined tailwater pool (plan view).
o
SALT LAKE CITY OCTOBER 201O
o
DEPARTMENT OF PUBLIC UTILITIES B-12 BIO-WEST, INC.
o
o
o
o RIPARIAN CORRIDOR STUDY
o FINAL CITY CREEK MANAGEMENT PLAN
o
o
o
o DRAWING NOT TO SCALE

o
o
o 2 o
o 69
t oE
f
U
F

o dd
F
1o
o
F
z
o
o s 5.
gH z
bE L d82d
&u 2.L
o o>
iro
c
gu
tF

o
o
o
o
o Eg
]G
oo
@w

o qH
3o
oo
22
o
o o"
o-
dE
EO
oz
o q>

o 9=u
9Zh ;q
H:= z
o AFE
big
Z 6'j
I
o

o ozl 6
o
E
a
o
o o\
o 6
co
o ZT

o EJ
t
o
o
o
o
o
o
o
o Drawing 12. Rock-lined tailwater pool (cross-section view).
o
o SALT LAKE CITY OCTOBER 201O

o DEPARTMENT OF PUBLIC UTILITIES B-13 BIO-WEST, INC.

o
o
RIPARIAN CORRIDOR STUDY
o
FINAL CITY CREEK MANAGEMENT PLAN o
o
o
o
DRAWING NOT TO SCALE a
o
o
o
o
o
o
q?,
raF
a

lil'$
'f)5r:
o
o
o
o
O
o
o
KEY ROCK WEIR INTO BANK
o
o
o
o
o
StGpHl
I
I
o
WATER SURFACE o
-WaterFlow
o
o
o
O
o
CROS$SECTION VIEW o
o
ROCK STEP POOL O
a
o
o
Drawing 13. Rock step pool.
O
o
SALT LAKE CITY OCTOBER 201O
o
DEPARTMENT OF PUBLIC UTILITIES B-14 BIO-WEST, INC.
o
o
o
o RIPARIAN CORRIDOR STUDY
o FINAL CITY CREEK MANAGEMENT PLAN
o
o
o
o DRAWING NOT TO SCALE

o
o
o
o WATER
o FLOW

O I
o
o
O
o
o
o Ny
O Nly +BANKFULLWIOTH- u -rN ROCK TO 1/3
o lv BANKFULL WIOTH

o PLAN VIEW

o
a
o
o
o
o
o
o
o
o
o
o CROS$SECTION VIEW

o
o VORTEX ROCK WEIR
o
o
o Drawing 14. Vortex rock weir.
o
ocroBER 2010
o SALT LAKE CITY

o DEPARTMENT OF PUBLIC UTILITIES B-15 BIO-WEST, INC.

o
O
RIPARIAN CORRIDOR STUDY
a
FINAL CITY CREEK MANAGEMENT PLAN o
o
o
o
DRAWING NOT TO SCALE o
o
o
o
a
o
o
o
TOPSOIL, SEEO,
o
ANO PI.ANTS
o
EXISTING STREAM BANK
o
LIVE PLANT STAKES
o
o
LIMIT OF PERENNIAL
VEGETATION o
COIR FIBER ROLL
EROSION CONTROL
BI.ANKET
o
WATER SURFACE
o
o
WOOO STAKES OR METAL STAPLES FOR
O
ANCHORING EROSION CONTROL BLANKET
o
o
STONE OR COBBLE
AND SOIL FILL
o
o
A. JACKS o
INSTALL A.JACKS
GRAVEL FILTER
LAYER
o
TO MAXIMUM
DEPTH OF SCOUR
o
CROSS.SECTION VIEW o
a
A. JACKS TOE PROTECTION o
o
o
o
o
o
Drawing 15. A-jacks toe protection.
o
SALT LAKE CITY OCTOBER 201O
o
DEPARTMENT OF PUBLIC UTILITIES B-16 BIO-WEST, INC.
O
o
o
a RIPARIAN CORRIDOR STUDY
a FINAL CITY CREEK MANAGEMENT PLAN
o
a
o
o DRAWING NOT TO SCALE

o UJ
o.
o t o
)
o
o EI lr urI
tt
o
.L
O 9l 96
o
F
I
YH
o I 8P
El EO-
o
o
o
o 9
J
o o
G

o G
UJ
_o
lr
o G
6
o
o
o o
llt
o Y
a
O ,
)o-
o
o
o u,
o ooL
9a
E
O I.U
ZE,
<tr
o o-fi
Oe a
o sg
>o
o
z
F
o z
{u
i(L
o g
;e
zo
{g1
o H
Y
otr
ulE
ui
o o
o
E
oi)
Oe

o xul sg
F 9l
= =o
o G,
o il
uJl
o 3l
o
O Drawing 16. Plan view of recommended bank stabilization installation.
a
o SALT LAKE CITY OCTOBER 201O

o DEPARTMENT OF PUBLIC UTILITIES B-17 BIO-WEST, INC.

O
O
RIPARIAN CORRIDOR STUDY
o
FINAL CITY CREEK MANAGEMENT PLAN o
o
o
o
DRAWING NOT TO SCALE O
o
o
o
o
o
o
ROCK VANES WITH J-HOOKS o
CAN BE COMBINED WITH BANK
STABILIZATION STRUCTURES o
o
o
o
I
o
SLOPE OF VANE > 206
(FROM S|LL TO J-HOOK) I
o
I o
o
I

THE SUGGESTED DISTANCE


BETWEEN STRUCTURES (WITH
RELATIVELY GENTLE BEND
CURVATURE) IS TWCE THE
o
CHANNEL W|OTH o
t
I
o
I

I o
o
o
2OO. 3d ANGLE O
o
FROM BANK LINE
o
o
O
o
PI.AN VIEIY o
o
ROCK VANES WITH J.HOOKS o
o
Drawing 17. Rock vanes with J-hooks.
o
o
SALT LAKE CITY ocToBER 2010
o
DEPARTMENT OF PUBLIC UTILITIES B-18 BIO-WEST, INC.
a
o
o
o RIPARIAN CORRIDOR STUDY
O FINAL CITY CREEK MANAGEMENT PLAN
a
o
o
O DRAWING NOT TO SCALE
o
O
o GRAVELANDSOIL
o BACKFILL FOR TREAO

o
o FASTENING
o BOLTS

o
o
o
o
o
o
o
o
o
o
o
o
o dx6'WOODTIMBERS
OR BLOCK FOR STEPS

o
o
o FASTENIT.IG

o BOLTS

o
o sEcTroNvrEw

o
o ACCESS STEPS
o
o
o
o
o lhawing 18. Access steps.
ocToBER 2010
o SALT LAKE CITY

o DEPARTMENT OF PUBLIC UTILITIES B-19 BIO-WEST, INC.

o
a
RIPARIAN CORRIDOR STUDY
o
FINAL CITY CREEK MANAGEMENT PLAN O
o
a
o
DRAWING NOT TO SCALE o
a
2.3'DIAMETER
BOULDERS o
o
o
FILL VOIDS
WITH SAND
o
OR SANOY
LOAM ANO WATER
o
SEED FLOW o
o
o
PERMEABLE
o
CONCRETE
MODULAR PA
o
BLOCKS o
SPLIT RAIL o
FENCE
o
PLAN VIEW
o
o
o
EXISTING
o
STREAM BANK o
O
o
o
WATER SURFACE
v o
o
o
o
COEBLE TOE
PROTECTION o
CROSS.SECTION VIEW
a
STABIIIZED PERV!OUS o
ACCESS RAMP o
o
Drawing 19. Stabilized pentious access ramp. o
a
SALT LAKE CITY OCTOBER 201O
o
DEPARTMENT OF PUBLIC UTILITIES B-20 BIO-WEST. INC,