Professional Documents
Culture Documents
SATELLITES AT MM WAVE
Acknowledgement: ESOA
www.avantiplc.com
©www.avantiplc.com
Avanti Communications Group plc PRIVATE AND CONFIDENTIAL
ITU WRC-2019 AI 1.13 – Spectrum For IMT/5G
AI 1.13
WRC-19 To consider identification of frequency bands for the
future development of IMT including possible additional
WRC-15 – Future Agenda allocations, in accordance with Resolution 238
The difference between those developing 5G and the ones counting the cost of deployment has
been throw into stark contrast with the CEO of BT Group claiming there are no business cases
for the next generation technology.
Speaking at Huawei's Global Mobile Broadband Forum in London today (16 November), Gavin
Patterson also claimed 5G would cause more security risks and potentially affect jobs.
The CEO’s remarks either amounted to a stark reality check amid excitable predictions and
industry hopes, or a gloomy prognosis that 5G could stutter in the same way 3G did.
Given Patterson's typically upbeat assessments of the telecom industry's future over the years,
his stance could set alarm bells ringing that getting investment in new technologies may prove
harder than tech teams might expect.
The CEO repeatedly talked about the uncertainty of 5G’s return on investment. He said: "We
need to build the business case for 5G. Innovation is there...but ultimately as carriers we need to
make significant investment and put capex down."
He added: "From 3G to 4G the case was underpinned by going from what was a pretty poor
performance to one that opened up the opportunity for mobile. We haven't found that for 5G. It
will be a better performance, no doubt about that, but the business case isn't there."
© Avanti Communications Group plc
‘Business Case For mmwave 5G Terrestrial ?’
ROM COST ESTIMATE FOR CAPEX FOR MMWAVE 5G ROLLOUT IN A MAJOR CITY
GREATE
CITY R GREATER GREATER
LONDO
N MANCHESTER WEST MIDLANDS
https://en.wikipedi
a.org/wiki/List_of_u
125663.706
AREA OF 5G CELL m2 125664 1 125663.7061 Assume 5G cell coverage is circular
5013.38070
NO. OF CELLS NEEDED 13823 7 4758.732798
5G BASE STATION
COST US$ k 75 75 75 Estimate
There is need for 5G Ecosystem to support a mix of terrestrial licensed (4.X G, 5G) ,
terrestrial unlicensed (WIFI, WIGIG) and satellite systems (GEO / Non-GEO)
In sub-urban areas
Along motor-ways / roads (e.g. for connected cars)
Rural areas