You are on page 1of 22

SETECH (INDIA)

CONSULTING ENGINEERS AND CONSTRUCTOR


28/2/1, Laxmi Narayan Colony
Barasat, Kolkata – 700 126, W.B.
Phone No. + 91 33 2524 0016/ 9831681155
Tele Fax No. + 91 33 2542 2375
E-mail :setechindia03@yahoo.co.in
Web site: www.setechindia.co.in

EFFLUENT TREATMENT SEWAGE TREATMENT


PLANT PLANT
ABOUT OUR
ORGANIZATION
SETECH (INDIA)
Regd. Off. : 998 Nabapally Circular Road, P.O. – Nabapally
Barasat, Kolkata – 700 126, W.B.
Phone No. + 91 9831681155 / 9433002375
Tele Fax No. + 91 33 2524 0016
E-mail : setechindia03@yahoo.co.in/
pcoorg11@gmail.com

Inception : 1997

Work Station

332 B, Road No -4, Ashok Nagar,


Ranchi – 834002

Setech(India)
Kol-126
Area of Specialization

Water &
Waste Water
Management

Waste Water Water


Treatment Treatment

Services Provided
By
SETECH

Effluent Topographical
Treatment Survey

Setech(India)
Kol-126
Our Esteemed clients

Setech(India)
Kol-126
GENERAL INFORMATION

Proforma –I

1 Name of the Bidder Setech ( India) .

Head office
995, NABAPALLY CIRCULAR ROAD,
Address BARASAT. KOLKATA – 700 126.

91 – 33 – 2542 2375
Tel. No.
2
91 – 98316 81155
Mobile no.
pcoorg11@ gmail.com
Email setechindia03@yahoo.co.in

28/2/1 B, L.N.COLONY,
Address on which Correspondence P.O. – NABAPALLY , BARASAT ,
should be done KOLKATA – 700126
LAND MARK- BEHIND SUBHAS CLUB.
91-33-2524 0016
Tel. No.
3 91 – 83369 93228 / 91-94775 56975
Mobile no.

Email pcoorg11@ gmail.com


setechindia03@yahoo.co.in

BARASAT MUNICIPALITY
4 Place of incorporation / registration
(Copy Enclosed)
Legal status of the applicant (attach
5 copies of original documents defining
the legal status)
i. Specify, if the bidder is
a. An Individual NA
b. Proprietary Firm YES
c. A firm in partnership NA
d. A limited Company or Corporation NA
ii. Attach a copy of Proprietorship or
Partnership Deed or Article of
PROPRIETORSHIP
Association or Incorporation of
(Copy Enclosed)
company or JV agreement as the case
may be
Name of Proprietor / Partners/ directors Proprietor: SHYAMA CHATTERJEE.
with their address ,
995, NABAPALLY CIRCULAR ROAD,
BARASAT. KOLKATA – 700 126
6
Mobile & Telephone numbers,
Fax, Mobile : 9433888790
Tel : 91 33 2542 2375
Fax : 91 33 2524 0016`
GENERAL INFORMATION

E-mail address
pcoorg11@ gmail.com
setechindia03@yahoo.co.in

Chief Operating Officer


cum Team Leader
Snehasish Chattopadhyay

Designation of individuals authorized to 998, Nabapally Circular Road , Barasat .


act for the organization with the Kolkata – 700 126
7 address, Mobile & telephone numbers,
Fax, E-mail address (Enclose legal
Power of Attorney). Mobile – 91 98316 81155 / 9433002375

Tel : 91 33 2542 2375


Fax : 91 33 2524 0016

Was the applicant ever required to


suspend any construction for a period of
more than six months continuously after
8 NA
commencement of the construction? If
so, give the name of the project &
reasons of suspension of work.
Has the applicant of any constituent
partner, in case of a partnership firm,
9. ever abandoned the awarded work No
before its completion? if so, give
details.
Has the applicant or any constituent
partner , in case of partnership firm,
10 ever been debarred / black listed for No
tendering in any organization at any
time ? If so, give details.
Has the applicant or any constituent
partner in case of partnership firm, ever
11 been convicted by a court of Law? If so, No
give details.

Rs.50.00 lac ( certificate is attached)


12 Bank solvency
Other details ( copy to be enclosed)
14
a) VAT / Sales Tax registration no
Not applicable.
valid up to date

ACRPC3592J
b) PAN
copy enclosed

c) GST 19ACRPC3592J2Z2
Copy enclosed.
GENERAL INFORMATION

d) Others as found necessary NA

1. Madhya Pradesh Jal Nigam (A Govt


of Madhya Pradesh Undertaking).
2. Rural Water and Sanitation
Division, Govt of Odisha.
Give particulars of registration with 3. Public Health Engineering
Govt / Semi- Govt / Public Sector Department, Govt of Bihar.
15
Undertakings / Local bodies( copies to 4. Punjab Municipal Infrastructure
be enclosed) Development Company
(A Govt. of Punjab Undertaking)
5. Drinking Water and Sanitation
Department Govt. of Jharkhand,
(All Copies enclosed)

Signature of authorised representative


LENGTH OF EXPERIENCE
IN WATER SUPPLY
PROJECT
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


1 Eastern Engineers, Indian Oil Community Water Supply 1.Design, detail engineering, Completed
Guwahati, Assam. Corporation Ltd., Development-Rs.1.20 Cr project management. successfully.
1995
Guwahati Refinery (including cost of pipe) 2.Detail project report.
Assam
2 Scientific Instruments Indian Oil Water Supply -Rs. 1.50 Cr 1.Design, detail engineering, Completed
Limited, Kolkata. Corporation Ltd., (including cost of pipe). project management. successfully.
Digboi Refinery, 2.Detail project report. 1998
Assam.

3 Frontier Engineering, Assam Urban Water Barepata Town Water supply Soil investigation, design, Commissioned
Guwahati. Supply and Sewerage scheme 7.60 MLD – detail engineering of Water successfully in
Board, Guwahati – Rs.4.50Cr. Treatment plant units and May 2003.
781005. Reservoirs, design of 2001-2003
distribution network, project
monitoring.

4 Assam Urban Water Assam Urban Water Palashbari Water supply Soil investigation, design, Job completed
Supply and Sewerage Supply and Sewerage scheme – Rs.1.20 Cr. detail engineering of Water successfully.
Board, Guwahati – Board, Guwahati – Treatment plant units and
781005. 781005. Reservoirs, design of
2000
distribution network,
preparation of tender
document, detailed estimate.

5 Assam Urban Water Assam Urban Water Bilasipara Water supply Soil investigation, design, Job completed
Supply and Sewerage Supply and Sewerage scheme – Rs.2.50 Cr. detail engineering of Water successfully.
Board, Guwahati – Board, Guwahati – Treatment plant units and
781005. 781005. Reservoirs, design of 2001
distribution network,
preparation of tender
document, detailed estimate.
6 Assam Urban Water Assam Urban Water Lakhipur Water supply Soil investigation, design, Job completed
Supply and Sewerage Supply and Sewerage scheme – Rs.2.50 Cr. detail engineering of Water successfully.
Board, Guwahati – Board, Guwahati – Treatment plant units and
781005. 781005. Reservoirs, design of
distribution network, 2003
preparation of tender
document, detailed estimate.

7 Assam Urban Water Assam Urban Water Sarthebari Water supply Soil investigation, design, Job completed
Supply and Sewerage Supply and Sewerage scheme – Rs.2.50 Cr. detail engineering of Water successfully.
Board, Guwahati – Board, Guwahati – Treatment plant units and
781005. 781005. Reservoirs, design of
2003
distribution network,
preparation of tender
document, detailed estimate.

8 Eastern Engineers, Assam Urban Water Golaghat Water supply Soil investigation, design, Project
Guwahati Supply and Sewerage scheme –12.32 MLD detail engineering of Water commissioned.
Board, Guwahati – Rs.20.00Cr. Treatment plant units and
2001-07
781005. Reservoirs, design of
distribution network, project
management.

1 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


9 Assam Urban Water Assam Urban Water Gossaingaon Water supply Soil investigation, design, Job completed
Supply and Sewerage Supply and Sewerage scheme – Rs.2.50 Cr. detail engineering of Water successfully.
Board, Guwahati – Board, Guwahati – Treatment plant units and
781005. 781005. Reservoirs, design of 2004
distribution network,
preparation of tender
document, detailed estimate.
10 Water works Engineers, Public Health Engg. Water Treatment Plant at Design detail engineering and Job completed
Kolkata Department, Govt of shillong – Rs. 10.00 Cr. execution of Water Treatment 2001 successfully.
Meghalaya. plant, periodical supervision.

11 Saha Institute of Nuclear Saha Institute of Detailed Survey of the Salt Detailed Survey, drawing and Job completed
Physics, Bidhannagar, Nuclear Physics, Campus and Residential submission of softcopy/ hard
2000-01
Kolkata - 700064 Bidhannagar, Kolkata complex. copy.
- 700064
12 Saha Institute of Nuclear Saha Institute of Design and consultancy of Architectural drg, preparation Job completed.
Physics, Bidhannagar, Nuclear Physics, Car parking area of drawing, estimate, tender,
Kolkata - 700064 Bidhannagar, Kolkata development – Rs.30.00 lac periodical supervision. 2000-01
- 700064
13 Saha Institute of Nuclear Saha Institute of Design and consultancy Architectural drg, preparation Job completed.
Physics, Bidhannagar, Nuclear Physics, Helium plant Building – of drawing, estimate, tender,
2002
Kolkata - 700064 Bidhannagar, Kolkata Rs.20 lac periodical supervision.
- 700064
14 North 24 Paraganas Zilla North 24 Paraganas Construction of Flood shelter Soil investigation, and Job completed.
Parishad, Barasat, Zilla Parishad, – cum- school building. – foundation design for Media
2001
Kolkata Barasat, Kolkata Rs.73.00 lac High school.

15 North 24 Paraganas Zilla North 24 Paraganas Construction of Road under Soil investigation and detailed Job completed.
Parishad, Barasat, Zilla Parishad, PMGSY – rs. 24.40 Cr. project report. 2002
Kolkata Barasat, Kolkata
16 PWD (Roads) , Govt of PWD (Roads) , Govt Construction of Road under Soil investigation and detailed Job completed.
West Bengal, Barasat of West Bengal, RIDF VII - Rs.110 lac project report.
Division. Barasat Division. 2001

17 Water Works Engineers, Public Engineering Jowai Town Water supply Design detail engineering and Job completed
Kolkata Department, Govt of scheme. – appx Rs 60 lac execution of Water Treatment successfully.
2002
Maghalaya. plant, periodical supervision.

18 Assam Urban Water Assam Urban Water Lala Water supply scheme – Soil investigation, design, Job completed
Supply and Sewerage Supply and Sewerage Rs.2.50 Cr. detail engineering of Water successfully.
Board, Guwahati – Board, Guwahati – Treatment plant units and
781005. 781005. Reservoirs, design of 2003
distribution network,
preparation of tender
document, detailed estimate.

19 EPCON (India), Maxcom Construction of Effluent Design, detail engineering of Job completed
Kolkata. International, Treatment Plant for Textile Effluent treatment plant. 2003 successfully.
Tamilnadu. Mill.- INR 200 lac
20 National Institute of The Director, Survey and Preparation of Detail survey, preparation of Job completed.
Technology, Silchar, National Institute of land layout plan. Drawings.
2003
Assam technology, Silchar,
Assam

2 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


21 L-Five international, L-Five international, Construction of Effluent Detail project report, design Job completed
Madagaskar. (Taken Madagaskar (in treatment plant. _ INR 500 and detail engineering of successfully.
2003
over by An American association with lac Effluent treatment plant.
Firm) Epcon _India).
22 Eastern Engineers / PWD, Govt of Construction of Combined Detail project report, detail Plant
Frontier Engineering, Assam. Effluent treatment plant and engineering, execution and Commissioned
Guwahati. Sewer network for Guwahati commissioning. 2005 -06 in Feb 2006
Medical College.Rs. 12.00 Cr successfully.

23 Armstong Ltd., Armstong Ltd., Construction of Effluent Detail project report, design Job completed
Tamilnadu. Tamilnadu. treatment plant. – Rs.375 lac and detail engineering of successfully.
2005
Effluent treatment plant.

24 Pollution Control M/s. M.L. Dyeing, Construction of Effluent Detail project report, detail Plant
Org,Kolkata. Bangladesh. treatment plant. –INR 275 lac engineering, execution and Commissioned
2005
commissioning. in Dec 2005
successfully.
25 Pollution Control Org, Pollution Control Construction of Effluent Detail project report, detail Plant
Kolkata. Org, Kolkata. treatment plant. – Rs. 85.00 engineering, execution and Commissioned
2005-06
lac commissioning. in Mar 2006
successfully.
26 North East Design Indian Institute of Construction of swimming Project report, design, detail Job completed.
Team, Guwahati. engineering, Pool, Viewing Gallery, Water engineering.
2005
Guwahati. filtration system.- Rs 4.00 Cr

27 Public health Bodoland Territorial Construction of Kokrajhar Preparation of Detailed project Project
Engineering Department, Council, Kokrajhar, Town water Supply scheme, report, Detail engineering, sanctioned under
Govt of Assam. Assam. Kokrajhar. – Rs. 23.57 Cr. including soil investigation, NLCPR scheme
preparation of Tender and
2004-07
document, project commissioned in
management services. sept 2013.

28 Public health Bodoland Territorial Construction of Subankhata Preparation of Detailed project Project
Engineering Department, Council, Kokrajhar, Town water Supply scheme, report, Detail engineering, technically
Govt of Assam. Assam. Baska distt. – Rs. 3.76Cr. including soil investigation, cleared by Govt
preparation of Tender 2005- 07 of India
document, project commissioned in
management services. Dec 2012.

29 Public health Bodoland Territorial Construction of Nikhasi Preparation of Detailed project Job Completed
Engineering Department, Council, Kokrajhar, Town water Supply scheme, report, Detail engineering,
Kokrajhar Govt of Assam. Tangla– Rs. 4.50Cr. including soil investigation,
2006
Assam. preparation of Tender
document, project
management services.
30 Pollution Control Org, Sunman Group of Construction of Effluent Detail project report, detail Plant
Kolkata. Companies, treatment plant. -Rs.1.50 Cr. engineering, execution and Commissioned
2005-06
Chittagong, commissioning. in May 2006
Bangladesh. successfully.

3 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


31 Pollution Control Org, Glory Industries Construction of Effluent Detail project report, detail Plant
Limited, (Sunman treatment plant - Rs.1.10 Cr. engineering, execution and Commissioned
Group of commissioning. in Mar 2006
2005-06
Companies), successfully.
Chittagong,
Bangladesh.
32 Public health Bodoland Territorial Construction of Bhergaon Preparation of Detailed project Project
Engineering Department, Council, Kokrajhar, Town water Supply scheme – report. technically
Kokrajhar Govt of Assam. Rs.2.53 Cr. 2006 cleared by
Assam. competent
authority.
33 Public health Bodoland Territorial Construction of Basugaon Preparation of Detailed project Job Completed.
Engineering Department, Council, Kokrajhar, Town water Supply scheme - report, Detail engineering,
Kokrajhar Govt of Assam. Rs.3.03 Cr. including soil investigation,
2006
Assam. preparation of Tender
document, project
management services.
34 Public health Bodoland Territorial Construction of Kajalgaon Preparation of Detailed project Job Completed.
Engineering Department, Council, Kokrajhar, Town water Supply scheme report, Detail engineering,
Kokrajhar Govt of Assam. Rs.2.98Cr. including soil investigation,
Assam. preparation of Tender 2006
document, project
management services.
35 Public health Bodoland Territorial Construction of Udalguri Preparation of Detailed project Job Completed.
Engineering Department, Council, Kokrajhar, Town water Supply scheme report, Detail engineering,
Kokrajhar Govt of Assam. Rs.5.33Cr. including soil investigation,
Assam. preparation of Tender
2006
document, project
management services.

36 Public health Public health Construction of Water Execution, supply and Job completed.
Engineering Department, Engineering Treatment plant commissioning of Water ( thru contract
Govt of West Bengal Department, Govt of treatment plant units. 2005 agency)
West Bengal

37 Public health Bodoland Territorial Construction of Salakati Preparation of Detailed project Job Completed.
Engineering Department, Council, Kokrajhar, Town water Supply scheme, report, Detail engineering,
Kokrajhar Govt of Assam. Salakati – Rs.2.25 Cr. including soil investigation,
Assam. preparation of Tender 2006
document, project
management services.

38 Public health Bodoland Territorial Construction of Kazigaon Preparation of Detailed project Job Completed.
Engineering Department, Council, Kokrajhar, Town water Supply scheme, report, Detail engineering,
Kokrajhar, Govt of Assam. Kokrajhar– Rs. 1.09Cr. including soil investigation,
2006
Assam. preparation of Tender
document, project
management services.

4 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


39 Pollution Control Org, Glory Industries Construction of Effluent Detail project report, detail Plant is expected
Kolkata. Limited, (Sunman treatment plant. - Rs.1.50 Cr. engineering, execution and to be
Group of commissioning. Commissioned
2005-06
Companies), in October 2006.
Chittagong,
Bangladesh.
40 M/s. Robert Lamare, Public Health Construction water 0.50 Detail engineering, Plant
Shillong, Meghalaya. Engineering MLD treatment plant at preparation of drawings. commissioned.
2006
Department, Govt of Umdeng, Meghalaya – Rs.
Meghalaya. 0.60 Cr.
41 Haldia Development Haldia Development Construction of PMGSY Survey with total station, Completed.
Authority, Haldia , West Authority, Haldia , road – Rs 24.00 Cr preparation of detail project 2006
Bengal West Bengal report
42 Turnkey Engineering JUSCO Water, Sewage , Effluent Design, Detail engineering, of Job completed.
Services treatment plant in Singur Water, Sewage and Effluent 2007
Factory, WB - Rs 35 Cr treatment plants.
43 Ramky Infrastructure Public Health 31 MLD Capacity Sewage Design, detail engineering of Project
Ltd., Hyderabad Engineering Deptt, Treatmnet Plant at Rajarhat plant units. completed.
2007 – 08
Govt of West Bengal. New town Complex -
Rs. 72 Cr
44 IVRCL Infrastructure Public Health 6.40 MLD water treatment Design, detail engineering of Design and
Limited, Hyderabad. Engineering Deptt, plant, At Arah, Bihar _ Rs 57 plant units, Jetty structure in detail
Govt of Bihar Cr River Ganga, Intake, Pre- engineering is
settling tank, WTP, UGR, 2007-08 completed.
ESRs, Distribution network. Project
completed
successfully.
45 Eastern Engineers, Public Health Arah Town Water supply Design of distribution Job completed.
Guwahati. In Engineering Deptt, scheme, Arah, Bihar – Rs network.
collaboration with M/s. Govt of Bihar 9.50 Cr 2007-08
J. P. Enterprises, Bihar

46 IVRCL Infrastructure Public Health 8.00 MLD water treatment Design, detail engineering of Job completed.
Limited, Hyderabad. Engineering Deptt, plant, At Deoghar, Infiltration well, plant units. 2008 Plant running
Govt of Jharkhand. Jharkhand. - Rs. 154 Cr successfully.
47 IVRCL Infrastructure Public Health 10.0 MLD water treatment Preparation of Architectural & Job completed.
Limited, Hyderabad. Engineering Deptt, plant, At Jhumritaliya, Stractural Designs and
Govt of Jharkhand. Jharkhand. - Rs. 154 Cr Drawings, Submission of 2009
Design Calculations &
Drawings.
48 Public health Public health Multi-villages Water Supply Preparation of Detailed Job completed.
Engineering Department, Engineering scheme for Arsenic – affected Project Report.
Govt of Bihar. Department, Govt of areas in Maner District.- 2007-08
Bihar. Rs.57.00 Cr.

49 Do Do Multi-villages Water Supply Do Job completed.


scheme for Arsenic – affected
areas in Bidupur District. –
2007-08
Rs.114.00 Cr.

5 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


50 Do Do Multi-villages Water Supply Do Job completed.
scheme for Arsenic – affected
areas in Buxar District. –
2007-08
Project cost – Rs.107 Cr.

51 IVRCL Infrastructure Public Health Sheikpura Water supply Design of ESRs and other Completed.
Limited, Hyderabad. Engineering Deptt, scheme., Patna, Bihar. structures. 2008
Govt of Bihar
52 Public health Public health Implementation of Drainge Surveying, design, detail DPR is
Engineering Department, Engineering scheme for Bhabua Town, engineering, preparation of completed.
Govt of Bihar. Department, Govt of Bihar. – Project cost – tender document, estimation. 2008-09 Project:
Bihar. Rs76.00 Cr. execution is in
progress.
53 Eastern Engineers, Tezpur University Water supply scheme – phase Surveying, design of ESR, commissioned
Guwahati – II -Rs 3.50 Cr WTP, Distribution network, sucessfully
detail engineering, preparation 2008-09
of drawings, supervision.

54 Public health Public health Multi-villages Water Supply Preparation of Detailed Completed.
Engineering Department, Engineering scheme for Fluoride – Project Report.
2009
Govt of Bihar. Department, Govt affected areas in Munger
of Bihar. District. – Project cost –
55 Public health Public health Construction of JagiRoad Detail engineering. Job completed
Engineering Department, Engineering Town water Supply scheme,
2009
Govt of Assam Department, Kokrajhar– Rs. 1.09Cr.
Govt of Assam.
56 Public health Four Star Construction of Effluent Detail engineering, execution. Job completed
Engineering Department, International Limited. treatment plant. – Rs, 0.7 Cr. Supplying and
2009
Govt of Assam Kolkata commissioning.

57 Pollution Control Org, Sunpack Industries Construction of Effluent Details Project report, detail Completed.
Kolkata. Limited, (Sunman treatment plant. – Rs. 1.00 engineering, execution and
Group Companies), Cr. commissioning. 2007 - 08
Chittagong,
Bangladesh.
58 Pollution Control Org, Reliance Industries Construction of Effluent Details Project report, detail Completed.
Kolkata. Limited, (Sunman treatment plant. – Rs. 1.50 Cr engineering, execution and
Group of companies), commissioning.
2007-08
Chittagong,
Bangladesh.

59 Watertech Fourstar International Construction of Textile Details Project report, detail Commissioned.
Ltd, Kolkata Effluent treatment plant. – engineering, execution and 2009-10
Rs. 2.50 Cr commissioning.
60 WaterTech IVRCL Construction of Water Detail engineering, supply, (1) plant at Ara
Infrastructures and treatment plant Rs. 2.50 Cr. erection, and commissioning. is
Projects ltd, commissioned.
Hyderabad. 2009 -10 (2) Plant at
Kishanganj and
Deoghar –
commissioned.

6 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


61 IVRCL Infrastructures Public Health Multi-villages Water Supply
Detail engineering, and Job Under
and Projects ltd, Engineering Deptt, preparation of working
scheme for Arsenic – affected progress.
Hyderabad Govt of Bihar areas in Maner, Bidupur & drawing, 30 MLD WTP at
2011-13
Buxar . Bidupur , 10 MLD at Buxar ,
8 MLD at Maner including
Jetty structure.
62 Techno Associates Public Health Drainage pumping station Detail engineering, Completed.
Engineering Deptt, cum Sewage Lifting station at preparation of drawing.
2009-2010
Govt of West Bengal New Town Kolkata. -
Rs. 12.50 Cr
63 IVRCL Infrastructures Public Health Ranchi water Supply Project- Design of Under ground Under progress
and Projects ltd, Engineering Deptt, Rs254 Cr storage tank, Elevated Service 2010
Hyderabad Govt of Jharkhand. reservoir, Pipe line.
64 Tantia Construction Public Health 14 MLD Capacity Sewage Design, detail engineering of Design is
Limited, DD -30 , Salt Engineering Deptt, Treatment Plant at Rajarhat plant units. completed. The
2011
Lake City, Kolkata – 700 Govt of West Bengal New town Complex- Rs.32 plant is
069 Cr commissioned.
65 The Executive Engineer, Public Health Drainage pumping station Detail engineering, Completed.
Public Health Engineering Deptt, cum Sewage Lifting station at preparation of drawing.
Engineering deptt, Govt Govt of West Bengal action area II E, New Town
of West Bengal, New Kolkata - Rs.11.00 Cr 2011
Town Kolkata, Kolkata
– 700069
66 The Executive Engineer, Public Health Drainage pumping station Detail engineering, Completed.
Public Health Engineering Deptt, cum Sewage Lifting station at preparation of drawing.
Engineering deptt, Govt Govt of West Bengal action area VII, New Town
of West Bengal, New Kolkata - 2010
Town Kolkata, Kolkata
– 700069
67 Shass Engineers Public Health Design of 4.5 MLD capacity Detail engineering, Plant completed
Guwahati. Engineering Deptt, Water treatment plant 4.50 Cr preparation of drawing. 2011 successfully.
Govt of Assam
68 Punj Lloyd Delta Pvt Public Health Multi-villages water supply Surveying, soil testing, detail Under progress
Ltd, New Delhi Engineering Deptt, scheme at Munger, Bihar – engineering, preparation of 2011
Govt of Bihar. Rs. 32 Cr working drawings.
69 Ramky Infrastructure, Asansol Durgapur Sewage Treatment plant - Design, detail engineering and Under progress
Kolkata. Development Rs.30 Cr preparation of working drawings
2011-12
Authority, Durgapur,
West Bengal
70 Eastern Railway: thru Eastern Railway, Raw water withdrawal Design, detail engineering and Job executed
Executing agency Asansol Division, facility and pipe line – preparation of working 2011-12 successfully
West Bengal Rs2.00 Cr drawings
71 Environtech East Pvt Ltd National Institute of Sewage treatment plant and Design, detail engineering and Completed.
Kolkata Technology, sewerage scheme – Rs.20.00 tender doc preparation 2010-11
Rourkela Cr including estimation
72 Public health Public health Multi-villages Water Supply Preparation of Detailed Completed.
Engineering Department, Engineering scheme for Arsenic – affected Project Report.
2011
Govt of Bihar. Department, areas in Bhojpur District. –
Govt of Bihar. Rs.170 Cr
73 Environtech East Pvt Ltd Deptt of Water & Sewage treatment plant and Design, detail engineering and Tendering
Kolkata In association Sanitation sewerage scheme – INR 150 tender doc preparation process is
2011-12
with Al –Hatmy,OMAN Department Cr including estimation completed.

7 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


74 Public health Public health Multi-villages Water Supply Preparation of Detailed Completed.
Engineering Department, Engineering scheme for Arsenic – affected Project Report., including, Tenders are in
2011-12
Govt of Bihar. Department, Govt of areas in Bhagalpur District. _ surveying, status report, process.
Bihar. Rs.220 Cr design & estimation.
75 Public health Public health Multi-villages Water Supply Preparation of Detailed Completed. Job
Engineering Department, Engineering scheme for Arsenic – affected Project Report, including, is in progress.
2011-12
Govt of Bihar. Department, Govt areas in Bhagalpur District. _ surveying, status report,
of Bihar. Rs.80 Cr / design & estimation.
76 Public health Public health Multi-villages Water Supply Preparation of Detailed Completed.
Engineering Department, Engineering scheme for Arsenic – affected Project Report, including, Tenders are in
2011-12
Govt of Bihar. Department, Govt areas in Begusarai District. _ surveying, status report, process.
of Bihar. Rs.180 Cr design & estimation.
77 Drinking Water & Drinking Water & Rural water Supply schemes Preparation of Detailed DPR completed.
sanitation Department, sanitation at Satbarwa & Bakoria , Project Report including soil World Bank
Govt Of Jharkhand. Department, Govt Of Palamau district testing, surveying, design, 201l2-13 assisted project.
Jharkhand estimation Tendering is in
process.
78 Drinking Water & Drinking Water & Rural water Supply schemes Preparation of Detailed In progress
sanitation Department, sanitation at Garwah Distt Project Report including soil
201l2-13
Govt Of Jharkhand. Department, Govt Of testing, surveying, design,
Jharkhand estimation
79 Drinking Water & Drinking Water & Rural water Supply schemes Preparation of Detailed In progress
sanitation Department, sanitation at Latehar distt Project Report including soil
201l2-13
Govt Of Jharkhand. Department, Govt Of testing, surveying, design,
Jharkhand estimation
80 Madhya Pradesh Jal Madhya Pradesh Jal Rural water Supply schemes Preparation of Detailed DPR is
Nigam Maryadit, Govt Nigam Maryadit, at Datia Distt. Project Report including soil completed.
2012-13
of Madhya Pradesh. Govt of Madhya testing, surveying, design, Tendering is in
Pradesh. estimation process.
81 Public health Public health Cheria Multi-villages Water Preparation of Detailed DPR completed.
Engineering Department, Engineering Supply scheme at Begusarai Project Report with Bid World Bank
Govt of Bihar. Department, District. – Rs.51.20 Cr Document assisted project.
2013
Govt of Bihar. Tendering is in
process.

82 Public health Public health Rajauli Multi-villages Water Preparation of Detailed DPR completed.
Engineering Department, Engineering Supply scheme at Nawada Project Report with Bid World Bank
2013
Govt of Bihar. Department, District. – Rs.84.82 Cr Document assisted project.
Govt of Bihar. Tendering is in
83 Public health Public health Silao Multi-villages Water Preparation of Detailed DPR completed.
Engineering Department, Engineering Supply scheme at Nalanda Project Report with Bid World Bank
2013
Govt of Bihar. Department, District. – Rs.61.26Cr Document assisted project.
Govt of Bihar. Tendering is in
84 Public health Public health Gogaghat Multi-villages Preparation of Detailed DPR completed.
Engineering Department, Engineering Water Supply scheme at Project Report with Bid World Bank
2013
Govt of Bihar. Department, West Champaran District. – Document assisted project.
Govt of Bihar. Rs.36.86 Cr Tendering is in
85 Drinking Water & Drinking Water & Jhunki Water Supply Scheme Preparation of Detailed Document
sanitation Department, sanitation at Dumka District. Project Report including soil Submitted
201l2-13
Govt Of Jharkhand. Department, Govt Of testing, surveying, design,
Jharkhand estimation

8 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


86 Drinking Water & Drinking Water & Bargar Water Supply Scheme Preparation of Detailed Document
sanitation Department, sanitation at Garwah District. Project Report including soil Submitted
Govt of Jharkhand. Department, Govt of testing, surveying, design, 201l2-13
Jharkhand estimation

87 Madhya Pradesh Jal Madhya Pradesh Jal Rural water Supply schemesPreparation of Detailed Documents
Nigam Maryadit, Govt Nigam Maryadit, at Indore – Dewas – Ujjain :
Project Report including soil submitted.
of Madhya Pradesh. Govt of Madhya Narmada _ Kshipra Link testing, surveying, design, 2013
Pradesh. project. - Rs. 630 cr. estimation, and detailing of
74.MLD WTP, Intake
88 Madhya Pradesh Jal Madhya Pradesh Jal Rural water Supply schemes Preparation of Detailed Completed.
Nigam Maryadit, Govt Nigam Maryadit, at Mangoali, Asoknagar Project Report including soil Tenders are in
2012-13
of Madhya Pradesh. Govt of Madhya testing, surveying, design, process.
Pradesh. estimation
89 Madhya Pradesh Jal Madhya Pradesh Jal Rural water Supply schemes Preparation of Detailed Completed.
Nigam Maryadit, Govt Nigam Maryadit, at Chargawan, Jabalpur Project Report including soil Tenders are in
2013-2014
of Madhya Pradesh. Govt of Madhya testing, surveying, design, process.
Pradesh. estimation
90 Drinking Water & Drinking Water & Hazaribagh Town Water Preparation of Detailed In progress.
sanitation Department, sanitation supply scheme. Project Report including soil
2013-2014
Govt of Jharkhand. Department, Govt of testing, surveying, design,
Jharkhand. estimation
91 Drinking Water & Drinking Water & Rural Piped Water Supply Preparation of Detailed In progress.
sanitation Department, sanitation Scheme for Upper Shankh Project Report including soil
2013 -
Govt of Jharkhand. Department, Gumla Dam and adjoining Villages. testing, surveying, design,
2014
Circle. Govt of Rs.= 52.00 Cr. estimation
Jharkhand.
92 Drinking Water & Drinking Water & Rural Piped Water Supply Preparation of Detailed In progress.
sanitation Department, sanitation Scheme for Kansjore Dam Project Report including soil
2013 -
Govt of Jharkhand. Department, Simdiga and adjoining Villages. Rs.= testing, surveying, design,
2014
Division. Govt of 56.00 Cr. estimation
Jharkhand.
93 Drinking Water & Drinking Water & Rural Piped Water Supply Preparation of Detailed In progress.
sanitation Department, sanitation Scheme for Ramrekha Dham Project Report including soil
Govt of Jharkhand. Department, Simdiga and adjoining Villages. Rs.= testing, surveying, design, 2014 -
Division. Govt of 53.00 Cr. estimation 2014
Jharkhand.

94 L & T Construction Sewage Treatment Development of suitable Preparation of Detailed Completed.


Water & Renuable Plant at kalyani for scheme for rehavilitation cum Design Calculation, Deta
Energy IC. WET SBG, KMDA, West augumentation of Sewage Sheet for all Mechanical
Kolkata Cluster Bengal. Treatment Plants Items.
(Upgradation of 6 MLD WSP
to 10 MLD Capacity 2014
Facultative Aerated Lagoon
based Plant and Renovation
of 11 MLD Capacity
Trickling Filter based
Treatment System)

9 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


95 Oddissi Innovations PHED, Govt of West Arsenic and Iron Removal Design , fabrication, supply, Project
Kolkata Bengal Plant 120 cum /hour capacity installation , construction of successfully
at 3 locations under North 24 foundations, erection and commissioned.
Praganas commissioning of Arsenic and 2014-15
Iron Removal Plant 120 cum
/hour capacity at 3 locations
under North 24 Praganas

96 Madhya Pradesh Jal Madhya Pradesh Jal Rural water Supply schemes Preparation of Detailed In progress
Nigam Maryadit, Govt Nigam Maryadit, at Nimrani, Khargone Project Report including soil
of Madhya Pradesh. Govt of Madhya testing, surveying, design, 2015-16
Pradesh. estimation
97 Madhya Pradesh Jal Madhya Pradesh Jal Rural water Supply schemes Preparation of Detailed In progress
Nigam Maryadit, Govt Nigam Maryadit, at Dabadi, Block -Jobat, Dist.- Project Report including soil
2015-16
of Madhya Pradesh. Govt of Madhya Alirajpur testing, surveying, design,
Pradesh. estimation
98 Madhya Pradesh Jal Madhya Pradesh Jal Vegalgaon-Sagbara- Preparation of Detailed In progress
Nigam Maryadit, Govt Nigam Maryadit, Sumniyawant Rural water Project Report including soil
of Madhya Pradesh. Govt of Madhya Supply schemes , testing, surveying, design, 2015-16
Pradesh. Block -Alirajpur, Sondwa, estimation
Katthiwada, Dist.-Alirajpur
99 Madhya Pradesh Jal Madhya Pradesh Jal Sagota-Sejawada-Hirapur Preparation of Detailed In progress
Nigam Maryadit, Govt Nigam Maryadit, Rural water Supply schemes, Project Report including soil
of Madhya Pradesh. Govt of Madhya Block -Alirajpur,Bhabra, testing, surveying, design, 2015-16
Pradesh. Jobat,Udaigarh, Katthiwada, estimation
Dist.-Alirajpur
100 Madhya Pradesh Jal Madhya Pradesh Jal Ramsingh ki Chouki-Daberi- Preparation of Detailed In progress
Nigam Maryadit, Govt Nigam Maryadit, Ghongsya Rural water Project Report including soil
of Madhya Pradesh. Govt of Madhya Supply schemes , testing, surveying, design, 2015-16
Pradesh. Block -Alirajpur, Jobat, estimation
Katthiwada, Dist.-Alirajpur
101 Madhya Pradesh Jal Madhya Pradesh Jal Malthoun Rural water Supply Preparation of Detailed In progress
Nigam Maryadit, Govt Nigam Maryadit, schemes , Project Report including soil
2015-16
of Madhya Pradesh. Govt of Madhya Block -Malthoun, testing, surveying, design,
Pradesh. Dist.-Sagar estimation
102 Rural Water Supply & Rural Water Supply & Rural Piped Water Supply Preparation of Detailed
Sanitation Organisation. Sanitation Project for 208 villages of Project Report including soil
Govt of Odisha. 2015-16 Completed.
Organisation. Dharmasala and Rasulpur Block testing, surveying, design,
Govt of Odisha. in the district of Jajpur estimation
103 Rural Water Supply & Rural Water Supply & Rural Piped Water Supply Preparation of Detailed
Sanitation Organisation. Sanitation Project for 228 different Project Report including soil
Govt of Odisha. 2015-16 Completed.
Organisation. villages of Badachana and testing, surveying, design,
Govt of Odisha. Dharmasala Block. estimation
104 Rural Water Supply & Rural Water Supply & Rural Piped Water Supply Preparation of Detailed Report
Sanitation Organisation. Sanitation Project to 42 villages in Nilgiri Project Report including soil completed.
Govt of Odisha. 2015-16
Organisation. block at Kathapal from River testing, surveying, design,
Govt of Odisha. Sono estimation
105 Rural Water Supply & Rural Water Supply & Rural Piped Water Supply Preparation of Detailed Report
Sanitation Organisation. Sanitation Project to 85 villages in Project Report including soil completed.
Govt of Odisha. 2015-16
Organisation. Kashinagar block at testing, surveying, design,
Govt of Odisha. Adarshanagar Dist. Gajapati estimation

10 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


106 Rural Water Supply & Rural Water Supply & Preparation of Detailed
Rural Piped Water Supply Report
Sanitation Organisation. Sanitation Project Report including soil
Project to 71 villages at completed.
Govt of Odisha. 2015-16
Organisation. testing, surveying, design,
Raygada under Raaygada block
Govt of Odisha. Dist. Gajapati estimation
107 Numaligarh Refinery Numaligarh Refinery Report on mitigation of Silt Study of the present status, Report
Limited, Golaghat, Limited, Golaghat, in Intake well and Raw water study of survey drawings 2016-17 completed.
Assam Assam water pipe ,preparation of reports.
108 State Project State Project Design, Buid, Operate and Preparation of Detailed Report
Management Unit , Management Unit , Transfer Multi-Village Water Project Report including completed.
Neer Nirmal Pariyojana, Neer Nirmal Supply Scheme, Greater surveying, design, estimation
Assam Pariyojana, Assam Mayang Piped Water Supply
2017-18
Govt. of Assam Govt. of Assam Scheme In Morigaon District
RWSSP – LIS World RWSSP – LIS World With Operation And
Bank Project ,Guwahati Bank Project Maintenance Period Of Five
,Guwahati Years.
109 State Project State Project Design, Buid, Operate and Preparation of Detailed Report
Management Unit , Management Unit , Transfer Multi-Village Water Project Report including completed.
Neer Nirmal Pariyojana, Neer Nirmal Supply Scheme, Amguri- surveying, design, estimation
Assam Pariyojana, Assam Gaurisagar Piped Water
2017-18
Govt. of Assam Govt. of Assam Supply Scheme In Sivasagar
RWSSP – LIS World RWSSP – LIS World District With Operation And
Bank Project ,Guwahati Bank Project Maintenance Period Of Five
,Guwahati Years.
110 State Project State Project Design, Buid, Operate and Preparation of Detailed Report
Management Unit , Management Unit , Transfer Multi-Village Water Project Report including completed.
Neer Nirmal Pariyojana, Neer Nirmal Supply Scheme, Greater surveying, design, estimation
Assam Pariyojana, Assam Jogighopa Piped Water
2017-18
Govt. of Assam Govt. of Assam Supply Scheme In
RWSSP – LIS World RWSSP – LIS World Bongaigaon District With
Bank Project ,Guwahati Bank Project Operation And Maintenance
,Guwahati Period Of Five Years.
111 Rural Water Supply & Rural Water Supply & Rural Piped Water Supply Preparation of Detailed In progress
Sanitation Organisation. Sanitation Project to 113 villages under Project Report including soil
Govt of Odisha. 2018-19
Organisation. Rairangpur block Dist. testing, surveying, design,
Govt of Odisha. Mayurbhanj estimation
112 Rural Water Supply & Rural Water Supply & Rural Piped Water Supply Preparation of Detailed In progress
Sanitation Organisation. Sanitation Project to 112 villages under Project Report including soil
Govt of Odisha. 2018-19
Organisation. Kushumi block Dist. testing, surveying, design,
Govt of Odisha. Mayurbhanj estimation
113 Rural Water Supply & Rural Water Supply & Rural Piped Water Supply Preparation of Detailed In progress
Sanitation Organisation. Sanitation Project to 218 villages under Project Report including soil
Govt of Odisha. 2018-19
Organisation. Jashipur block Dist. testing, surveying, design,
Govt of Odisha. Mayurbhanj estimation
114 Rural Water Supply & Rural Water Supply & Preparation of Detailed In progress
Sanitation Organisation. Sanitation Rural Piped Water Supply Project Report including soil
Govt of Odisha. 2018-19
Organisation. Project to 113 villages under testing, surveying, design,
Govt of Odisha. Danagadi block Dist. Jajpur estimation
115 Rural Water Supply & Rural Water Supply & Preparation of Detailed In progress
Sanitation Organisation. Sanitation Rural Piped Water Supply Project Report including soil
Govt of Odisha. 2018-19
Organisation. Project to 123 villages under testing, surveying, design,
Govt of Odisha. Bhogorai block Dist. Balasore estimation

11 of 11
SHORT LIST OF CONSULTANCY SERVICES RENDERED / WORK EXECUTED / IN PROGRESS
( UP DATED : 11.01.2019.)

Sl.No. Client Prime Client Project Responsibility Year Status


116 Rural Water Supply & Preparation of Detailed In progress
Sanitation Organisation. Rural Water Supply &
Rural Piped Water Supply Project Report including soil
Govt of Odisha. Sanitation
Project to 272 villages under testing, surveying, design, 2018-19
Organisation.
Hatadihi block Dist. Keonjhar estimation
Govt of Odisha.

117 Rural Water Supply & Rural Water Supply & Rural Piped Water Supply Preparation of Detailed In progress
Sanitation Organisation. Sanitation Project to 242 villages under Project Report including soil
Govt of Odisha. 2018-19
Organisation. Gashipura & Anandapur block testing, surveying, design,
Govt of Odisha. Dist. Keonjhar estimation
118 Rural Water Supply & Rural Water Supply & Rural Piped Water Supply Preparation of Detailed In progress
Sanitation Organisation. Sanitation Project to 138 villages under Project Report including soil
Govt of Odisha. 2018-19
Organisation. Saharapada block Dist. testing, surveying, design,
Govt of Odisha. Keonjhar estimation
Signature of authorized representative