District Development Committee, District Technical Office,Surkhet.


S.N.
1.1
1.2
1.3
1.4
1.5
1.6
1.7

2.1
2.2
2.3a
2.4a
2.5a
2.6a
2.3b
2.4b
2.5b
2.6b
3.1
3.2
3.3
3.4
3.5
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10

SUMMARY of RATE ANALYSIS 2071-72 (Surkhet)


Unit Contr.
Dept.
S.N.
Items
6. ROOFING WORK
m3
- 26 #
331.66
288.40 6.1 CGI sheet roof
"
- 26#
379.04
329.60 6.2 CGI sheet ridge
"
473.80
412.00 6.3 4mm ply.in 1.5" sal fr-ceiling
"
7. STEEL WORK
753.34
655.08
"
230.00
200.00 7.1 Barbed wire fencing 14#
"
2967.00
2580.00 7.2 Barbed wire fencing 12#
"
3800.75
3305.00 7.3 M.S. grill + paint
7.4 Iron angle with red oxide pa.
2. BRICK WORK
8. PLASTERING WORK
2
Brick soling in sand - flat
m
957.09
832.25 8.1 12.5mm c.plaster - 1:3 ceiling
- Edge
"
- 1:4 wall
1607.41
1397.75 8.2
a) For ground floor
8.3
- 1:6 wall
3
Brick mas.in c.m. - 1:3
m
13932.14 12114.90 8.4 20mm cement plaster - 1:3
- 1.4
"
13446.26 11692.40 8.5 Flush cem.pointing1:3- brick
8.6 Ruled cem.pointing1:3- brick
- 1.6
"
12992.01 11297.40 8.7 Flush cem point 1:3-stone
- mud
"
10405.66
9048.40 8.8 3 mm cement punning
b) Above ground floor
8.9 Porcelain glazed tile (wall)
Brick mas.in c.m. - 1:3
m3
14169.04 12320.90 8.10 Porcelain glazed tile (floor)
- 1.4
"
9. PAINTING WORK
13683.16 11898.40
- 1.6
"
13228.91 11503.40 9.1 2 Coat white wash - in ceiling
- mud
"
- in wall
10642.56
9254.40 9.2
3. STONE WORK
9.3 1 coat snocem (cement paint)
Stone soling in sand
m3
4387.25
3815.00 9.4 2 coat snocem (cement paint)
Stone mas.in c.m. - 1:4
"
9588.13
8337.50 9.5 1 coat paint - enamel
- 1:6
"
8737.13
7597.50 9.6 2 coat paint - enamel
- mud
"
- aluminium
3957.15
3441.00 9.7
- dry
"
- red oxide
3697.25
3215.00 9.8
4. WOODEN WORK
10 SANITARY WORK
Sal wood - chaukhat
m3
- 0.5"
215224.80 187152.00 10.1 GI Pipe laying
- beam
"
- 3/4"
186925.60 162544.00 10.2
2
1.5" sal fr. - shutters
m
- 1"
10763.43
9359.50 10.3
- 4mm glazed
"
7633.72
6638.02 10.4 HDP Pipe laying - 1/2"
- 4mm plywood
"
- 4"
5516.62
4797.06 10.5
- GI plain sheet
"
11. DEMOLISHING WORK
6221.65
5410.13
Mosquito net +listi
"
273.13
237.50 11.1 Demolishing - cem.plaster
Mosquito net +expend.+listi
"
- wall in mud
484.44
421.25 11.2
Mosquit.net+expen.+1.5"s.fr
"
- wall in c.m.
4455.50
3874.35 11.3
4mm glazed fixing+listi
"
- PCC
990.04
860.90 11.4
5. CONCRETE WORK
11.5
- RCC
PCC
- 1:3:6 crushed gr.
m3
10397.73
9041.50 11.6 Demolishing - slate roof
- 1:2:4 crushed gr.
"
12. MISCELLANEOUS
11964.31 10403.75
For RCC - PCC 1:2:4 cru.gr.
"
13206.31 11483.75 12.1 Cut tree of perim. 61-90cm
- PCC1:1:3 cru. gr. "
14654.16 12742.75 12.2 Cut tree of perim.120-180cm
- Reinforcement bar kg
116.50
101.30 12.3 25mm Sal Eaves board work
- form work slab
m2
492.17
427.97
- form work colum
"
586.47
509.97 12.4 Arch form work
- form work beam
"
807.27
701.97 12.5 Vertical form work
1.5" DPC 1:2:4 - crushed gr.
"
547.80
476.35 12.6 In 1.5"sal fr.- 4mm ply.sh.repl
75mm PCC 1:2:4 with finish
"
983.60
855.30 12.7 Reinf. For Window Chaukhat
Items
1. EARTHWORK
E/W exc.a)in gen. - soft
- BMS
b) in foun .- soft
- BMS
Earth fill
- soil compact
- stone
- sand

Unit

Contr.

m2
Rm
m2

775.80
675.23
2782.17

Rm
Rm
kg
kg

45.14
50.46
132.25
103.50

m2
"
"
"
"
"
"
"
"
"

343.79
295.38
271.95
411.27
164.51
192.11
206.11
206.77
2006.21
2142.32

m2
"
"
"
"
"
"
"

28.62
24.77
64.40
115.00
179.63
270.94
243.01

Rm
"
"
"
"

264.88
326.98
481.28
2.11
63.54

m2
m3
"
"
"
m2

49.68
487.60
975.20
1840.00
5060.00
74.52

no.
"
m2

1610.00
7360.00
4665.00

"
"
m2
kg

414.00
1290.53
0.00
124.43

ommittee, District Technical Office,Surkhet.

RATE ANALYSIS 2071-72 (Surkhet)


Dept.
674.61
587.16
2419.28
39.25
43.88
115.00
90.00
298.95
256.85
236.48
357.63
143.05
167.05
179.23
179.80
1744.53
1862.89
24.89
21.54
56.00
100.00
156.20
235.60
211.31
0.00
230.33
284.33
418.50
1.83

43.20
424.00
848.00
1600.00
4400.00
64.80
1400.00
6400.00
4056.52
360.00
1122.20
0.00
108.20

RATE ANALYSIS for F.Y. 2072/73


Items

Descript.

Unit

Quantity

U.Rate

Amount

1. EARTHWORK
Excavation of soft clay & silty soils including disposal
upto 10m lead and 1.5m lift
Item No.
1.1
1
Norms - 2(1) page 5
Earthwork in excav. : soft soil

per
cu.m.

Unskilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Excavation of hard clay and soils mixed with soft


moorum stones (upto 30mm size) including disposal
upto 10m lead and 1.5m lift

Unskilled
Equipment
3%of labour

Item No.
per
1.2
1
cu.m.
Norms - 2(2) page 5
Earthwork in excav. : B.M.Soil

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Excavation of soft soil, disposal upto 10m lead and


1.5m lift in foundation

Unskilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Item No.
1.3
1
Norms - 2(9) page 8
E/W excav.in found.- soft soil

per
cu.m.

Excavation for foundation drain, pipe line etc.in boulder


mixed soil, disposal (upto 10m lead and 1.5m lift)
Item No.
1.4
1
Norms - 2(14) page 9

per
cu.m.

Earthwork in excav. : B.M.Soil


Filling with ordinary soil in 15 cm thick layer and hand
compaction (haulage distance 10m) with sprinkling
water
Item No.
per
1.5
1
cu.m.
Norms - 2(25a) page 15
Earth filling - compaction work
Filling by stones in the foundation and levelling
including haulage distance upto 30m
Item No.
1.6
1
Norms - 6(5) page 39
Filling - stone

per
cu.m.

Filling by sand and hand compaction (haulage distance


10m) with sprinkling water
Item No.
1.7
1
Norms - 2(42) page 21
Filling - sand

Prepared By

per
cu.m.

m.d.

m.d.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Unskilled
m.d.
Bloc stone
cu.m.
Bond stone
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Unskilled
Sand

m.d.
cu.m.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

400.00

8.40
288.40
331.66
331.66

cu.m.
0.80

280.00

400.00

320.00
9.60

Unskilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Unskilled

0.70

329.60
379.04
379.04

cu.m.
1.00

400.00

12.00
412.00
473.80
473.80

cu.m.
1.59

400.00

400.00

400.00
1650.00
1650.00

600.00
1650.00
330.00
2580.00
2967.00
2967.00

400.00
2750.00

280.00
3025.00

cu.m.
0.70
1.10

cu.m.

200.00

200.00
230.00
230.00

cu.m.
1.50
1.00
0.20

636.00
19.08
655.08
753.34
753.34

cu.m.
0.50

400.00

3305.00
3800.75
3800.75

Approved By

Items

Descript.

Unit

Quantity

U.Rate

Amount

2. BRICK WORKS
Dry brick laying (soling) in sand
a) flat

Item No.
2.1
10
Norms - 11(15a) page 107
Brick soling - flat

per
sq.m.

Dry brick laying (soling) in sand


a) on edge (vertical)

Item No.
per
2.2
10
sq.m.
Norms - 11(15b) page 107
Brick soling - vertical
a. BRICK WORK IN MORTAR (for ground floor)
Chimney (bhatta) brick masonry works along with
supplying bricks making cement sand mortar and
construction of brick wall including haulage distance
upto 30m
a) 1:3
per
2.3a
1
Norms - 5(1.b.1 & 2a) page 31
Brick work in c.m. - 1:3

cu.m.

Chimney (bhatta) brick masonry works along with


supplying bricks making cement sand mortar and
construction of brick wall including haulage distance
upto 30m
a) 1:4
Item No.
per
2.4a
1
cu.m.
Norms - 5(1.b2 & 2a) page 32,33
Brick work in c.m. - 1:4
Chimney (bhatta) brick masonry works along with
supplying bricks making cement sand mortar and
construction of brick wall including haulage distance
upto 30m
a) 1:6
Item No.
per
2.5a
1
cu.m.
Norms - 5(1.b.3 & 2a) page 32,33
Brick work in c.m. - 1:6

Prepared By

skilled
m.d.
Unskilled
m.d.
Brick
nos.
Sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

600.00
400.00
13.50
2750.00

300.00
400.00
5670.00
1952.50
8322.50
9570.88
957.09

600.00
400.00
13.50
2750.00

600.00
1300.00
10125.00
1952.50
13977.50
16074.13
1607.41

skilled
m.d.
1.50
600.00
Unskilled
m.d.
2.20
400.00
Brick
nos.
560.00
13.50
Cement
m.t.
0.13 15000.00
Sand
cu.m
0.27
2750.00
Add.unskill
m.d.
0.20
400.00
Scaffolding 3% of add. Unskilled
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
cu.m.
per

900.00
880.00
7560.00
1950.00
742.50
80.00
2.40
12114.90
13932.14
13932.14

skilled
m.d.
1.50
600.00
Unskilled
m.d.
2.20
400.00
Brick
nos.
560.00
13.50
Cement
m.t.
0.10 15000.00
Sand
cu.m
0.28
2750.00
Add.unskill
m.d.
0.20
400.00
Scaffolding 3% of add. Unskilled
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
cu.m.
per

900.00
880.00
7560.00
1500.00
770.00
80.00
2.40
11692.40
13446.26
13446.26

skilled
m.d.
1.50
600.00
Unskilled
m.d.
2.20
400.00
Brick
nos.
560.00
13.50
Cement
m.t.
0.07 15000.00
Sand
cu.m
0.30
2750.00
Add.unskill
m.d.
0.20
400.00
Scaffolding 3% of add. Unskilled
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
cu.m.
per

900.00
880.00
7560.000
1050.00
825.00
80.00
2.40
11297.40
12992.01
12992.01

skilled
m.d.
Unskilled
m.d.
Brick
nos.
Sand
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

0.50
1.00
420.00
0.71

sq.m.
1.00
3.25
750.00
0.71

sq.m.

Approved By

Items
Chimney (bhatta) brick masonry works along with
supplying bricks making mud mortar and construction
of brick wall including haulage distance upto 30m

a) mud mortar
Item No.
per
2.6a
1
cu.m.
Norms - 5(1.b6 &2a) page 32,33
Brick work in mud mortar
b. BRICK WORK IN MORTAR (above ground floor)
Chimney (bhatta) brick masonry works along with
supplying bricks making cement sand mortar and
construction of brick wall including haulage distance
upto 30m
a) 1:3
Item No.
per
2.3b
1
cu.m.
Norms - 5(1.b1 & 2a) page 32,33
Brick work in c.m. - 1:3
Chimney (bhatta) brick masonry works along with
supplying bricks making cement sand mortar and
construction of brick wall including haulage distance
upto 30m
a) 1:4
Item No.
per
2.4b
1
cu.m.
Norms - 5(1b2 & 2b) page 32,33
Brick work in c.m. - 1:4
Chimney (bhatta) brick masonry works along with
supplying bricks making cement sand mortar and
construction of brick wall including haulage distance
upto 30m
a) 1:6
Item No.
2.5b
1
Norms - 5(1b3 & 2a) page 32,33
Brick work in c.m. - 1:6

per
cu.m.

Chimney (bhatta) brick masonry works along with


supplying bricks making mud mortar and construction
of brick wall including haulage distance upto 30m

a) mud mortar
Item No.
2.6b
1
Norms - 5(1b6 &2a) page 32,33
Brick work in mud mortar

Prepared By

per
cu.m.

Descript.
Unit Quantity U.Rate
skilled
m.d.
1.00
600.00
Unskilled
m.d.
1.70
400.00
Brick
nos.
560.00
13.50
mud
cu.m
0.42
300.00
Add.unskill
m.d.
0.20
400.00
Scaffolding 3% of add. Unskilled
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
cu.m.
per

Amount
600.00
680.00
7560.00
126.00
80.00
2.40
9048.40
10405.66
10405.66

skilled
m.d.
1.50
600.00
Unskilled
m.d.
2.20
400.00
Brick
nos.
560.00
13.50
Cement
m.t.
0.13 15000.00
Sand
cu.m
0.27
2750.00
Add.unskill
m.d.
0.70
400.00
Scaffolding 3% of add. Unskilled
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
cu.m.
per

900.00
880.00
7560.00
1950.00
742.50
280.00
8.40
12320.90
14169.04
14169.04

skilled
m.d.
1.50
600.00
Unskilled
m.d.
2.20
400.00
Brick
nos.
560.00
13.50
Cement
m.t.
0.10 15000.00
Sand
cu.m
0.28
2750.00
Add.unskill
m.d.
0.70
400.00
Scaffolding 3% of add. Unskilled
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
cu.m.
per

900.00
880.00
7560.00
1500.00
770.00
280.00
8.40
11898.40
13683.16
13683.16

skilled
m.d.
1.50
600.00
Unskilled
m.d.
2.20
400.00
Brick
nos.
560.00
13.50
Cement
m.t.
0.07 15000.00
Sand
cu.m
0.30
2750.00
Add.unskill
m.d.
0.70
400.00
Scaffolding 3% of add. Unskilled
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
cu.m.
per

900.00
880.00
7560.00
1050.00
825.00
280.00
8.40
11503.40
13228.91
13228.91

skilled
m.d.
1.00
Unskilled
m.d.
1.70
Brick
nos.
560.00
mud
cu.m
0.42
Add.unskill
m.d.
0.70
Scaffolding 3% of add. Unskilled
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
cu.m.
per

600.00
680.00
7560.00
126.00
280.00
8.40
9254.40
10642.56
10642.56

Checked By

600.00
400.00
13.50
300.00
400.00

Approved By

Items

Descript.

Unit

Quantity

U.Rate

Amount

3. STONE WORKS
Dry stone laying (soling) in sand

Item No.
3.1
1
Norms - 11(16) page 107
Stone soling in sand

per
cu.m.

Rubble masonry work including supply of hard stone


blocks preparing cement sand mortar and construction
of the wall upto 5m high haulage distance upto 10m
a) cement sand mortar 1:4

Item No.
3.2
1
Norms - 6a(2) page 35
Stone work in c.m. - 1:4

per
cu.m.

Rubble masonry work including supply of hard stone


blocks preparing cement sand mortar and construction
of the wall upto 5m high haulage distance upto 10m
a) cement sand mortar 1:6

Item No.
3.3
1
Norms - 6a(3) page 35
Stone work in c.m. - 1:6

per
cu.m.

Rubble masonry work including supply of hard stone


blocks preparing mud mortar and construction of the
wall upto 5m high haulage distance upto 30m
a) in mud mortar
Item No.
3.4
1
Norms - 6(2) page 36
Stone work in mud mortar

per
cu.m.

Rubble masonry work including supply of hard stone


blocks and construction of the wall upto 5m high
haulage distance up to 30m.
a) dry wall
Item No.
per
3.5
1
cu.m.
Norms - 6(1) page 36
Stone work - dry

Prepared By

skilled
m.d.
Unskilled
m.d.
stone
cu.m
Sand
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
cement
m.t.
Sand
cu.m
bl.stone
"
bond st.
"
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
cement
m.t.
Sand
cu.m
bl.stone
"
bond st.
"
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
bl.stone
cu.m
bond st.
"
mud
"
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
bl.stone
cu.m
bond st.
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

1.00
3.50
1.10
0.25

600.00
400.00
1650.00
2750.00

600.00
400.00
15000.00
2750.00
1650.00
1650.00

900.00
2000.00
2385.00
1237.50
1650.00
165.00
8337.50
9588.13
9588.13

600.00
400.00
15000.00
2750.00
1650.00
1650.00

900.00
2000.00
1590.00
1292.50
1650.00
165.00
7597.50
8737.13
8737.13

600.00
400.00
1650.00
1650.00
300.00

600.00
900.00
1650.00
165.00
126.00
3441.00
3957.15
3957.15

600.00
400.00
1650.00
1650.00

600.00
800.00
1650.00
165.00
3215.00
3697.25
3697.25

cu.m.
1.50
5.00
0.106
0.47
1.00
0.10

cu.m.
1.00
2.25
1.00
0.10
0.42

cu.m.
1.00
2.00
1.00
0.10

cu.m.

0.71

3815.00
4387.25
4387.25

cu.m.
1.50
5.00
0.159
0.45
1.00
0.10

600.00
1400.00
1815.00

Approved By

Items

Descript.

Unit

Quantity

U.Rate

Amount

4. WOODEN WORKS
Making and fixing seasoned sal wood chaukhat

Item No.
4.1
1
Norms - 10(1) page 75
Sal wood work - chaukhat

per
cu.m.

Making beams, rafter, purlin cross beams from seasoned


sal wood with fitting and fixing

Item No.
per
4.2
1
cu.m.
Norms - 10(17) page 90
Sal wood work - beam, rafter etc.
Making and fixing sal wood panelled shutters using 38
mm sal wood frame
Shutter size:
1.07m * 1.982 m=2.114 sq.m.
Hinges (Kabja) - 100 mm
bolt _1(Chheskini) - 100 mm
bolt _2(Chheskini) - 150 mm
lock
Item No.
4.3
2.114
Norms - 10(2) page 76
In 1.5" sal frame - shutters

per
sq.m.

Making and fixing 4 mm thick glazed shutter using sal


wood shutter of the size : 38 mm x 75 mm

skilled
m.d.
Unskilled
m.d.
wood
cu.m
holdfast
nos.
screw
nos.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
wood
cu.m
killa
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
wood
cu.m
hinges
nos.
bolt_1
nos.
bolt_2
nos.
lock
nos.
handle
nos.
Screws
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Item No.
per
4.4
2.23
sq.m.
Norms - 10(4) page 78
In 1.5" sal frame - 4 mm glazed

skilled
m.d.
Unskilled
m.d.
wood
cu.m
glass
sq.m.
hinges
nos.
bolts
nos.
handle
nos.
screws
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Making and fixing 4 mm commercial plywood flush


shutter ( plywood both sides ) in 38 mm sal wood
frame.
Shutter size :
1.092*2.058 = 2.245
lock
- special
hinges - 100 mm
bolts
- 100 mm
Item No.
per
4.5
2.245
sq.m.
Norms - 10(7) page 80,81
In 1.5"sal fr.- 4mm plywood shutter

skilled
m.d.
Unskilled
m.d.
wood
cu.m
Plywwod
sq.m.
hinges
nos
bolts
nos
lock
nos
screws
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

(Shutter size: 1.829m*1.22m)


hinges (Kabja) - 100 mm
bolts (Chheskini) - 100 mm

Prepared By

Checked By

34.00
600.00
3.40
400.00
1.10 144000.00
92.00
70.00
184.00
3.00

cu.m.
17.65
600.00
1.76
400.00
1.05 144000.00

cu.m.
10.00
600.00
1.00
400.00
0.084 144000.00
6.00
30.00
1.00
40.00
1.00
50.00
1.00
250.00
2.00
350.00

sq.m.
9.00
600.00
0.90
400.00
0.049 144000.00
1.085
762.00
8.00
30.00
4.00
40.00
2.00
350.00

sq.m.
7.00
600.00
0.70
400.00
0.0346 144000.00
4.65
180.00
3.00
30.00
2.00
40.00
1.00
250.00

sq.m.

20400.00
1360.00
158400.00
6440.00
552.00
187152.00
215224.80
215224.80
10590.00
704.00
151200.00
50.00
162544.00
186925.60
186925.60
6000.00
400.00
12096.00
180.00
40.00
50.00
250.00
700.00
70.00
19786.00
22753.90
10763.43
5400.00
360.00
7056.00
826.77
240.00
160.00
700.00
60.00
14802.77
17023.19
7633.72
4200.00
280.00
4982.40
837.00
90.00
80.00
250.00
50.00
10769.40
12384.81
5516.62

Approved By

Items
Making and fixing 26 # CGI plain sheet flush shutters
(CGI sheet both sides) in 38 mm sal wood frame.

Shutter size :
1.092*2.058 = 2.245 sq.m.
hinges - 100 mm
bolts - 100 mm
lock - special
Item No.
per
4.6
2.245
sq.m.
Norms - 10(9) page 82
In 1.5" sal frame - GI plain sheet
Fixing mosquito proof mesh net using listi.

Item No.
per
4.7
1
sq.m.
Norms - similar to 10(12) page 85
Mosquito net + listi
Fixing mosquito proof mesh net with expended metal
net using listi

Item No.
per
4.8
1
sq.m.
Norms - similar to 10(12) page 85
Mosquito net + expended net+listi
Making and fixing mosquito proof wire mesh net with
expended metal net flush shutter in 38 mm thick sal
wood frame.

Shutter size:
1.092*2.058 = 2.245 sq.m.
hinges - 100 mm
bolts - 150 mm
Item No.
per
4.9
2.245
sq.m.
Norms-10(10) page 83
Mosquito net+expended net+frame

Prepared By

Descript.
Unit
skilled
m.d.
Unskilled
m.d.
wood
cu.m
sheet
sq.m.
hinges
nos
bolts
nos
lock
nos
handle
nos
screws
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
mosquito net sq.m.
listi
r.m.
nails
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
net
sq.m.
exp.net
sq.m.
listi
r.m.
nails
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
wood
cu.m.
Mosq. net
sq.m.
exp. net
sq.m.
hinges
nos
bolt
nos
spring
nos
handle
nos
screws
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

Quantity U.Rate
7.00
600.00
0.70
400.00
0.0346 144000.00
4.65
400.72
3.00
30.00
2.00
40.00
1.00
250.00
1.00
350.00

sq.m.
0.06
0.006
1.05
4.05

Amount
4200.00
280.00
4982.40
1863.34
90.00
80.00
250.00
350.00
50.00
12145.74
13967.60
6221.65

600.00
400.00
132.00
10.00

36.00
2.40
138.60
40.50
20.00
237.50
273.13
273.13

600.00
400.00
132.00
175.00
10.00

36.00
2.40
138.60
183.75
40.50
20.00
421.25
484.44
484.44

5.00
600.00
0.50
400.00
0.026 144000.00
2.13
132.00
2.13
175.00
3.00
30.00
2.00
50.00
1.00
160.00
2.00
350.00

3000.00
200.00
3744.00
281.16
372.75
90.00
100.00
160.00
700.00
50.00
8697.91
10002.60
4455.50

sq.m.
0.06
0.006
1.05
1.05
4.05

sq.m.

sq.m.

Approved By

Items

Descript.

Making and fixing 4 mm thick glass using necessary listi.

Item No.
4.10
1
Norms-10 (11) b page 84
4 mm glazed fixing with listi

per
sq.m.

Unit

skilled
m.d.
Unskilled
m.d.
glass
sq.m.
listi
r.m.
nails
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Quantity
0.06
0.006
1.00
4.05

U.Rate

Amount

600.00
400.00
762.00
10.00

36.00
2.40
762.00
40.50
20.00
860.90
990.04
990.04

600.00
400.00
15000.00
2500.00
2600.00
2750.00

600.00
1600.00
3300.00
1625.00
624.00
1292.50
9041.50
10397.73
10397.73

600.00
400.00
15000.00
2500.00
2600.00
2800.00
2750.00

600.00
1600.00
4800.00
1300.00
572.00
308.00
1223.75
10403.75
11964.31
11964.31

600.00
400.00
15000.00
2500.00
2600.00
2800.00
2750.00

480.00
2800.00
4800.00
1300.00
572.00
308.00
1223.75
11483.75
13206.31
13206.31

600.00
400.00
15000.00
2600.00
2800.00
2750.00

480.00
2800.00
6000.00
1482.00
812.00
1168.75
12742.75
14654.16
14654.16

sq.m.

5. CONCRETE WORKS
Concreting of foundation, vertical faces walls (cement
concrete) including supply of materials and haulage
distance upto 30m.
a) P.C.C.(1:3:6)
Gravel_1 =40 mm gravel crushed
Gravel_2 =20 mm gravel crushed
Item No.
per
5.1
1
cu.m.
Norms-7.2(c) page 44
P.C.C. - 1:3:6

skilled
m.d.
Unskilled
m.d.
cement
m.t.
gravel_1
cu.m.
gravel_2
cu.m.
sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Concreting of foundation, vertical faces walls (cement


concrete) including supply materials and haulage
distance upto 30m
a) P.C.C.(1:2:4)
Gravel_1 =40 mm gravel crushed
Gravel_2 =20 mm gravel crushed
Gravel_3 =10 mm gravel crushed
Item No.
per
5.2
1
cu.m.
Norms-7.2(d) page 44
P.C.C. - 1:2:4

skilled
m.d.
Unskilled
m.d.
cement
m.t.
gravel_1
cu.m.
gravel_2
cu.m.
gravel_3
cu.m.
sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Concreting works of super structure deck slabs, beams


including supply of materials and haulage distance upto
30m.
a) P.C.C. 1:2:4
Gravel_1 =40 mm gravel crushed
Gravel_2 =20 mm gravel crushed
Gravel_3 =10 mm gravel crushed
Item No.
per
5.3
1
cu.m.
Norms-7(4)a page 46
PCC for RCC (1:2:4)

skilled
m.d.
Unskilled
m.d.
cement
m.t.
gravel_1
cu.m.
gravel_2
cu.m.
gravel_3
cu.m.
sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Concreting works of super structure deck slabs, beams


including supply of materials and haulage distance upto
30m.
a) P.C.C. 1:1.5:3
Gravel_1 =20 mm gravel crushed
Gravel_2 =10 mm gravel crushed
Item No.
per
5.4
1
cu.m.
Norms-7(4)b page 46
PCC for RCC (1:1:3)

skilled
m.d.
Unskilled
m.d.
cement
m.t.
gravel_1
cu.m.
gravel_2
cu.m.
sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Prepared By

Checked By

1.00
4.00
0.22
0.65
0.24
0.47

cu.m.
1.00
4.00
0.32
0.52
0.22
0.11
0.445

cu.m.
0.80
7.00
0.32
0.52
0.22
0.11
0.445

cu.m.
0.80
7.00
0.40
0.57
0.29
0.425

cu.m.

Approved By

Items

Descript.

Cutting, bending, placing in position as shown in the


drawing & binding by GI wire of reinforcement steel
bar for RCC works incl. haulage dist. upto 30m
Item No.
5.5
1000
Norms-7.5 page 47
Iron rod( TOR steel) for RCC

per
kg

Making wooden form work for slab and floor including


supply and selection of materials fixing, nailing according
to drawings, applying primer, placing separa- tors,
dismantling forms and hauling upto 30 m distance

Unit

skilled
m.d.
Unskilled
m.d.
Rebars
m.t.
bind.wire
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
Unskilled
wood
Nails

m.d.
m.d.
cu.m.
kg

Quantity
12.00
12.00
1.05
10.00

U.Rate

Amount

600.00
400.00
84000.00
110.00

7200.00
4800.00
88200.00
1100.00
101300.00
116495.00
116.50

600.00
400.00
33000.00
20.00

1032.00
1028.00
2169.75
50.00

kg
1.72
2.57
0.066
2.50

(Salvage value after using 6 times 0.25%i.e. 0.526*0.75/6)

Item No.
5.6
10
Norms-8(2a) page 55
Form work for slab

per
sq.m.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Making wooden form work including supply and


selection of materials fixing, nailing according to
drawings, placing separa- tors, dismantling forms and
hauling upto 30 m distance
Column height 3 - 4 m
Item No.
per
5.7
10
sq.m.
Norms-8(3c) page 56
Form work for column

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Making wooden form work including supply and


selection of materials fixing, nailing according to
drawings, placing separa- tors, dismantling forms and
hauling upto 30 m distance (beam height upto 0.30m)
Item No.
per
5.8
10
sq.m.
Norms-8(4a) page 57
Form work for beam

skilled
m.d.
Unskilled
m.d.
wood
cu.m.
killa
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

38 mm thick Damp Proof Course of cement concrete of


the ratio 1:2:4
Note :Sieved gravel crushed

skilled
m.d.
Unskilled
m.d.
cement
m.t.
sand
cu.m.
gravel12mm cu.m.
W.P.C.
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Item No.
5.9
10
Norms-18(9) page 188
1.5" D.P.C. (1:2:4)

per
sq.m.

75 mm thick plain cement concrete of ratio 1:2:4 with


cement punning all finish for floor
Note :Sieved gravel crushed
Item No.
per
5.10
10
sq.m.
Norms-11(d) page 97
75mm thick P.C.C. (1:2:4) with finish

Prepared By

skilled
Unskilled
wood
Nail

m.d.
m.d.
cu.m.
kg

skilled
m.d.
Unskilled
m.d.
cement
m.t.
sand
cu.m.
gravel 20mm cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

4279.75
4921.71
492.17

sq.m.
2.400
3.60
0.066
2.50

600.00
400.00
33000.00
20.00

5099.75
5864.71
586.47

sq.m.
4.00
6.00
0.066
2.50

600.00
400.00
33000.00
20.00

2400.00
2400.00
2169.75
50.00
7019.75
8072.71
807.27

600.00
400.00
15000.00
2750.00
2800.00
50.00

600.00
800.00
1800.00
467.50
952.00
144.00
4763.50
5478.03
547.80

600.00
400.00
15000.00
2750.00
2600.00

750.00
1200.00
3900.00
935.00
1768.00
8553.00
9835.95
983.60

sq.m.

1.00
2.00
0.12
0.17
0.34
2.88

sq.m.

1.25
3.00
0.26
0.34
0.68

sq.m.

1440.00
1440.00
2169.75
50.00

Approved By

Items

Descript.

Unit

Quantity

U.Rate

Amount

6. ROOFING WORKS
26 gause C.G.I. sheet roofing works with supply of
materials all complete

Item No.
6.1
10
Norms-9(1) page 69
CGI sheet roofing - 26 #

per
sq.m.

Making ridge of 26 gause C.G.I. plain sheet and fitting


with supply of materials all complete

skilled
m.d.
Unskilled
m.d.
CGIsheet
sq.m.
nutbolt
nos.
J-hook
nos.
bit.washer
nos.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Item No.
per
6.2
10
r.m.
Norms-9(2) page 69
CGI sheet ridge - 26 # (3' wide)

skilled
m.d.
Unskilled
m.d.
plain sheet
r.m.
nutbolt
nos.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Making various types of false ceiling in sal wood frame


of size 50mm*75mm (with 600*900 mm frame size)
using 4 mm commercial plywood
Ceiling size
9.75 x 3.65 = 35.68 sq.m.
Item No.
per
6.3
35.68
sq.m.
Norms-10(16a) page 89
Ceiling - 4mm plywood

skilled
m.d.
Unskilled
m.d.
wood
cu.m.
plywood
sq.m.
listi, killa
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

1.10
1.25
12.00
30.00
25.00
55.00

600.00
400.00
400.72
30.00
0.50

sq.m.
2.00
3.00
12.00
10.00

660.00
500.00
4808.61
0.00
750.00
27.50
6746.11
7758.03
775.80

600.00
400.00
289.29

1200.00
1200.00
3471.53
0.00
5871.53
6752.26
675.23

23.00
600.00
2.30
400.00
0.45 144000.00
37.50
180.00

13800.00
920.00
64800.00
6750.00
50.00
86320.00
99268.00
2782.17

Rm.

sq.m.

7. STEEL WORKS
G.I. barbed wire 14 # fencing with supply of materials
and fitting all complete
1kg = 10m
Item No.
7.1
100
Norms-24(6) page 240
Barbed wire 14# fencing

per
m

G.I. barbed wire 12 # fencing with supply of materials


and fitting all complete
1kg = 7m
Item No.
7.2
100
Norms-24(6) page 240
Barbed wire 12# fencing

per
m

Supply, fixing and fitting of MS grill with painting over


primer all complete
Item No.
per
7.3
1
kg
MS grill with painting with primer

Prepared By

skilled
m.d.
Unskilled
m.d.
barb.wire
Rm
Nails/hooks
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
barb.wire
Rm
Nails
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
grill

kg

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

1.076
5.380
110.00

600.00
400.00
9.80

645.60
2152.00
1078.00
50.00
3925.60
4514.44
45.14

600.00
400.00
14.00

645.60
2152.00
1540.00
50.00
4387.60
5045.74
50.46
43.88

115.00

115.00

Rm.
1.076
5.380
110.00

Rm.
1.000

kg

115.00
132.25
132.25

Approved By

Items
Supply, fixing and fitting iron angle with painting over
primer all complete
Item No.
per
7.4
1
kg
Iron angle with painting over primer

Descript.
Ms angle

Unit
kg

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Quantity
1.000

U.Rate
90.00

Amount
90.00

10

90.00
103.50
103.50

kg

8. PLASTERING WORKS
12.5 mm thick cement sand plastering works in ceiling
a) Cement sand ratio - 1:3
Item No.
per
8.1
100
sq.m.
Norms-12(1b) page 110
12.5mm cem. plaster in c.m. - 1:3 ceiling
12.5 mm thick cement sand plastering works
a) Cement sand ratio - 1:4
Item No.
per
8.2
100
sq.m.
Norms-12(1c) page 110
12.5mm cement plaster in c.m. - 1:4
12.5 mm thick cement sand plastering works
a) Cement sand ratio - 1:6
Item No.
per
8.3
100
sq.m.
Norms-12(1d) page 110
1/2" cement plaster in c.m. - 1:6
20 mm thick cement sand plastering works
a) Cement sand ratio - 1:3
Item No.
per
8.4
100
sq.m.
Norms-12(4a) page 112
20mm cement plaster in c.m. - 1:3
Flush cement pointing works in cement
sand ratio 1:3
a) In brick masonry
Item No.
per
8.5
100
sq.m.
Norms-14(1c) page 121
Flush cement pointing 1:3 - in brick

Prepared By

skilled
m.d.
Unskilled
m.d.
cement
m.t.
sand
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
cement
m.t.
sand
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
cement
m.t.
sand
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
cement
m.t.
sand
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
cement
m.t.
sand
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

15.00
20.00
0.625
1.28

600.00
400.00
15000.00
2750.00

9000.00
8000.00
9375.00
3520.00
29895.00
34379.25
343.79

600.00
400.00
15000.00
2750.00

7200.00
6400.00
8070.00
4015.00
25685.00
29537.75
295.38

600.00
400.00
15000.00
2750.00

7200.00
6400.00
5730.00
4317.50
23647.50
27194.63
271.95

600.00
400.00
15000.00
2750.00

8400.00
7600.00
14400.00
5362.50
35762.50
41126.88
411.27

600.00
400.00
15000.00
2750.00

6300.00
4800.00
2325.00
880.00
14305.00
16450.75
164.51

sq.m.
12.00
16.00
0.538
1.46

sq.m.
12.00
16.00
0.382
1.57

sq.m.
14.00
19.00
0.960
1.95

sq.m.
10.50
12.00
0.155
0.32

sq.m.

Approved By

Items
Ruled cement pointing works in cement sand ratio 1:3
a) In brick masonry
Item No.
per
8.6
100
sq.m.
Norms-14(1c) page 121
Ruled cement pointing 1:3 - in brick
Flush ruled pointing works in cement sand ratio 1:3
a) In stone masonry
Item No.
per
8.7
100
sq.m.
Norms-14(2c) page 122
Flush cement pointing 1:3 - in stone
3 mm thick fine cement rubbing works

Item No.
8.8
10
Norms-11(20) page 109
3mm cement punning

per
sq.m.

Porcelain glazed tile (wall) in 1:4 cement sand mortar

Note:tile- porcelain glazed tile 4" x 4"


Item No.
per
8.9a
10
sq.m.
Norms-11(7) page 103
Porcelain glazed tile in 1:4 (wall)
Porcelain glazed tile(Floor) in 1:4 cement sand mortar

Note:tile- porcelain glazed tile 4" x 4"


Item No.
per
8.10
10
sq.m.
Norms-11(7) page 103
Porcelain glazed tile in 1:4 (Floor)

Descript.
Unit
skilled
m.d.
Unskilled
m.d.
cement
m.t.
sand
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Quantity
10.50
18.00
0.155
0.32

skilled
m.d.
Unskilled
m.d.
cement
m.t.
sand
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

10.00
14.00
0.306
0.630

skilled
m.d.
Unskilled
m.d.
cement
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
tile
sq.m
cement
m.t.
sand
cu.m
wh.cement
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
tile
sq.m
cement
m.t.
sand
cu.m
wh.cement
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

U.Rate
600.00
400.00
15000.00
2750.00

Amount
6300.00
7200.00
2325.00
880.00
16705.00
19210.75
192.11

600.00
400.00
15000.00
2750.00

6000.00
5600.00
4590.00
1732.50
17922.50
20610.88
206.11

600.00
400.00
15.00

600.00
400.00
798.00
1798.00
2067.70
206.77

600.00
400.00
591.80
15000.00
2750.00
24.00

7800.00
1800.00
6509.80
840.00
418.00
77.47
17445.27
20062.06
2006.21

600.00
400.00
699.40
15000.00
2750.00
24.00

7800.00
1800.00
7693.40
840.00
418.00
77.47
18628.87
21423.20
2142.32

600.00
400.00
30.00
175.00

1125.00
550.00
660.00
154.00
2489.00
2862.35
28.62

sq.m.

sq.m.
1.00
1.00
53.20

sq.m.
13.00
4.50
11.00
0.056
0.152
3.228

sq.m.
13.00
4.50
11.00
0.056
0.152
3.228

sq.m.

11

9. PAINTING WORKS
2 coat white washing with gum in new surface
a) in ceiling
Item No.
per
9.1
100
sq.m.
Norms-13(1b) page 114
2 coat white washing a) in ceiling

Prepared By

skilled
m.d.
Unskilled
m.d.
chuna
kg
gum adhesive
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

1.875
1.375
22.00
0.88

sq.m.

Approved By

Items

Descript.

2 coat white washing with gum in new surface


a) in wall
Item No.
9.2
100
Norms-13(1b) page 114
2 coat white washing a) in wall

per
sq.m.

Water proof cement paint (Snowcem) application


a) in one coat
Item No.
9.3
100
Norms-13(12a) page 120
1 coat Snowcem painting

per
sq.m.

Water proof cement paint (Snowcem) application


a) in 2 coats
Item No.
9.4
100
Norms-13(12a,b) page 120
2 coats Snowcem painting

per
sq.m.

Prepared enamel paint application in addition to one base


or lining coat (primer)
a) in one coat
Item No.
9.5
100
Norms-13(5a,b) page 117
1 coat enamel painting

per
sq.m.

Prepared enamel paint application in addition to one base


or lining coat (primer)
a) in 2 coats
Item No.
9.6
100
Norms-13(5) page 117
2 coats enamel painting

per
sq.m.

Prepared alluminium paint application work

a) in 2 coats
Item No.
9.7
100
Norms-13(6) page 117
2 coats aluminium painting

Prepared By

per
sq.m.

Unit

skilled
m.d.
Unskilled
m.d.
chuna
kg
gum adhesive
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
Snowcem
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
Snowcem
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
primer
litre
enamel
litre
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
primer
litre
enamel
litre
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
Unskilled
m.d.
primer
litre
alumin.pnt
litre
Sand paper
nos.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

Quantity
1.50
1.10
22.00
0.88

U.Rate
600.00
400.00
30.00
175.00

900.00
440.00
660.00
154.00
2154.00
2477.10
24.77

600.00
400.00
70.00

2100.00
1400.00
2100.00
5600.00
6440.00
64.40

600.00
400.00
70.00

3900.00
2600.00
3500.00
10000.00
11500.00
115.00

600.00
400.00
400.00
620.00

4800.00
2000.00
3240.00
5580.00
15620.00
17963.00
179.63

600.00
400.00
400.00
620.00

7200.00
3200.00
3240.00
9920.00
23560.00
27094.00
270.94

600.00
400.00
400.00
660.00
10.00

6450.00
4300.00
3240.00
7101.60
40.00
21131.60
24301.34
243.01

sq.m.
3.50
3.50
30.00

sq.m.
6.50
6.50
50.00

sq.m.
8.00
5.00
8.10
9.00

sq.m.
12.00
8.00
8.10
16.00

sq.m.
10.75
10.75
8.10
10.76
4.00

sq.m.

Amount

12

Approved By

Items

Descript.

Unit

Quantity

U.Rate

Amount

13

10. SANITARY WORKS


15mm (0.5") dia. G.I. pipe ('B' class) laying including
fixing and fitting

Item No.
per
10.1
30
r.m.
Norms-17(4a) page 180
" dia. G.I. Pipe ('B' class) laying
20mm (3/4") dia. G.I. pipe ('B' class) laying including
fixing and fitting

Item No.
10.2
30
Norms-17(4a) page 180
3/4" dia. G.I. Pipe laying

per
r.m.

25mm (1") dia. G.I. pipe ('B' class) laying including fixing
and fitting

Item No.
10.3
30
Norms-17(4a) page 180
1" dia. G.I. Pipe laying

per
r.m.

20mm (1/2") dia. HDPE pipe laying with butt welded


joints including fittings

Item No.
10.4
1000
Norms-17(2) page 178
1/2"dia.H.D.P. pipe laying

per
r.m.

110mm (4") dia. HDPE pipe laying with butt welded


joints including fittings

Item No.
10.5
50
Norms-17(2) page 178
4"dia.H.D.P. pipe laying

Prepared By

per
r.m.

plumber
m.d.
0.50
helper
m.d.
1.00
unskilled
m.d.
1.00
red lead
0.10 of unskilled
miscellane.
0.025 of unskilled
pipe
r.m.
30.00
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
Rm.
per

600.00
400.00
400.00

plumber
m.d.
0.50
helper
m.d.
1.00
Unskilled
m.d.
1.00
red lead
0.10 of unskilled
miscellane.
0.025 of unskilled
pipe
r.m.
30.00
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
Rm.
per

600.00
400.00
400.00

plumber
m.d.
0.50
helper
m.d.
1.50
Unskilled
m.d.
1.50
red lead
0.10 of unskilled
miscellane.
0.025 of unskilled
pipe
r.m.
30.00
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
Rm.
per

600.00
400.00
400.00

plumber
m.d.
1.00
helper
m.d.
1.00
Unskilled
m.d.
2.00
fuel
litre
0.25
pipe
r.m.
1000.00
miscellane.
2.5% of unskilled
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
Rm.
per

600.00
400.00
400.00
65.50
0.00

600.00
400.00
800.00
16.38
0.00
20.00
1836.38
2111.84
2.11

plumber
m.d.
1.50
helper
m.d.
1.50
Unskilled
m.d.
3.00
fuel
litre
0.5
pipe
r.m.
50.00
miscellane.
2.5% of unskilled
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
Rm.
per

600.00
400.00
400.00
65.50
Err:509

900.00
600.00
1200.00
32.75

Checked By

192.00

246.00

366.00

300.00
400.00
400.00
40.00
10.00
5760.00
6910.00
7946.50
264.88

300.00
400.00
400.00
40.00
10.00
7380.00
8530.00
9809.50
326.98

300.00
600.00
600.00
60.00
15.00
10980.00
12555.00
14438.25
481.28

30.00
2762.75
3177.16
63.54

Approved By

Items
225mm dia. HDP pipe laying, fitting and fixing all
complete

Item No.
per
10.6
50
r.m.
Norms-17(2) page 178
225mm dia.HDP pipe laying and fixing

Descript.
Unit Quantity
Plumber
m.d.
2.00
helper
m.d.
2.00
unskilled
m.d.
4.00
equipment
days
2.00
Fuel
litre
1.00
miscellane. 2.51% of labor
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
Rm.
per

U.Rate
600.00
400.00
400.00
100.00
65.50
40.16

Amount
1200.00
800.00
1600.00
200.00
65.50
8.33
3873.83
4454.90
89.10

400.00

43.20

14

11. DISMANTLING WORKS


Dismantling cement or mortared plaster and removing
materials upto 10 m away from the site
Item No.
11.1
1
Norms-19(5) page 191
Dismantling : cement plaster

per
sq.m.

Dismantling mud mortared masonry wall and removing


materials upto 10 m away from the site
Item No.
11.2
1
Norms-19(1) page 191
Demolishing : wall in mud

per
cu.m.

Dismantling cement mortared masonry wall and


removing materials upto 10 m away from
the site
Item No.
per
11.3
1
cu.m.
Norms-19(2) page 191
Dismantling: wall in cement mortar
Dismanling P.C.C. or mortared concrete and removing
materials upto 10 m away from the site
Item No.
11.4
1
Norms-19(4) page 191
Dismanling : P.C.C.

per
cu.m.

Dismanling R.C.C. or R.B.C. works and removing


materials upto 10 m away from the site
Item No.
11.5
1
Norms-19(3) page 191
Dismanling : R.C.C.

Prepared By

per
cu.m.

Unskilled

m.d.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Unskilled

m.d.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Unskilled

m.d.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Unskilled

m.d.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Unskilled

m.d.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

0.108

43.20
49.68
49.68

sq.m.
1.06

400.00

424.00
487.60
487.60

cu.m.
2.12

400.00

400.00

cu.m.

1600.00

1600.00
1840.00
1840.00

cu.m.
11.00

848.00

848.00
975.20
975.20

cu.m.
4.00

424.00

400.00

4400.00

4400.00
5060.00
5060.00

Approved By

Items
Dismanling of tile (slate) roofing work including
removing, upto 10m and stacking in proper place

Item No.
per
11.6
1
Norms - 2041 Item 19(6) (Page191)
Dismanling of tile(slate) roofing

m2

Descript.
skilled
Unskilled

Unit
m.d.
m.d.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Quantity
0.054
0.081

U.Rate
600.00
400.00

Amount
32.40
32.40

15

64.80
74.52
74.52

m2

12. MISCELLANEOUS
Cutting tree and uprooting and removing them upto 15m
distance all complet
a) 61cm to 90 cm perimeter
Item No.
per
12.1
1
no.
Norms - 2041 Item 1(1c), 1(2c) Page 1,2
Cutting tree with perimeter 61-90cm
a) 121cm to 180 cm perimeter

Unskilled

m.d.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
unskilled

m.d.

Item No.
per
12.2
1
no.
Norms - 2041 Item 1(1e), 1(2e) Page 1,2
Cutting tree with perimeter 121-180cm

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

25mm th. Salwood Eaves board work

skilled
m.d.
Unskilled
m.d.
wood
m3
killa
L.S.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Item No.
per
12.3
10
m2
Norms - 2041 Item 10.19 (Page 91)
25mm th. Salwood Eaves board work
Form work for semi-circular arch of radius 1 to 3m
Item No.
per
12.4
10
Norms - 2041 Item 8(1f) Page 54
Arch form work

m2

Making wooden forms incld. Supply and selection of


materials at vertical surface, wall etc upto 4 m height and 0.5
m wide
Item No.
per
12.5
10
Norms - 2041 Item 8.2b (Page 55)
Vertical form work

Prepared By

m2

skilled
m.d.
Unskilled
m.d.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

3.500

400.00

1400.00
1610.00
1610.00

no.
16.000

400.00

6400.00
6400.00
7360.00
7360.00

sq.m.
1.43
600.00
0.143
400.00
0.275 144000.00

m2
3.000
4.500

1400.00

858.00
57.20
39600.00
50.00
40565.20
46649.98
4665.00

600.00
400.00

1800.00
1800.00
3600.00
4140.00
414.00

sq.m.

skilled

m.d.

1.44

600.00

864.00

Unskilled

m.d.

2.10

400.00

840.00

0.066 144000.00
2.500
20.00

9468.00
50.00
11222.00
12905.30
1290.53

wood
m3
killa
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

m2

Approved By

additional for Lock replacing per no


additional for handle replacing per no
additional for bolt replacing per no
additional for spring fitting per no
Item No.
per
12.60
1
sq.m.
Norms - 10(20c) page 91,92
In 1.5"sal fr.- 4mm plyw. shutter replace

Prepared By

Descript.
skilled
Unskilled
Plywood
skilled
skilled
skilled
skilled

Unit
m.d.
m.d.
sq.m.
md
md
md
md
L.S.

Nails
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

Quantity
0.108
0.011
1.05
0.67
0.10
0.04
0.10

sq.m.

U.Rate
600.00
400.00
180.00

Amount
64.80
4.40
189.00

16

add as per case

Items
Changing of old damaged plywood & re-fixing 4mm
th.commercial plywood in door all complete

258.20
296.93
296.93

Approved By

SUMMARY OF RATE ANALYSIS for Road works for F.Y. 2072/073


Items
Site clearance

Unit

Rate(Nrs.)
Contactor's Departmental
18.40
16.00
236.90
206.00
284.28
247.20
947.60
824.00
1895.20
1648.00
8054.60
7004.00
142.14
123.60
251.11
218.36
416.94
362.56
118.45
103.00
3122.25
2715.00
7670.39
6669.90
7395.42
6430.80
8761.85
7619.00
10198.20
8868.00
10658.20
9268.00
11444.80
9952.00
3318.49
2885.64
4795.89
4170.34
3381.18
2940.16
2599.00
2260.00
2639.25
2295.00
186967.00
162580.00
10501.80
9132.00
1028.39
894.25
536.97
466.93
553.68
481.46
254.90
221.65
116.44
101.25
11.85
10.30
139.57
121.37
142.14
123.60
309.43
269.07
151.83
132.03

Dry rubble masonry work


Rubble masonry 1:4 c/s mortar
Rubble masonry 1:6 c/s mortar
P.C.C. - 1:3:6 for Foundation rounded aggregate
P.C.C. - 1:2:4 for Foundation rounded aggregate
PCC for RCC (1:2:4) rounded aggregate
PCC for RCC (1:2:4) crushed aggregate
Gabion Box 2x1x1m
Gabion Box 3x1x1m
Gabion Box 3x1x0.5m
Gabion Box 3x1.5x0.75m
Rubble packing in Gabion box
Structural timber works for bridge beams/ pillars
Structural timberworks for bridge decks thickness 5cm
Rolling Charge
Base course 10cm solid thick (clay)
Base course 10cm solid thick (Stone dust)
Sub-base course 10cm solid thick.
Stone Edging (250mm*100mm)
Brushing
Prime coat
Tack coat
20 mm. th. Premix carpet
Seal coat

m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
box
box
box
box
m3
m3
m2
hrs.
m2
m2
m2
Rm
m2
m2
m2
m2
m2

Gravelling 15cm solid thickness including rolling

m2

365.73

318.03

Gravelling 15cm loose thickness without rolling

1835.18

1596

Dry stone soling without sand

4387.25

3815.00

Dry stone soling with sand


P.C.C. - 1:1.5:3 for Foundation rounded aggregate

5177.88

4502.50

m
kg

11052.65
116.50

9611
104.8

E/W exca. in Roadway , Drain & Structure's foundation : Ordinary Soil


E/W exca. in Roadway , Drain & Structure's foundation : Hard Soil
E/W exca. in Roadway , Drain & Structure's foundation : Ordinary Rock
E/W exca. in Roadway , Drain & Structure's foundation : Medium Rock

E/W exca. in Roadway & Drain :Hard Rock / chieselling


Slide clearance in Ordinary soil
Slide clearance in BMS
Slide claerance in Soft Rock
Construction of roadway embankments & miscellaneous backfilling

Cutting, bending,binding & placing in position of reinforcement bars

Q Q std * K * E (m3 / hr)


Where,
Q= Estimated Production
Qstd= Estimated standred Production
K=Bucket Factor
E=Job Effenciency
For PC-200 Qstd= 107 cum/hr
Correction factor K*E ( For soil type III) =0.54

Q 107.00 * 0.54 58.00(cum / hr )


Swing Angle Range (0)= 190
Convertion Factor of Backhoe,F=1.30

Cm t1 t 2 t 3 t 4

Where,

Cm=Cycle time
t1=Excavating Time
t2=Swing Time (Loaded)
t3=Dumping Time
t4=Swing Time (Empty)

For rough estimation , Cm can be found as:

Cm C m
Q q*

std

* F( s )

60 * 60
* K * E,
Cm

Cm 19.00 *1.30 24.70


Q 0.80

60 * 60
* 0.54 45.64cum / hr
24.70

1
1

0.022(
Q 45.64

Fuel Consumption l/hr for PC-200 Excavator= 12.00


Fuel Consumption ltr/cum for PC-200 Excavator= 0.0833
Lubricant required 1% cost of Fuel=
Rate Analysis
Description

UNIT

UNIT RATE

Labour
Unskilled

md

0.0047

400

ltr

0.19

81.00

hr

0.022

1800.00

Sub-Total
Materials
Disel
Lubricant
Sub-Total
Equipments
Excavator with breaker up to 150 HP
Sub-Total
Grand Total
Contractors overhead@ 15 %
Total

Road way Excavation


Provide Combination of mannual and machined excavation
Hard Soil

Percentage
Mannual Excavation

20

Machined Excavation

80

Overhaead @15%
Soft Rock

Percentage
Mannual Excavation

20

Machined Excavation

80

Medium Rock

Percentage
Mannual Excavation

20

Machined Excavation

80

Hard Rock

Percentage
Mannual Excavation

20

Machined Excavation

80

Average Rate for all types of Cutting I


Hard Soil

60

Soft Rock

30

Hard Rock

10

Average Rate for all types of Cutting I


Hard Soil

80

Soft Rock

20

Hard Rock

Fuel Consumption l/hr for PC-200 Excavator= 12.00


Fuel Consumption ltr/cum for PC-200 Excavator= 0.0833
Lubricant required 1% cost of Fuel=
Rate Analysis
DESC

UNIT

UNIT RATE

Labour
Unskilled

md

0.00469

360

ltr

0.0833

66.37

hr

0.022

1800.00

Sub-Total
Materials
Disel
Lubricant
Sub-Total
Equipments
Excavator
Sub-Total
Grand Total
Contractors overhead@ 15 %
Total

Landslide clearence
Provide Combination of mannual and machined excavation
Hard Soil

Percentage
Mannual Excavation

20

Machined Excavation

80

Overhead @15%
Total

Soft Rock
Mannual Excavation
Machined Excavation

Percentage
20
80

Mannual Excavation
Machined Excavation

Percentage
20
80

Hard Rock

Average Rate for all types of Cutting I


Hard Soil
Soft Rock
Hard Rock

70
30
0

Hard Soil
Soft Rock
Hard Rock

60
40
0

Average Rate for all types of Cutting I

Unskilled
m.d.
Equipment
3%of labour
Sub-Total
1 cu.m. Contract Rate (1.15)
Page 23 U.Rate without VAT
per

per

Laying sub-base course of sand mixed gravel (loose) including


loading & transporting mat., levelling surface & hauling up
to 10m. Distance 15cm loose thickness.
Item No.
35
Norms -NG.15(9) c. page 129
Gravelling loose without rolling 15 cm thickness

unkilled
Gravel
Roller

Unskilled
Equipment
per
1

Norms -Dolidar 10
Back filling
Gabion fabricatiomn (2x1x1) box size with Hexagonal
mesh size 100x120mm, Meshwire 10 SWG,Salvagewire
7 SWG and assembling of crates, gabions and placing
them in position including strectching, binding together
and tying down lid with 13SWG binding wire including
diaphragm
Item No.
18
Dolidar 44.1.B ii a/44.2.i a Page 50
Gabion Box 2x1x1m

m.d.

0.25

cu.m.
Page 22

skilled
unkilled
Mesh wire
Salvagewire
Bindingwire
per
1

Rubble packing in Gabion box

box

skilled
unkilled
Rubble
Item No.
22

Dolidar 45(Rivised)
Rubble packing in Gabion box

0.156
0.1575
0.000

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per sq.m.

Construction of roadway in embankments & miscellaneous back filling area with


approved materials obtain from borrow pits or from excavation for road construction
Item No.
10

m.d.
cu.m.
hrs.

per
1

cu.m.
Page 50

3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
m.d.
m.d.
Kg
Kg
Kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per box

m.d.
m.d.
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Total of gabion box &

ATE ANALYSIS for Road works for F.Y. 2072/073


Remarks

1
1

0.022( hr / cum)
Q 45.64

AMOUNT
1.88
1.88
15.39
0.15
15.54
39.60
39.60
57.02
57.02 (WO VAT)

Rate

Amount
247.20

49.44

57.02

45.62

Total

95.06
95.06

Rate

Amount
824.00
57.02

Total

45.62
45.62

Rate

Amount

1648.00
57.02
Total

329.60
45.62
375.22

Rate

Amount

7004.00
57.02
Total

1400.80
45.62
1446.42

95.06

57.03

45.62

13.68

1446.42

144.64

TOTAL

215.36

95.06

76.04

45.62

9.12

1446.42
TOTAL

0.00
85.17

AMOUNT
1.69
1.69
5.53
0.06
5.58
39.60
39.60
46.87
7.03
53.90 (WO VAT)

Rate

Amount
174.69

34.94

57.02

45.62

Total

80.55

12.083028
92.637

Rate
569
0.00
Total

Amount
113.71
0.00
113.71

Rate
Amount
4264
852.84
0.00
0.00
Total
852.84
80.55
113.7
852.84
TOTAL

56.39
34.11
0.00
90.50

80.55
113.71
852.84
TOTAL

48.33
45.48
0.00
93.82

10

0.53

320

320.00
1000.00
0.00

49.88
157.50
0.00

cu.m.

1316.70
1514
1514.2

320.00

80.00
2.40
82.40
94.76

Contract Rate (1.15)


U.Rate without VAT

sq.m.
0.39
0.27
23.43
2.88
0.75

530.00
320.00
90.00
90.00
90.00

0.30
0.75
1.10

530.00
320.00

Contract Rate (1.15)


U.Rate without VAT

1000

Contract Rate (1.15)


U.Rate without VAT
box

Total of gabion box & filling cost

11

.Y. 2072/073

18.4
206

8596.99

5957.74

2120.2

61538
18000
270
360

62.5

12

0.0833

0.022

57.02

49.44
45.61592
95.06

89.33
89.17
0.16

13

14

31304

15

169.6
5.088
174.688

174.688

206.70
86.40
2108.70
259.20
67.50
2728.50
3137.78
3137.78

159.00
240.00
1100.00
1499.00
1723.85
3447.7

6585.48

RATE ANALYSIS for Road works for F.Y. 2072/073


Items

Descript.

Site clearance (clearing and grubbing including the cutting of trees(only if Unskilled
necessary) having girth of less than 30cms when measured at 1m above the
ground)

Item No.
per
1
1
Sq.m.
Norms -Dolidar 1(Riv) Page 20, 90
Site clearance

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Excavation in Roadway, Drain and foundation for gabion & dry


wall structures in ordinary soil including removal & satisfactory
disposal of the materials upto a lead of 50m
Item No.
2

per
1

cu.m.
(Revi)
Page 21
E/W exca. in Roadway & Drain : Ordinary Soil
Norms -Dolidar 5.a

Excavation in Roadway, Drain and foundation for gabion & dry


wall structures in hard soil including removal & satisfactory
disposal of the materials upto a lead of 50m
Item No.
per
3
1
cu.m.
Norms -Dolidar 5.b
Page 21
E/W exca. in Roadway & Drain : Hard Soil
Excavation in Roadway, Drain and foundation for gabion & dry
wall structures in ordinary rock including removal & satisfactory
disposal of the materials upto a lead of 50m
Item No.
per
4
1
cu.m.
Norms -Dolidar 5.c
Page 21
E/W exca. in Roadway & Drain : Ordinary Rock

Unit
m.d.

Unskilled

m.d.

Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Unskilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Unskilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Excavation in Roadway, Drain and foundation for gabion & dry


Unskilled
m.d.
wall structures in medium rock including removal & satisfactory Equipment
disposal of the materials upto a lead of 50m
3%of labour
Item No.
per
Sub-Total
5
1
cu.m.
Contract Rate (1.15)
Norms -Dolidar 5.d
Page 21
U.Rate without VAT
E/W exca. in Roadway, Drain & fdn : Medium Rock
per
Excavation in Roadway, Drain and foundation in Hard
Rock by Chiselling and Wedging and tempering
Item No.
per
6
1
cu.m.
Norms -Dolidar 5.f
Page 21 (Revised)
E/W exca. in Roadway & Drain :Hard Rock/chiselling
Slide clerance in Ordinary soil

Item No.
7
1
Norms - NG 15.14.ka Page 152
Slide clerance in Ordinary soil

Prepared By

per
cu.m.

Unskilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Unskilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

Quantity
0.04

U.Rate
400.00

16.00
18.40
18.40

sq.m.

0.50

400.00

200.00
6.00
206.00
236.90
236.90

cu.m.
0.60

Amount
16.00

400.00

240.00
7.20
247.20
284.28

cu.m.
2.00

400.00

24.00
824.00
947.60
947.60

cu.m.
4.00

400.00

400.00

cu.m.

6800.00
204.00
7004.00
8054.60
8054.60

cu.m.

0.30

1600.00
48.00
1648.00
1895.20
1895.20

cu.m.
17.00

800.00

400.00

120.00
3.60
123.60
142.14
142.14

Approved By

RATE ANALYSIS for Road works for F.Y. 2072/073


Items
Slide clerance in gravel and boulder mixed soil

Item No.
8
1
Norms - NG 2.45.ka
Page 23
Slide clerance in BMS

per
cu.m.

Slide clerance in Soft Rock

Item No.
9
1
Norms - NG 2.45.kha Page 23
Slide clerance in Soft Rock

per
cu.m.

Construction of roadway in embankments & miscellaneous back


filling area with approved materials obtain from borrow pits or
from excavation for road construction
Item No.
10
1
Norms -Dolidar 10
Back filling

per
cu.m.
Page 22

Descript.
Unit
Unskilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Quantity
0.53

Unskilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

0.88

Unskilled
Equipment

m.d.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
skilled
m.d.
unkilled
m.d.
Rubble
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Uncourced rubble masonry work in 1:4 c/s mortar incl.


compansation for using specially dressed stones on the
face of walls with batter and making weep holes if nece.

skilled
m.d.
unkilled
m.d.
cement
bag
Sand
cu.m
Rubble
"
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

per
cu.m.

Uncourced rubble masonry work in 1:6 c/s mortar incl.


compansation for using specially dressed stones on the
face of walls with batter and making weep holes if nece.

Item No.
13
1
Norms -Dolidar 38.d
Page 40,56
Rubble masonry 1:6 c/s mortar

Prepared By

per
cu.m.

cu.m.

400.00

skilled
m.d.
unskilled
m.d.
cement
bag
Sand
cu.m
Rubble
"
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

352.00
10.56
362.56
416.94
416.94

sq.m.
0.25

Amount
212.00
6.36
218.36
251.11
251.11

400.00

3%of labour

Uncourced Dry rubble masonry work including full


compansation for using specially dressed stones on the
face of walls with batter and making weep holes if nece.
Item No.
per
11
1
cu.m.
Norms -Dolidar 38.a
Page 39
Dry rubble masonry work

Item No.
12
1
Norms -Dolidar 38.c
Page 40,56
Rubble masonry 1:4 c/s mortar

U.Rate
400.00

100.00
3.00
103.00
118.45
118.45

sq.m.

0.50
1.50
1.10

600.00
400.00
1650.00

300.00
600.00
1815.00
2715.00
3122.25
3122.25

600.00
400.00
670.00
2750.00
1650.00

900.00
1108.00
1554.40
1292.50
1815.00
6669.90
7670.39
7670.39

600.00
400.00
670.00
2750.00
1650.00

900.00
1108.00
1232.80
1375.00
1815.00
6430.80
7395.42
7395.42

cu.m.
1.50
2.77
2.32
0.47
1.10

cu.m.
1.50
2.77
1.84
0.50
1.10

cu.m.

Approved By

RATE ANALYSIS for Road works for F.Y. 2072/073


Items

Descript.

Unit

Cement Concrete Works (1:3:6) in foundation (Using


Rounded Aggregate). It includes mixing,placing in
position, vibrating, compacting,finishing,curing and all
other incidents.
Gravel_1 =40 mm gravel
Gravel_2 =20 mm gravel
Item No.
per
14
1
cu.m.
Dolidar 41.A.a
Page 46
P.C.C. - 1:3:6 for Foundation with round aggregate

skilled
m.d.
unkilled
m.d.
cement
bag
gravel_1
cu.m.
gravel_2
cu.m.
sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Cement Concrete Works (1:2:4) in foundation (Using


Rounded Aggregate). It includes mixing,placing in
position, vibrating, compacting,finishing,curing and all
other incidents.
Gravel_1 =40 mm gravel
Gravel_2 =20 mm gravel
Gravel_3 =10 mm gravel
Item No.
per
15
1
cu.m.
Dolidar 41.A.b
Page 46
P.C.C. - 1:2:4 for Foundation with round aggregate

skilled
m.d.
unkilled
m.d.
cement
bag
gravel_1
cu.m.
gravel_2
cu.m.
gravel_3
cu.m.
sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Cement Concrete Works (1:2:4) for RCC in


Superstructure (Using Rounded Aggregate)

skilled
m.d.
unkilled
m.d.
cement
bag
gravel_1
cu.m.
gravel_2
cu.m.
gravel_3
cu.m.
sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Gravel_1 =40 mm gravel


Gravel_2 =20 mm gravel
Gravel_3 =10 mm gravel
Item No.
per
16
1
cu.m.
Dolidar 41.B.a
Page 46,47
PCC for RCC (1:2:4) rounded aggregate
Cement Concrete Works (1:2:4) for RCC in
Superstructure (Using Crushed Aggregate)

Gravel_1 =40 mm gravel crushed


Gravel_2 =20 mm gravel crushed
Gravel_3 =10 mm gravel crushed
Item No.
per
17
1
cu.m.
Dolidar 41.B.a
Page 46,47
PCC for RCC (1:2:4)

Prepared By

skilled
m.d.
unkilled
m.d.
Cement
bag
gravel_1
cu.m.
gravel_2
cu.m.
gravel_3
cu.m.
sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

Quantity
0.75
3.50
4.40
0.65
0.24
0.47

U.Rate
600.00
400.00
670.00
1650.00
1900.00
2750.00

450.00
1400.00
2948.00
1072.50
456.00
1292.50
7619.00
8761.85
8761.85

600.00
400.00
670.00
1650.00
1900.00
2000.00
2750.00

450.00
1424.00
4288.00
858.00
418.00
220.00
1210.00
8868.00
10198.20
10198.20

600.00
400.00
670.00
1650.00
1900.00
2000.00
2750.00

450.00
1824.00
4288.00
858.00
418.00
220.00
1210.00
9268.00
10658.20
10658.20

600.00
400.00
670.00
2500.00
2600.00
2800.00
2750.00

450.00
1824.00
4288.00
1300.00
572.00
308.00
1210.00
9952.00
11444.80
11444.80

cu.m.
0.75
3.56
6.40
0.52
0.22
0.11
0.44

cu.m.
0.75
4.56
6.40
0.52
0.22
0.11
0.44

cu.m.
0.75
4.56
6.40
0.52
0.22
0.11
0.44

cu.m.

Amount

Approved By

RATE ANALYSIS for Road works for F.Y. 2072/073


Items
Gabion fabricatiomn (2x1x1) box size with Hexagonal
mesh size 100x120mm, Meshwire 10 SWG,Salvagewire
7 SWG and assembling of crates, gabions and placing
them in position including strectching, binding together
and tying down lid with 13SWG binding wire including
diaphragm
Item No.
per
18
1
box
Dolidar 44.1.B ii a/44.2.i a Page 50
Gabion Box 2x1x1m

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Gabion fabricatiomn (3x1x1) box size with Hexagonal


mesh size 100x120mm, Meshwire 10 SWG,Salvagewire
7 SWG and assembling of crates, gabions and placing
them in position including strectching, binding together
and tying down lid with 13SWG binding wire including
diaphragm
19
1
box
Dolidar 44.1.B.ii.b/44.2.i.b Page 50
Gabion Box 3x1x1m

skilled
m.d.
unkilled
m.d.
Mesh wire
Kg
Salvagewire
Kg
Bindingwire
Kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Gabion fabricatiomn (3x1x0.5) box size with Hexagonal


mesh size 100x120mm, Meshwire 10 SWG,Salvagewire
7 SWG and assembling of crates, gabions and placing
them in position including strectching, binding together
and tying down lid with 13SWG binding wire including
diaphragm
20
1
box
Dolidar 44.1.B.ii.d/44.2.ii.d Page 50
Gabion Box 3x1x0.5m

skilled
m.d.
unkilled
m.d.
Mesh wire
Kg
Salvagewire
Kg
Bindingwire
Kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Gabion fabricatiomn (3x1.5x0.75) box size with Rectangular


mesh size 1500x150mm, Meshwire 10 SWG,Salvagewire
7 SWG, Bindingwire 12 SWG without partion.
Item No.
per
21
1
box
Norms -NG16(9) kha Page 165
Gabion Box 3x1.5x0.75m

skilled
m.d.
unkilled
m.d.
gab. Wire
Kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Rubble packing in Gabion box

skilled
m.d.
unkilled
m.d.
Rubble
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Item No.
22
1
Dolidar 45(Rivised)
Page 50
Rubble packing in Gabion box

per
cu.m.

Structural timberworks for bridges, supply and fixing


of timber beams/pillars

Item No.
per
23
1
cu.m.
Norms -Dolidar 43.i
Page 48
Structural timber works for bridge beams/ pillars

Prepared By

Descript.
skilled
unkilled
Mesh wire
Salvagewire
Bindingwire

Unit
m.d.
m.d.
Kg
Kg
Kg

skilled
m.d.
unkilled
m.d.
Salwood
cu.m.
Nails
Kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

Quantity
0.39
0.27
23.43
2.88
0.75

U.Rate
600.00
400.00
94.00
94.00
94.00

2885.64
3318.49
3318.49

box
0.57
0.38
34.08
4.03
1.00

Amount
234.00
108.00
2202.42
270.72
70.50

600.00
400.00
94.00
94.00
94.00

342.00
152.00
3203.52
378.82
94.00
4170.34
4795.89
4795.89

600.00
400.00
94.00
94.00
94.00

234.00
108.00
2202.42
325.24
70.50
2940.16
3381.18
3381.18

600.00
400.00
94.00

300.00
80.00
1880.00
2260.00
2599.00
2599.00

600.00
400.00
1650.00

180.00
300.00
1815.00
2295.00
2639.25
2639.25

3.50
600.00
5.00
400.00
1.10 144000.00
4.00
20.00

2100.00
2000.00
158400.00
80.00
162580.00
186967.00
186967.00

box
0.39
0.27
23.43
3.46
0.75

box
0.50
0.20
20.00

box
0.30
0.75
1.10

cu.m.

cu.m.

Approved By

RATE ANALYSIS for Road works for F.Y. 2072/073


Items

Descript.

Structural timberworks for bridges, supply and fixing


of salwood decks of 5cm Thickness

Item No.
per
24
1
Sq.m.
Norms -Dolidar 43.iii. Page 48
Structural timberworks for bridge decks
Rolling Charge
Roller up to 20 ton

Item No.
25
1
Norms Rolling Charge

per
Hrs.

Laying base course of broken stone,sand and clay incl.


arranging stones in layers, spreading clay & hauling up to
10m. Distance.
10cm solid thickness.
Item No.
per
26
1
sq.m.
NG.15(12.1) d.
Page 131
Base course 10cm solid thick (using clay).
Laying base course of broken stone,screenings and
stonedust incl. arranging stones in layers, spreading
stonedust & hauling up to 10m. Distance. 10cm solid
thickness.
Item No.
per
27
1
sq.m.
NG.15(12.1) d.
Page 131
Base course 10cm solid thick (using stone dust).
Laying sub-base course of sand mixed gravel including
loading & transporting mat., levelling surface & hauling up
to 10m. Distance including rolling 10cm solid thickness.
Item No.
28
1
Norms -NG.15(9) a.
Page 129
Sub-base course 10cm solid thick.

per
sq.m.

Edging works incl. adjustment of line, levelling, making


trench by excavating soils or pitched road,piling stones
in order, foilling both sides of edging by soils and bench
compaction works complete.
Edging by stones (100mm wide & 250mm deep)
Item No.
per
29
1
R.m.
Norms-15(25) gha
Page 143
Stone Edging with 100mm250mm

Prepared By

Unit

skilled
m.d.
unkilled
m.d.
Salwood
cu.m.
Nails
Kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
Roller
hrs.
Diesel
Ltr.
Lubricant
10% of diesel
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
unkilled
m.d.
Coarse Aggr. cu.m.
Screenings
cu.m.
Bin.material
cu.m.
Roller
hrs.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
unkilled
m.d.
Coarse Aggr. cu.m.
Screenings
cu.m.
stone dust
cu.m.
Roller
hrs.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
unkilled
Gravel
Roller

m.d.
cu.m.
hrs.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
unkilled
Stone

m.d.
cum.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

Quantity

U.Rate

1.66
600.00
0.50
400.00
0.055 144000.00
0.80
20.00

sq.m.
1.00
5.00

500.00
71.68

60.00
333.25
66.50
3.60
3.58
466.93
536.97
536.97

400.00
2500.00
2800.00
845.91
894.25

60.00
333.25
74.48
10.15
3.58
481.46
553.68
553.68

400.00
1200.00
894.25

60.00
153.60
8.05

sq.m.
0.15
0.1280
0.009

221.65
254.90
254.90

sq.m.
0.15
0.025

R.m.

500.00
358.41

400.00
2500.00
2500.00
300.00
894.25

sq.m.
0.15
0.1333
0.0266
0.012
0.004

996.00
200.00
7920.00
16.00
9132.00
10501.80
10501.80

35.84
894.25
1028.39
1028.39

Hrs.
0.15
0.1333
0.0266
0.012
0.004

Amount

400.00
1650.00

60.00
41.25

101.25
116.44
116.44

Approved By

RATE ANALYSIS for Road works for F.Y. 2072/073


Items

Descript.

Cleaning topsurface by wire brush & broom before


pitching
On water bound macadom
Item No.
per
30
10
Sq.m.
Norms-15.16(a)
Page 135
Brushing
Applying priming coat including supply of materials
On base course

Unit

Quantity

unkilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
unkilled
wood
bitumin
Kerosen

m.d.
kg.
kg

0.25

U.Rate
400.00

400.00
9.00
80.00

30% of Bitumen quantity


per
31
10
Norms-15(18) kha
Prime coat

Sq.m.
Page 136

Tack coat application including supply of materials


On base course
per
32
10
Norms-15(17)b
Tack coat

Sq.m.
Page 135

Preparing of 20mm. th. Premix carpeting


with proper camber including rolling

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
unkilled
m.d.
wood
kg.
bitumin
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
unkilled
bitumin
Roller
aggregate-1
aggregate-2

Aggregate - 1 = 10mm
Aggregate - 2 = 6mm

Coarse sand
Item No.
per
33
10
Sq.m.
Norms-15(24.2) 24.1 Page 141/142
20 mm. th. Premix carpet
seal coat of coarse sand including rolling

per
34
10
Norms-15(23.b)
Page 140
Seal coat with coarse sand

Sq.m.

Laying sub-base course of sand mixed gravel including


loading & transporting mat., levelling surface & hauling up
to 10m. Distance including rolling 15cm solid thickness.
Item No.
per
35
1
sq.m.
Norms -NG.15(9) c.
Page 129
Gravelling 15cm solid thick with rolling

Laying sub-base course of sand mixed gravel (loose) including


Prepared By

m.d.
kg
hr.
cum.
cum.
cum.
kg

wood
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

unkilled
m.d.
sand
cum.
wood
kg
rollar
hr
bitumin
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per
unkilled
Gravel
Roller

m.d.
cu.m.
hrs.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

unkilled
Checked By

m.d.

400.00
9.00
80.00

80.00
180.00
976.00
1236.00
1421.40
142.14

400.00
80.00
894.25
2800.00
2800.00
2750.00
9.00

360.00
1232.00
89.43
322.00
210.00
261.25
216.00
2690.68
3094.28
309.43

400.00
2750.00
9.00
894.25
80.00

180.00
192.50
144.00
35.77
768.00
1320.27
1518.31
151.83

400.00
1200.00
894.25

76.00
230.40
11.63

sq.m.
0.90
15.40
0.10
0.115
0.075
0.095
24.0

sq.m.
0.45
0.07
16.00
0.04
9.60

sq.m.
0.19
0.1920
0.013

318.03
365.73
365.73

sq.m.

0.156

80.00
144.00
780.00
209.67
1213.67
1395.72
139.57

sq.m.
0.20
20.00
12.20

100.00
3.00
103.00
118.45
11.85

sq.m.
0.20
16.00
9.75

Amount

400.00

62.34
Approved By

RATE ANALYSIS for Road works for F.Y. 2072/073


Items
loading & transporting mat., levelling surface & hauling up
to 10m. Distance 15cm loose thickness.

Descript.
Gravel
Roller

Unit
cu.m.
hrs.

Item No.
per
35
1
sq.m.
Norms -NG.15(9) c.
Page 129
Gravelling loose without rolling 15 cm thickness

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Dry stone laying (soling) without sand

skilled
m.d.
Unskilled
m.d.
stone
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Item No.
3.1
1
Norms - 11(16) page 107
Stone soling in sand

per
cu.m.

Dry stone laying (soling) in sand

Item No.
3.1
1
Norms - 11(16) page 107
Stone soling in sand

skilled
m.d.
Unskilled
m.d.
stone
cu.m
Sand
cu.m
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

per
cu.m.

Cutting, bending, placing in position as shown in the


drawing & binding by GI wire of reinforcement steel
bar for RCC works incl. haulage dist. upto 30m
Item No.
5.5
1000
Norms-7.5 page 47
Iron rod( TOR steel) for RCC

skilled
m.d.
Unskilled
m.d.
Rebars
m.t.
bind.wire
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

per
kg

Cement Concrete Works (1:2:4) for RCC in


Superstructure (Using Crushed Aggregate)

skilled
m.d.
unkilled
m.d.
cement
bag
gravel_1
cu.m.
gravel_2
cu.m.
gravel_3
cu.m.
sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Gravel_1 =40 mm gravel crushed


Gravel_2 =20 mm gravel crushed
Gravel_3 =10 mm gravel crushed
Item No.
per
17
1
cu.m.
Dolidar 41.B.a
Page 46,47
PCC for RCC (1:2:4)
Excavation in Roadway, Drain and foundation for gabion & dry
wall structures in hard soil including removal & satisfactory
disposal of the materials upto a lead of 50m
Item No.
per
3
1
cu.m.
Norms -Dolidar 5.b
Page 21
E/W exca. in Roadway & Drain : Hard Soil

Cement Concrete Works (1:1.5:3) in foundation (Using


Rounded Aggregate). It includes mixing,placing in
position, vibrating, compacting,finishing,curing and all
other incidents.
Prepared By

Unskilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

skilled
unkilled
cement
gravel_1
Checked By

m.d.
m.d.
bag
cu.m.

Quantity
0.1575
0.000

U.Rate
1200.00
894.25

1595.81
1835.18
1835.18

sq.m.
1.00
3.50
1.10

600.00
400.00
1650.00

600.00
1400.00
1815.00
3815.00
4387.25
4387.25

600.00
400.00
1650.00
2750.00

600.00
1400.00
1815.00
687.50
4502.50
5177.88
5177.88

600.00
400.00
84000.00
110.00

7200.00
4800.00
88200.00
1100.00
101300.00
116495.00
116.50
104.80

600.00
400.00
670.00
2500.00
2600.00
2800.00
2750.00

450.00
1824.00
4288.00
1300.00
572.00
308.00
1210.00
9952.00
11444.80
11444.80

400.00

240.00

cu.m.
1.00
3.50
1.10
0.25

cu.m.
12.00
12.00
1.05
10.00

kg
0.75
4.56
6.40
0.52
0.22
0.11
0.44

cu.m.
0.60

7.20
247.20
284.28
284.28

cu.m.

0.75
3.56
6.40
0.57

Amount
189.00
0.00

600.00
400.00
670.00
2600.00

450.00
1424.00
4288.00
1482.00
Approved By

RATE ANALYSIS for Road works for F.Y. 2072/073


Items
Gravel_1 =20 mm gravel
Gravel_2 =10 mm gravel
Item No.
per
15
1
cu.m.
Dolidar 41.B.b
Page 47
P.C.C. - 1:1.5:3 for Foundation with round aggregate

Descript.
Unit
gravel_2
cu.m.
sand
cu.m.
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Quantity
0.29
0.42

Cutting, bending, placing in position as shown in the


drawing & binding by binding wire of reinforcement steel
bar for RCC works incl. haulage dist. upto 30m

skilled
m.d.
Unskilled
m.d.
Rebars
m.t.
bind.wire
kg
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

12.00
12.00
1.05
10.00

Item No.
5.5
1000
Norms-7.5 page 47
Iron rod( TOR steel) for RCC

per
kg

26 gause C.G.I. sheet roofing works with supply of


materials all complete

skilled
Unskilled
color 'CGIsheet

Item No.
6.1
10
Norms-9(1) page 69
CGI sheet roofing - 26 #

per
sq.m.

Back filling with approved materials obtain from


borrow pits excluding excavation.
Item No.
10
1
Norms -Dolidar 10
Back filling

Prepared By

per
cu.m.
Page 22

m.d.
m.d.
sq.m.
nos.
nos.
nos.

nutbolt
J-hook
bit.washer
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

skilled
m.d.
Equipment
3%of labour
Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Checked By

U.Rate
2800.00
2750.00

Amount
812.00
1155.00
9611.00
11052.65
11052.65

600.00
400.00
84000.00
110.00

7200.00
4800.00
88200.00
1100.00
101300.00
116495.00
116.50
104.80

600.00
400.00
520.33
10.00
18.00
20.00

660.00
500.00
6244.02
300.00
450.00
1100.00
9254.02
10642.12

cu.m.

kg

1.10
1.25
12.00
30.00
25.00
55.00

1064.21

sq.m.
0.25

sq.m.

600.00

150.00
4.50
154.50
177.68
177.68

Approved By

10

Prepared By

Checked By

Approved By

11

2.32
250

Prepared By

Checked By

Approved By

12

Prepared By

Checked By

Approved By

13

1452
484
2401.7
249.1
4586.8
5274.82
5960.5466
596.05466
2388.472

Prepared By

Checked By

Approved By

14

density of stone dust= 2600kg/cum


31.2
0.03
3.07

Prepared By

Checked By

95.91

Approved By

15

87.6

151.42

1518.311
151.8311

0.1575
2120.2

2120.2

Prepared By

Checked By

Approved By

16

1595.809524
33

0.1575

0.71

Prepared By

Checked By

Approved By

17

116495
101.3

Prepared By

Checked By

Approved By

Rate Analysis

Earthwork Excavation by Excavator


Hydraulic Excavator up to 0.80 cum capacity
1) Soft soil
DESC

Labour
Unskilled
Sub-Total
Materials
Disel

UNIT

UNIT RATE

md

0.00469

ltr

0.1248

Lubricant
Sub-Total
Equipments
Excavator
hr
Sub-Total
Grand Total
Contractors overhead@ 15 %
Total

AMOUNT

0.00
0.00
105.00

13.10
0.13
13.24

0.0104

1857.42

19.32
13780
19.32
459.3333
32.55
57.41667
0.00
32.55 (WO VAT)

Provide Combination of mannual and machined excavation


PercentageRate
Amount
Mannual Excavation
20
206.00
41.20
Machined Excavation
80
32.55
26.04
Total
67.24

Hydraulic Excavator up to 0.80 cum capacity


1)Hard soil
DESC

UNIT

Labour
Unskilled
md
Sub-Total
Materials
Disel
ltr
Lubricant
Sub-Total
Equipments
Excavator
hr
Sub-Total
Grand Total
Contractors overhead@ 15 %
Total

UNIT RATE

AMOUNT

0.00
0.00
0.15

105.00

0.0125

1857.42

15.75
0.16
15.91
23.22
23.22
39.13
0.00
39.13 (WO VAT)

Provide Combination of mannual and machined excavation


PercentageRate
Amount
Mannual Excavation
20
247.20
49.44
Machined Excavation
80
39.13
31.30
Total
80.74

Hydraulic Excavator up to 0.80 cum capacity


1) Soft Rock
DESC

UNIT

UNIT RATE

AMOUNT

Labour
Unskilled
md
0.00
Sub-Total
0.00
Materials
Disel
ltr
0.2064
105.00
21.67
Lubricant
0.22
Sub-Total
21.89
Equipments
Excavator
hr
0.0172
1857.42
31.95
Sub-Total
31.95
Grand Total
53.84
Contractors overhead@ 15 %
0.00
Total
53.84 (WO VAT)
Provide Combination of mannual and machined excavation
PercentageRate
Amount
Mannual Excavation
20
824.00
164.80
Machined Excavation
80
53.84
43.07
Total
207.87
Hydraulic Excavator up to 0.80 cum capacity
1) Hard Rock
DESC

UNIT

UNIT RATE

AMOUNT

Labour
Unskilled
md
0.00
Sub-Total
0.00
Materials
Disel
ltr
0.2724
105.00
28.60
Lubricant
0.29
Sub-Total
28.89
Equipments
Excavator
hr
0.0227
1857.42
42.16
Sub-Total
42.16
Grand Total
71.05
Contractors overhead@ 15 %
0.00
Total
71.05 (WO VAT)
Provide Combination of mannual and machined excavation
PercentageRate
Amount
Mannual Excavation
20
7004.00
1400.80
Machined Excavation
80
71.05
56.84
Total
1457.64

S.N.

Description
A. LABOUR RATE

1
2
3
4
5

Skilled (carpenter, mason)


Skilled for blacktopping work
Helper
Unskilled
Painter
B. MATERIAL RATE

1
2
3
4
5
6
7
8
9
10
11
12

Bricks 1st class


Stone
Gravel crushed (broken) - 10 mm
"
" -20mm
"
" -40mm
Gravel uncrushed (round) -5- 10 mm
"
" -5 to 20mm
"
" -5 to 40mm
"
" -5 to 70mm
Natural gravel
Sand
Mud
Sal wood
Kukath (Local wood)
Wooden Listi
Firewood dry

13
14
15 Commercial plywood - 3 mm
15.1 Stone dust
16 Cement Indian 53 grade OPC
17 Cement Nepali
18 Cement Nepali
19 Cement Indian 53 grade OPC
20 Cement white
21 Iron rod (Fe-415 steel)
22 M.S. binding wire
23 Collapsible shutter
24 Rolling shutter 20 #
25 Barbed wire12# (1kg = 7m)
26 Barbed wire14# (1kg = 10m)
27 Angle Iron
28 MS grill

CONSTRUCTION MATERIAL RATES for


Unit
Rate
S.N.
m.d.
"
"
"
"
no.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
Rm.
kg
sq.m.
cu m
bag
bag
m3
mt
mt
Mt
kg
Sq.ft
Sq.ft
Rm.
Rm.
kg
kg

600.00
600.00
400.00
400.00
600.00
13.50
1650.00
2800.00
2600.00
2500.00
2000.00
1900.00
1650.00
1300.00
1200.00
2750.00
300.00
144000.00
33000.00
10.00
9.00
180.00
845.91
750.00
670.00
20100.00
15000.00
24000.00
84000.00
110.00
420.00
325.00
14.00
9.80
90.00
115.00

39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74

29
30
31
32
33
34
35
36
37
38

Hinges 3"
Hinges - 4"
Bolts - 4"( Cheskani )
" - 6" Aluminium
Holdfast 9" long
Lock -special Aluminium
Handle special 6'' aluminium
Door spring
Nails
Screw 1''

no.
no.
no.
no.
no.
no.
no.
no.
kg
no.

25.00
30.00
40.00
50.00
70.00
250.00
350.00
160.00
20.00
3.00

75
76
77
78
79
80
81
82
83
84

ERIAL RATES for 2072-73


Description
Nut bolt 8mm
J - hook 8'' aluminium
Bitumen washer
Nut bolt with washer
Mosquito net - Indian commercial
"
- expanded( brass)
Glass - 4mm white
Glass - 4mm black
Glass - 3.5mm
CGI sheet 26 # (6'x2'6")
CGI corrugated sheet 26#
CGI plain sheet 26# (0.9)
Gabion wire medium(12#)
CGI sheet 26 # (6'x2'6") colored
CGI plain sheet 26# (0.9) colored
Porcelin Glazed wall tile 6"x4"
Porcelin Glazed floor tile 6"x4"
3 mm marble chips(~1450kg/cum)
Oxalic acid
Wax polish(main Polish)
Marble
Lime
Snowcem(cem. paint)
Febicol Adhesive
Enamel
Varnish
Aluminium paint
Tarpentile
Water proof compound
Primer wood
Red oxide
Sand paper
Karborandum stone
GI pipe 'B' class - 1/2"
"
"
- 3/4"
"
"
- 1"

Unit

Rate

kg
no.
no.
Kg
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
Bundle
sq.m.
Rm.
kg
Bundle
Rm.
sq.m.
sq.m.
cu.m.
kg

175.00
30.00
0.50
195.00
132.00
175.00
762.00
900
714
6700.00
400.72
289.29
94.00
8850
410.02
591.80
699.40
20300.00
138.00

kg
m2
kg
kg
kg
litre
litre
litre
litre
kg
litre
kg

445.00

nos
nos
Rm.
Rm.
Rm.

30.00
70.00
175.00
620.00
450.00
660.00
180.00
50.00
400.00
400.00
10.00
550.00
192.00
246.00
411.60

"
"
- 11/4"
"
"
- 11/2"
"
"
- 2"
"
"
- 21/2"
HDP pipe
- NS
Water tank Gintex or equivalent
Petrol
Kerosene oil
Price of truck
Bitumin 80/100
Disel

Rm.
Rm.
Rm.
Rm.
kg
litre
litre
litre
no.
Kg
litre

465.15
636.30
812.70
1107.75
0.00
92.04
71.68
80.00
71.68

13.71428571
Medium class

16mm

3.286

87600

87.6
2.862
90.462

Npj rate per kg


Transporation

750

cf=j=2070071 sf] ;"v]{t lhNnfsf] :jLs't lhNnf b//]^

s| ;

2
3
4
5
6
7
8
9
10
11
12

13
14

laj/0f

O{f 9'jfgL ;d]t

lsl;d
k|yd >]0fL
-Pg=P;=
)!)#%_
6'qm||||f O{f

:6f]g 8:6
df6f]

15
lul gtf]8]sf] -vf]nf jf
vfgLjf6 rfnL ;fO{h cg';f/
lgsflnPsf]_

rfd|f]
!) Pd=Pd=, lh/f
@) Pd=Pd=
$) Pd=Pd= / ;f]
eGbf dfyL
vf]nfdf rfn]sf]
% b]lv !)
ld=ld=
% b]lv ;Dd
@)
ld=ld=
% b]lv ;Dd
$)
ld=ld=
;Dd
% b]lv &)
ld=ld= ;Dd
vf]nfdf grfn]sf]

afn'jf

/fd|f]
;fn

17

k|lt xhf/

k|lt
3=ld=
k|lt
kmf]?jfaf]N8/
3=ld=
9'f
sfaf{]/]G8d
k|lt yfg
k|lt
dfa{n lrK;\
s]=hL=
Plh :6f]g
%x(x#
k|lt yfg
Plh :6f]g a]08
%x(x#
k|lt yfg
k|lt
9'f sf] jfon 6fon ggkf]ln;
ju{k|lt
lkm6
9'fsf] jfon 6fon kf]ln;
ju{ lkm6
k|lt
5fgfe'O df k|of]u
x'g]9'fsf] 6fon ggkf]ln';
ju{ lkm6
k|lt
5fgfe'O df k|of]u
x'g]9'fsf] 6fon kf]ln';
ju{ lkm6
cf/ ;L ;L rf}sf];,emofn tyf
k|lt
9f]sfsf] nflu ;fO{h $ O{Gr
ju{
lkm6
* 2.75 O{Gr
k|lt
cf/ ;L ;L e]G6Ln]zg ;fO{h
$ O{Gr *2.75 O{Gr
ju{ lkm6
k|lt
cf/ ;L ;L cf/s km|]d ;fO{h
$ O{Gr *2.75 O{Gr
ju{ lkm6
9'fsf] O{6f
k|lt yfg

lul tf]8]sf]

16

PsfO{

sf7

l;;f}
s'sf7-;fn / l;;f}
jfx]s_

k|lt
3=ld=
k|lt
3=ld=
,, ,,
,, ,,

19

l;d]G6 - %) s]=hL= af]/f_

jf6/ k'|lkm sDkfp08


jf6/ k'|lkm sDkfp08
l;lnsf l;d]G6 P8ldS;r/

l;d]G6 P8ld:r/

kmnfd] 58 - Pkm=O{= $!%_ ;j} ;fO{hsf]


20

kmnfd] 58 -l6 Pd l6 %))_ * ld ld

12000

13500

2000

2300

2400

1100

1400

1650

550

550

550

14

14

14

35

35

35

52

52

52

67

67

67

90

90

90

69

70

70

100

100

100

200

200

200

200

200

200

400

400

400

30

30

afFs]sf] l:js[t
afFs]sf] l:js[t b//]6 b//]6
df 9'jfgL hf]l8 sfod df 9'jfgL hf]l8
x'g]
sfod x'g]

30

afFs]sf] l:js[t
b//]6
df 9'jfgL
hf]l8 sfod
x'g]

250

300

300

2400

2800

1800

2200

2600

,, ,,

1700

2100

2500

,,
,,
,,
,,
,,
,,
,,
,,

1500

1700

2000

1400

1600

1900

1200

1400

1650

900

1100

1300

800

1000

1200

2300

2500

2750

95000

123480

144000

65000

70000

77000

25000

30000

33000

,,
,,
,,
,,
,,
,,
,,
,,

ef/tLo %# u|]8

18

10500

2000

,, ,,
k|lt
bfp/f
s]=hL=
afF;
k|lt 3gf
k|lt af]/f
g]]kfnL $# u|]8
g]]kfnL %# k|lt af]/f
u|]8
k|lt af]/f
ef/tLo $# u|]8
k|lt af]/f
ef/lto cf]lkl;
l;d]G6 %# u|]8
g]kfnL cf]lkl;
l;d]G6 %# u|]8
g]kfnL cf]lkl;
l;d]G6 $# u|]9
;]tf] l;d]G6

:aLs"t b//]6
:aLs"t b//]6 cf j :aLs"t b//]6 cf j
cf a
@)&)&!
@)&!&@
@)&@)&
#
Eof6 afx]s
Eof6 afx]s
Eof6 afx]s

k|lt af]/f
k|lt af]/f

6.5

250

300

300

650

650

650

670

670

670

700

700

700

720

720

720

750

750

750

720

720

720

700

700

1200

1200

1200

50

50

50

250

250

275

15

15

15

82

84

84

84

84

84

k|lt af]/f
k|lt af]/f
k|lt
s]=hL=
k|lt ln6/
k|lt
s]=hL=
k|lt
s]=hL=
k|lt
s]=hL=

cf=j=2070071 sf] ;"v]{t lhNnfsf] :jLs't lhNnf b//]^


20
kmnfd] 58- l6 Pd l6 %))_!) ldld eGbf dfyL
aflG8 tf/
/f]ln ;6/ !* u]]]h

lkml6 ;d]t

/f]ln ;6/ !* u]]]h

lkml6 ;d]t

sf]nfK;Ljn ;6/ * u]h

lkml6 ;d]t

sf]nfK;Ljn ;6/ * u]h

lkml6 ;d]t

23

Pd= P;= u|Ln

lkml6 ;d]t

24

sfF9]tf/ - sdl;{on_

21

22

!) u]h
!@ u]h

k|lt
s]=hL=
k|lt
s]=hL=
k|lt
a=lkm6
k|lt s]hL
k|lt
a=lkm6
k|lt s] hL
k|lt
s]=hL=
k|lt
s]=hL=
k|lt

s]=hL=
k|lt
s]=hL=
k|lt
x]le sf]6]8
s]=hL=
k|lt
d]l8od sf]6]8
s]=hL=
k|lt
sdlz{on
s]=hL=
k|lt
s]=hL=
k|lt
s]=hL=
k|lt
s]=hL=
k|lt
d:SjL6f] k|'km s]=hL=
k|lt
-sdzL{on_rfOlg
a=ld=
h
k|lt
d:SjL6f] k|'km
-sdzL{on_ef/tLo a=ld=
k|lt
s'v'/] hfnL @@
a=ld=
k|lt
s'v'/]u]h
hfnL !*
a=ld=
a|f; u]h
a/kmL
,, ,,
-PS:k]G8]8_
!$ u]h

25

lh cfO{ jfo/ -u]ljog tf/_


Pd= P;= P+un

26

Pd=P;= km\n]6
Pd=P;= sfnf] kfO{k

27

28

29

30

Pd=P;= :Sjfo/ xnf] kfO{k

hfnL

l;=lh=cfO= l;6 ldl8od Snf;


sf]?u]6]8 %) s]=hL= )
=)#& dL=dL=
Kn]g
/+uLg l;6
sf]?
u]6]8
Kn]g

31

h] x's

32

la6'ldg jf;/

34

jfn 6fon

38

nf]/ 6fon

115

100

110

115

92

92

98

96

96

98

98

98

100

90

92

98

88

90

94

86

88

90

83

86

90

82

85

90

82

85

90

82

85

90

85

85

132
200

120

120

125

125

125

175

150

6350

6500

8700

8850

9000

9000

9000

16

16

18

0.4

0.5

160

160

180

260

260

300

335

335

375

325

325

360

400

400

440

160

160

180

540

540

714

650

650

762

810

810

900

afs] lhNnfsf] :jLs"t


b//]6 cg';f/sf]
b//]6
sfod ug]{

afs] lhNnfsf]
:jLs"t
b//]6 cg';f/sf]
b//]6
sfod ug]{

afs] lhNnfsf]
:jLs"t
b//]6
cg';f/sf]
b//]6
sfod ug]{

55

55

55

55

55

55

55

55

65

55

60

65

70

72

105

95

65

65

65

65

65

65

@^ u]h
@^ u]h

^ ldld
3 ldld
;fwf/0f

kf]l;{lng Un]h 6fon

115

8700

$ ldld ;]tf]
$ ldld sfnf]

37

420

6350

;gdfO{sf

^ g+= x}G8kDk x]8


cfjZos ;a} ;fdfg ;lxt
^ g+= x}G8kDk x]8
cfjZos ;a} ;fdfg ;lxt
$ g+= x}G8kDk x]8
cfjZos ;a} ;fdfg ;lxt
$ g+= x}G8kDk x]8
cfjZos ;a} ;fdfg ;lxt

420

380

,, ,,
,, ,,
,, ,,
k|lt yfg
,,
k|lt
a=ld=
,, ,,
,, ,,
k|lt
a=ld=
,, ,,
k|lt
a=ld=
k|lt
a=ld=
k|lt
a=ld=
,, ,,
k|lt yfg
k|lt yfg
,, ,,
,, ,,

^ ldld

wf/f 6'6L

120

@^ u]h

a|f; -;fwf/0f_
36

325

120

6700

KnfO{p8

cfl6{lkmlzon l6s

;L;f

325

6500

#=% ldld=
35

300

6500

12 ldld

33

83
110

k|lt a08n

;fwf/0f

sdl;{on

83
105

@^ u]h

3 ldld
KnfO{p8

83
105

a|f; -x]le_
hf]G;g -;fwf/0f_
hf]G;g -x]le_

ldl8od @) s]=lh= k|lt ;]6


nfO{6 !* s]=lh=

k|lt ;]6

ldl8od @) s]=lh= k|lt ;]6


nfO{6 !* s]=lh=

k|lt ;]6

k|lt
$x^, ^ x
*
a=lkm=
* x *
,, ,,
,, ,,
!@ x !@
,, ,,
!) x !#
,, ,,
!@ x !*
,, ,,
k|lt
$x^, ^ x
*
a=lkm=
* x *
,, ,,
* x !@

38
cf=j=2070071 sf] ;"v]{t lhNnfsf] :jLs't lhNnf b//]^
nf]/ 6fon

40

l;d]G6 6fon O{G6/ns


:yfgLo
r]s 6fon :yfgLo

41

vfS;L sf7df nufpg]

42

vfS;L kmnfddf nufpg]

43

v/

44

uf]a/

45

e';

39

46

46

,, ,,
,, ,,
!^ x !^
,, ,,
@$ x @$
,, ,,
* x &
k|lt uf]6f
!) x !)
k|lt uf]6f
k|lt tfp
k|lt tfp
k|lt ef/L
k|lt
3=ld=
k|lt
* x !@

65

65

65

!@ x !@

65

65

70

48

49

g6 jf]N6

lsNnf

l5:sLgL

sAhf

Xof08n -cfnd'lgod_
nls ;]6 -@%) dL=dL=_

51

8f]/ :k|L

52

emofn c8\ofpg] cfO{ x's

53

xf]N8kmf:6 -k|lt s]=hL &


yfg_
sfj{g kmfO{af o'lkle;L h:tf
kftf # ldld

30

30

30

35

35

35

10

10

10

10

260

260

260

600

600

600

130

175

195

105

105

65
65

95
95

70

95

107
75
75
80

80

97

80

25

25

25

30

30

40

35

35

30

42

44

50

45

45

45

70

70

68

95

95

80

150

150

100

16

18

25

30

30

30

40

40

40

55

55

50

80

80

70

300

300

250

350

350

350

160

160

160

k|lt yfg

18

18

20

,, ,,
,, ,,
k|lt
ju{k|lt
lkm6
ju{ lkm6
k|lt yfg
k|lt yfg
k|lt yfg
k|lt yfg
k|lt yfg
k|lt yfg
k|lt yfg

30

30

30

18

18

18

150

150

150

110

110

110

k|lt
# -cfnd'lgod_
,,
$ -;fwf/0f_
,,
$ -cfnd'lgod_
,,
^ -;fwf/0f_
k|lt
^ -cfnd'lgod_ k|lt
!@ -;fwf/0f_
,,
!@
,,
-cfnd'lgod_
#
k|lt
$
,,
%
,,
^
,,
*
,,
l:6n
,,
cfnd'lgod
,,
;fwf/0f
,,
( lh=cfO{=
kmnfd] ;fwf/0f
* cfnd'lgod
(
# ld ld
# ld ld

55

kfp8/ sf]l6 lkmS;/

56

;]Nkm 6]lk :s|' #

57

;]Nkm 6]lk :s|' @ %

58

;]Nkm 6]lk :s|' @

59

;]Nkm 6]lk :s|' ! %

60

;]Nkm 6]lk :s|' !


o'lkle;L l/h se/-$
^x@_

61

125

s]=hL=

50

54

85

90

* ldld=,!)
k|lt
dL=dL= / !%
s]=hL=
dL=dL=
k|lt
tf/
s]=hL=
k]r -#$ O{~r_ k|lt ;o
k]r -! O{~r_
k|lt ;o
k]r -!=% O{~r_ k|lt ;o
k]r -@ O{~r_
k|lt ;o
# -;fwf/0f_

47

75

yfg
,,
,,
,,
yfg
yfg
,,
,,
yfg
,,
,,
,,
,,
,,
,,
,,

7.5

7.5

7.5

4.5

4.5

4.5

1250

1250

1400

afFs]sf] l:js[t b//]6


df 9'jfgL hf]l8 sfod
x'g]

afFs]sf] l:js[t
b//]6
df 9'jfgL hf]l8
sfod x'g]

afFs]sf] l:js[t
b//]6
df 9'jfgL
hf]l8 sfod
x'g]

62

cnsqf -*)!))_

cnsqf -*)!))_

k|lt d]=6=

DRMB-DIGO 55

k|lt d]=6=

83000

63

kf/s]l6
/a/ l;n

k|lt j ld

120

k|lt / ld

400

k|lt / ld

500

64

$ ""'''O{Gr
^ O{Gr

65

HeavyCoated Machine bmade


gabion boxes (mesh wire
3mm,Selvage wire 3.9mm, Lacing
wire 2.4mm & mesh size
(10cmx12cm) hexagonal mesh size

1.5m x 1m x 0.50m

80000

k|lt uf]6f

1416

cf=j=2070071 sf] ;"v]{t lhNnfsf] :jLs't lhNnf b//]^

2mx1mx0.50m
3mx1mx0.50m
4mx1mx0.50m
1.5m x1m x1.0m
2m x1m x1.0m
3m x 1m x 1.0m
4m x 1m x 1.0m
Meccafrerri jumbo Gabion
3m x 1.5m x 0.5 m
4m x 1.5m x 0.5 m
5m x 1.5m x 0.5 m
6m x 1.5m x 0.5 m
3m x 1.5m x 1.0 m
4m x 1.5m x 1 m
5m x 1.5m x 1 m
6m x 1.5m x 1 m
3m x 2m x 0.5m
4m x 2m x 0.5m
5m x 2m x 0.5m
6m x 2m x 0.5m
3m x 2m x 1m
4m x 2m x 1m
5m x 2m x 1m
6m x 2m x 1m

k|lt
k|lt
k|lt
k|lt
k|lt

Wiremesh neeting

k|lt j=ld=

dfn;fdfg pknAw u/L


cn'ldlgod :nfOl8+u em\ofn.
e]lG6n];g (90x40 x1.1)mm
a6d :nfOl8+u ;]S;g lkm:8
b'O{ Kofgn
:nfOl8+u
d:sL6f]
k|'km
hfnL k|m]d,$
65.1 d:sL6f]
k|'km
kNnf
afx]s
ld=ld=hfnL
afSnf]
l;;f,
nls+u
l;:6d,
Uof:s]6
;lxt ,HjOG6
b'O{ Kofgn
:nfOl8+u
d:sL6f]
65.2 k|'km
lkmn u/]/
hfnLnfOg
kNnfn]endf
;lxt
;Dk'0f{
lkml6+u
;lxt h8fg
b'O{ Kofgn
:nfOl8+u
d:sL6f]
65.3 ug]{
k|'kmsfo{
hfnL kNnf / dfly lkmS8

uf]6f
uf]6f
uf]6f
uf]6f
uf]6f

1926
2749
3470
2058
2735

k|lt uf]6f
k|lt uf]6f

3881
4998

k|lt uf]6f
k|lt uf]6f

4038
5111

k|lt
k|lt
k|lt
k|lt
k|lt
k|lt

uf]6f
uf]6f
uf]6f
uf]6f
uf]6f
uf]6f

6336
7567
5686
7167
8861
10539

k|lt uf]6f

5111
6457
8014
9571
7031
8846
10932
13004
258

65

k|lt a=
lkm6=

580

k|lt a=
lkm6=

570

k|lt a=
lkm6=

600

k|lt a=
lkm6=

620

tLg Kofgn :nfOl8+u d:sL6f]


65.5 k|'km hfnL kNnf ;lxt

k|lt a=
lkm6=

550

tLg Kofgn :nfOl8+u d:sL6f]


65.6 k|'km hfnL kNnf / dfly lkmS8
e]lG6n];g
;lxt u/L g]r'/n
dfn;fdfg pknAw

k|lt a=
lkm6=

620

k|lt a=
lkm6=

690

k|lt a=
lkm6=

660

k|lt a=
lkm6=

700

k|lt a=
lkm6=

720

tLg Kofgn :nfOl8+u d:sL6f]


66.5 k|'km hfnL kNnf ;lxt

k|lt a=
lkm6=

700

tLg Kofgn :nfOl8+u d:sL6f]


66.6 k|'km hfnL kNnf / dfly lkmS8
e]lG6n];g ;lxt

k|lt a=
lkm6=

730

e]lG6n];g
tLg Kofgn ;lxt
:nfOl8+u d:sL6f]
65.4 k|'km hfnL kNnf afx]s

66.0 c]gf]8fOh8 cn'ldlgod


:nfOl8+u em\ofn. e]lG6n];g
(101x45x1.5)mm a6d
b'O{ Kofgn
:nfOl8+u
d:sL6f]
;]S;g
lkm:8 d:sL6f]
66.1 :nfOl8+u
k|'km
k|'km hfnL
hfnL kNnf
k|m]dafx]s
;lxt,%
ld=ld=
afSnf]
l;;f, EPDM
b'O{
Kofgn
:nfOl8+u
d:sL6f]
66.2 k|'km
Uof:s]6hfnL
gfOng
/f]n/
kNnf
;lxtc6f]
nls+u
l;:6d j]b/
kfOn : d:sL6f]
b'O{ Kofgn
:nfOl8+u
;lxt ,HjOG6
l;lnsg
66.3 6Lk,
k|'km hfnL
kNnf / dfly
lkmS8
l;naf6
lkmn
u/]/
nfOg
e]lG6n];g
;lxt
tLg
Kofgn
:nfOl8+u
d:sL6f]
;Dk'0f{ lkml6+u ;lxt
66.4 n]endf
k|'km
hfnLsfo{
kNnf afx]s
h8fg ug]{

^&

dfn;fdfg pknAw u/L


cn'ldlgod :nfOl8+u em\ofn.
e]lG6n];g (87x56 x1.2)mm
a6d :nfOl8+u ;]S;g lkm:8
^&=! b'O{
Kofgn
:nfOl8+u
d:sL6f]
d:sL6f]
k|'km
hfnL k|m]d
;lxt,
k|'km
hfnLafSnf]
kNnf afx]s
% ld=ld=
l;;f, nls+u
l;:6d, Kofgn
Uof:s]6
;lxt ,HjOG6
^&=@ b'O{
:nfOl8+u
d:sL6f]
lkmn u/]/
k|'km
hfnLnfOg
kNnfn]endf
;lxt
lkml6+u
;lxt h8fg
^&=# ;Dk'0f{
b'O{ Kofgn
:nfOl8+u
d:sL6f]
ug]{
sfo{
k|'km hfnL kNnf / dfly lkmS8

k|lt a= lkm6=

600

k|lt a= lkm6=

570

k|lt a= lkm6=

600

^&=$ e]lG6n];g
tLg Kofgn ;lxt
:nfOl8+u d:sL6f]
k|'km hfnL kNnf afx]s

k|lt a= lkm6=

620

^&=% tLg Kofgn :nfOl8+u d:sL6f]


k|'km hfnL kNnf ;lxt

k|lt a= lkm6=

600

^&=^ tLg Kofgn :nfOl8+u d:sL6f]


k|'km hfnL kNnf / dfly lkmS8
e]lG6n];g ;lxt

k|lt a= lkm6=

640

cf=j=2070071 sf] ;"v]{t lhNnfsf] :jLs't lhNnf b//]^


^*

dfn;fdfg pknAw u/L


cn'ldlgod :nfOl8+u em\ofn.
e]lG6n];g (87x56 x1.4)mm
a6d :nfOl8+u ;]S;g lkm:8
^*=! b'O{
Kofgn
:nfOl8+u
d:sL6f]
d:sL6f]
k|'km
hfnL k|m]d
k|'km
kNnf
afx]sl;;f,
;lxt ,%hfnL
ld=ld=
afSnf]
nls+uKofgn
l;:6d, :nfOl8+u
Uof:s]6 ;lxt
^*=@ b'O{
d:sL6f]
,HjOG6hfnL
lkmn
u/]/;lxt
nfOg
k|'km
kNnf
;Dk'0f{
lkml6+u
;lxt
^*=# n]endf
b'O{ Kofgn
:nfOl8+u
d:sL6f]
h8fg
k|'kmug]{
hfnLsfo{
kNnf / dfly lkmS8

k|lt a= lkm6=

660

k|lt a= lkm6=

640

k|lt a= lkm6=

670

^*=$ tLg Kofgn :nfOl8+u d:sL6f]


k|'km hfnL kNnf afx]s

k|lt a= lkm6=

690

^*=% tLg Kofgn :nfOl8+u d:sL6f]


k|'km hfnL kNnf ;lxt

k|lt a= lkm6=

660

k|lt a= lkm6=

690

dfn;fdfg pknAw u/L


cn'ldlgod :nfOl8+u em\ofn.
e]lG6n];g (78x50x1.1)mm
a6d :nfOl8+u ;]S;g lkm:8
^(=! b'O{
Kofgn
:nfOl8+u
d:sL6f]
d:sL6f]
k|'km
hfnL k|m]d
;lxt,
k|'km
hfnLafSnf]
kNnf l;;f,
afx]s
$ ld=ld=
nls+u
^(=@ b'O{
:nfOl8+u
d:sL6f]
l;:6d, Kofgn
Uof:s]6
;lxt ,HjOG6
k|'km
hfnLnfOg
kNnfn]endf
;lxt
lkmn u/]/
;Dk'0f{
lkml6+u
;lxt h8fg
^(=# b'O{
Kofgn
:nfOl8+u
d:sL6f]
ug]{ sfo{
k|'km
hfnL kNnf / dfly lkmS8

k|lt a= lkm6=

500

k|lt a= lkm6=

480

k|lt a= lkm6=

520

e]lG6n];g
^(=$ tLg
Kofgn ;lxt
:nfOl8+u d:sL6f]
k|'km hfnL kNnf afx]s

k|lt a= lkm6=

530

^(=% tLg Kofgn :nfOl8+u d:sL6f]


k|'km hfnL kNnf ;lxt

k|lt a= lkm6=

500

k|lt a= lkm6=

550

e]lG6n];g ;lxt

^*=^ tLg Kofgn :nfOl8+u d:sL6f]


k|'km hfnL kNnf / dfly lkmS8
e]lG6n];g ;lxt
^(

^(=^ tLg Kofgn :nfOl8+u d:sL6f]


k|'km hfnL kNnf / dfly lkmS8
;lxt u/L cn'ldlgod
&) e]lG6n];g
dfn;fdfg pknAw

&!

&@

@
#
$

n'e/ em\ofn . e]lG6n];g


(60X40X1.1mm) ;]S;gsf]
nls+u l;:6d, HjfOG6 Uofk /j/
l;n, Uof:s]6 d:sL6f] k|'km
hfnL afx]s nfOg n]endf
;Dk'0f{ lkml6+u ;lxt h8fg
dfn;fdfg pknAw u/L cn'ldlgod
lkmS; kfl6{;g ug]
{ 64*38*1.1mm ;]S;gsf]
( ld=ld= n]ldg]6]8 af]8{ / %
ld=ld= afSnf] l;;f ;lxt
;Dk'0f{ lkml6+u ;lxt h8fg
dfn;fdfg pknAw u/L cn'ldlgod
lkmS; kfl6{;g ug]
{ 64*38*1.1mm ;]S;gsf]
( ld=ld= n]ldg]6]8 af]8{ / %
ld=ld= afSnf] l;;f ;lxt
;Dk'0f{ lkml6+u ;lxt h8fg
:ofg]6/L tkm{
Pg P; $) cg';f/sf] ljleGg
;fO{hsf] kf]lnlyg kfO{k
Pr l8 kL jf6/ :6f]/]h 6}s
Kofg ;fOkmg6fO{k
km'6/]:6
;lxt n; ;d]t -/fd|f]
sdf]8 ;fOkmg

!)
!!
12
13
14
15
16

vfnsf] sn/ lxGb':yfg jf ;f]


;/xsf]
;]/flds n; ;d]t -/fd|f]
sdf]8 _;fOkmg
vfnsf] ;]tf] lxGb':yfg jf ;f]
;/xsf]
o'l/gn _ ;]/flds
k'?if -kf]l;{lng
Un]h_
dlxnf -kf]l;{lng
Un]h_
nf] n]en l;:6g{
;]/flds
Knfl:6s
jfz a]lzg ;]/flds_ ;fwf/0f
lsrg l;+s
l:6n
:6Ln
P]gf
;]Nkm
6fjn /8 l;=kL=
;f]k l8;
;fj/ -x]le l:6nsf]_
l;=lk= af]6n 6ofk
lk=le=l;= 6ofk

17

l;= cfO{= kfOk

%
^
&

*
(

k|lt a= lkm6=

k|lt a= lkm6=

420

k|lt a= lkm6=

650

k|lt s] lh

190

235

270

k|lt ln6/
k|lt ;]6

11
600

11
700

12
850

k|lt ;]6

7700

7700

8000

,, ,,

5300

5300

6500

!$
!$

,, ,,
,, ,,

750
750

840
840

1000
1000

!) ln6/
!) ln6/
@) x !^
@$ x !*
#^ x !*
!^ x @)

k|lt uf]6f
k|lt uf]6f
,, ,,
,, ,,
,, ,,
k|lt yfg
,, ,,
,, ,,
,, ,,
,, ,,
k|lt uf]6f
k|lt uf]6f
k|lt ld6/

2000
1400
1000
2250
3000
500
350
350
250
650
500
350
550

2500
1750
1000
2250
3000
550
350
440
250
750
650
350
550

2600
1750
1050
2500
3300
650
400
460
260
1000
750
450
600

@)

!* nfdf]
l;=kL=
l6N6L

cf=j=2070071 sf] ;"v]{t lhNnfsf] :jLs't lhNnf b//]^


17

l;= cfO{= kfOk

18
19
20
21
22
23
24
25

lja ss
l6 j]08 -l;= cfO=_
l6 j]08 -l;= cfO=_
lkle;L n|f]/ 6ofk-$@.
%_
P;=8An' kfOk @ lkm6 nfdf]
P;=8An' l6 j]08
l;=cfO= sfpn
lgxfg 6ofk

26

lh= cfO{ kfOk -ldl8od Snf;_

lk=le=;L= kfOk
-Pg=P;=@)^, $
s]]=lh=;]=dL=@ _
28 lk=le=;L= kfOk sg]S6/
/+u/f]ug tkm{ M
1
l;d]06 k]06 -:gf];]d_
2
tof/L Ogfd]n k]06
3
p8 k|fOd/
4
cNd'gLod k]06
5
afg]{;
6
l8=la= lnG;L8 cfon
7
tf/lkg t]n -lkmN6/_
8
cnsqf k]G6
9
d]6n k|fO{d/
10 l:k|6
/]8 cS;fO8 k]06 (Metal
11
Primer)
12 ;/]z
13 rk|f
14 u]? /+u
15 r'gf
16 ud r'gfdf nufpFg]
17 d}g kfln;
18 k]mljsf]n -Adhesive)
19 Pdl;n
27

20

k]lG6 a|z

21
22
23

KNFffl:6s OdN;g k]G6


j]b/ uf8{
jfn k'l68=

@
;fwf/0f
$
@
$
$
$
$
#x @=%

,,
k|lt
,,
k|lt
,,
,,
,,
,,
,,

,,
yfg
,,
yfg
,,
,,
,,
,,
,,

400
600
298
176
504
165
220
165
252

400
600
300
176
505
165
220
165
255
afFs]sf] l:js[t b//]6df
9'jfgL hf]l8 sfod x'g]

,, ,,

425
206

,, ,,

%) u|fd
!
@
#
$

k|lt s]=hL=
k|lt ln6/
k|lt ln6/
k|lt ln6/
,,
,,
k|lt ln6/
k|lt ln6/
k|lt ln6/
,,
,,
k|lt s]=hL=
k|lt s]=hL=
,,
,,
,,
,,
,,
k|lt Kofs]6
k|lt yfg
,,
,,
,,
k|lt ln=

60
420
330
485
300
100
160
180
276
100
325
110
1050
25
20
160
445
170
50
50
100
150
200

60
440
350
530
420
100
160
180
345
120
340
110
2500
30
20
165
445
170
50
50
100
150
200

k|lt KafO{G6

afFs]sf] l:js[t b//]6df


9'jfgL hf]l8 sfod x'g]
60

afFs]sf] l:js[t
b//]6df 9'jfgL
hf]l8 sfod x'g]
50

295
185
1250
550
260
15
180
380
400
550
450
1080
650
250
175
70
45
80
450
600
400
300
370
400
1550
400
2000
400
450

295
185
1800
600
260
20
200
500
400
550
450
1175
650
280
200
100
45
80
350
600
400
350
370
450
1000
400
2000
400
450

laB't tk{m M
1

ljB't ;DjlGw lgdf{0f ;fdu|Lx?

2
afol/ rfh{
cf}hf/x? M
1

emf/L -xhf/L_

2
3
4

kmnfd]] un
s}rL
s/f}tL km|]d ;d]t
s/f}tL Jn]8
s'6f]
km?jf 6f6f
sf]bfnf]
a]Nrf 6f6f
u}+6L !x!$
3g
3g
3g 9'f s'bg]
t;nf
sgL{
tf/ a|'z
%)) u]hsf] kf]lnlyg l;6
;fjn vGtL ;fgf]
;nfO{8 /]GrL !@ O{Gr
cf]kg /]GrL @$*@& O{Gr
uf]nf] /]GrL !**!( O{Gr
uf]nf] /]GrL #)*#@ O{Gr
uf]nf] /]GrL @$*@& O{Gr
kfO{k /]GrL !* O{Gr
Knf:l6s jfNl6g @) ln6/
6'n aS;
#$ O{Gr ;:k]G8/ 8fO{
l5gf nfdf] @

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

425
650
325
190
525
175
230
175
265
afFs]sf] l:js[t
b//]6df 9'jfgL
hf]l8 sfod x'g]

!) ln6/
% ln6/
!=% x % lkm6
nDafO{
?vsf] xfuf sf6g]
,,
,,
k|lt lk;
/fd|f]
/fd|f]
/fd|f]
/fd|f]
/fd|f]
!) kfp08
# s] hL
!s] hL
/fd|f]
/fd|f]
/fd|f]

!x @

k|lt yfg
,,
,,
,,
,,
,,
k|lt yfg
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
/=dL=
uf]6f
uf]6f
uf]6f
uf]6f
uf]6f
uf]6f
uf]6f
uf]6f
uf]6f
uf]6f
uf]6f

295
185
1250
450
260
180
300
300
400
380
1080
650
200
150
70
45
70
450

450

70
620
400
660
450
120
180
180
380
150
400
120
2000
30
30
180
445
175
50
50
120
180
200
852
817
65

cf=j=2070071 sf] ;"v]{t lhNnfsf] :jLs't lhNnf b//]^


28 9'f kmf]8g] l5gf
29 a6fd * O{Gr
30 3G6L
31 gfKg] lkmtf % dL
32 afn'jf rfng] hfnL
33 n]jn kfOk
34 wfuf]
9'jfgLtkm{ M
1

el/of4f/f 9'jfgL

dflg;f/f 9'jfgL

;fdfu|L nf]8cgnf]8 ubf{


pkTosfleq ahf/b]lv
lgdf{0f:yn;Dd lgdf{0f ;fdu|L
9'jfgL

% dL

uf]6f
uf]6f
uf]6f
uf]6f
k|lt dL
k|lt dL
k|lt /f]n

300
130
100
65
175
10
25

300
130
100
100
200
20
30

350
150
150
120
250
30
30

$) s]=hL=!#
ls=dL=
k|lt lbg af]Sg]

k|lt JolQm k|
lt lbg

380

420

470

;lhnf] ;fdfgx?
c;lhnf] ;fdfgx?

u|fe]n ;8ssf nflu

df6f] ;8ssf nflu

lkr ;8ssf nflu

6s ef8f - !) 6g Ifdtf _

laB't kf]n 6saf6 9'jfgL

!) 6g Ifdtf ePsf] gofF 6ssf]


d"No -b/ljZn]if0f k|of]hgsf]
nflu_

10

11

6saf6 9'jfgL u/fpFbf

;lhnf] ;fdfgx?
c;lhnf] ;fdfgx?
;lhnf] ;fdfgx?
c;lhnf] ;fdfgx?
;lhnf] ;fdfgx?
c;lhnf] ;fdfgx?
pkTosfleq dfq
clt c;lhnf]

k|lt s]=hL k|
lt sf]if
,,
,,
k|lt SjLG6n

2.3

2.40

2.6

2.75
30

2.80
30.00

3
32

k|lt SjLG6n

30

30.00

32

k|lt ls=dL=
k|lt SjL=
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
k|lt l6k

3.10

3.3

3.25
4
4.2
2.6
3
3000

3.30
4.10
4.30
2.70
3.10
3200

3.5
4.3
4.5
2.9
3.2

k|lt uf]6f

3000000

3500000

3500000

k|lt 6s cfj/

b//]6 laZn]if0f cg';f/

b//]6 laZn]if0f cg';f/

ldlt @)^%)%@# sf]


dGqL:t/Lo
lg0fo{ cg';f/ ;8s ljdfu
cGt{utsf lgsfodf /x]sf
ljleGg k|sf/sf ofLGqs
pks/0fx?sf] ef8f b//]6
-lni6 ;nug 5.-;+;f]wg
ePdf ;f]xL cg';f/ sfod
ul/g] 5.

ldlt @)^%)%@#
sf] dGqL:t/Lo
lg0fo{ cg';f/ ;8s ljdfu
cGt{utsf lgsfodf /x]sf
ljleGg k|sf/sf ofLGqs
pks/0fx?sf] ef8f b//]6
-lni6 ;nug 5.-;+;f]wg
ePdf ;f]xL cg';f/ sfod
ul/g] 5.

k|lt SjLG6n
,,
k|lt n6
k|lt af]/f
k|lt n6

2.8
2.8
250
1.7
200

3
3
275
1.9
220

4
4
330
2.4
240

;]6
uf]6f
,,
,,
,,
s]=hL=
uf]6f
k|lt l:nk

1.25
5.5
200
10
10
500
5
0.15

1.25
5.5
200
10
10
500
5
0.15

1.25
6
225
11
10
500
5
0.25

k|lt l:nk
k|lt l:nk
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt l:nk
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt l:nk
k|lt l:nk
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt ;]6

0.15
0.15
3
10
10
10
1
10
10
10
3
2
2
3
10
5
1.25

0.15
0.15
3
10
10
10
1
10
10
10
3
2
2
3
10
5
1.25

0.25
0.25
3.25
10
10
10
1
10
10
10
3
2
2
3
10
5
1.25

k|lt uf]6f

45

45

45

3400
afs] lhNnfsf]
afs] lhNnfsf] b//]6 nfO{ afs] lhNnfsf] b//]6
b//]6 nfO{ cfwf/
k|lt kf]n =
cfwf/ dfgL b//]6 sfod nfO{ cfwf/ dfgL b//]6
dfgL b//]6 sfod
ug]{
sfod ug]{
ug]{

ljleGg oflGqs d]lzg pks/0fx?sf


ef8f b//]6 -O{Gwg jfxs_

vfB ;+:yfg k|of]hgsf] nflu M


1
tf}nfO{
2
rf}sfO{
3
k\mo"ldu]zg
4
af]]/f l;nfO{
5
:k|]
ag e';+/If0ftk{m M
1
g]lko/ ;]6 vl/b
2
cd[;f] /fOhd
3
afF; /fOhd sl6
baba] s6L -%) nfdf], &
4
uf]nfO{_
sfa|f] -%) nfdf], &
5
uf]nfO{_
6
:6fOnf] 3fF; aLp
7
lgufnf] /fOhd
8
sf;
3f+; tkm{
1
v/
2
aflaof]
c;'/f] sl6 -%) nfdf], &
3
uf]nfO{_
j}+; sl6 -%) nfdf], &
4
uf]nfO{_
sf8]k'mn sl6 -%) nfdf], &
5
uf]nfO{_
l;dln
sl6 -%) nfdf], &
6
uf]nfO{_
7
a];/d sl6
lv/{/f] sl6 -%) nfdf], &
8
uf]nfO{_
lgdf/f] sl6 -%) nfdf], &
9
uf]nfO{_
10 af]6/L sl6
lgnsf+8f sl6 @% nfdf], &
11
uf]nfO{_
12 n]dg u|f; l:nk
13 l;6f]g]nf l:nk
cf+s sl6 - @% nfdf], &
14
uf]nfO{_
lsDj' sl6 @% nfdf], &
15
uf]nfO{_
;lhjg sl6 @% nfdf], &
16
uf]nfO{_
17 dNnf6f] ,kf;kfnd abfd]
^ O{Gr cUnf] la?jf vl/b
-kf]lnAofu ;lxt_
1
cgf{d]G6n -czfs ,w'kL cfbL-

b//]6 laZn]if0f
cg';f/
ldlt @)^%)
%@# sf]
dGqL:t/Lo
lg0fo{ cg';f/ ;8s
ljdfu cGt{utsf
lgsfodf /x]sf
ljleGg k|sf/sf
ofLGqs pks/0fx?
sf] ef8f b//]6
-lni6 ;nug 5.-;
+;f]wg ePdf
;f]xL cg';f/ sfod
ul/g] 5.

cf=j=2070071 sf] ;"v]{t lhNnfsf] :jLs't lhNnf b//]^


2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
1
1
2
3
4
5

cgf{d]G6n afx]s cGo hftsf


;'uGw sf]lsnf
l/7\f
lgd
a8x/
asfOgf]
sf]O/fnf]
sk'/
d;nf
cdnf xfO{la|8
t]hkft
x/f]{
a/f]{
l;;f}
hfd'g
lkkn sl6
nx/] lkkn sl6
l6d'/
a]n nf]sn
v}/
sfaf|] la?jf kf]lnAofu
cdnf nf]sn
df]nf;];
lkg6 uf|;
?bfIf
l;l/v08
ledn
nfs'/L
nK;L
a]t
l;l/;
s'l/nf] nf]sn
s'l/nf] gff]] h/f
;k{ uGwf
/Qm rGbg
bft] cf]Vv/
;Nnf]
plQ;
cGo
jLp vl/b M
d]Gyf
Sofdf]dfOg ljp
vf]6] ;Nnf
a8x/
/fOvGo'
vdf/L
k}of}
lgdf/f]
af;
cdnf xfO{la|8
t]hkft
w'kL
>Lv08
/St rGbg
>L;
asfOgf]
sk'/
nK;L
hfd'g
?Olgof
;lhjg
v}/ l;;f}
Sofl;of l;ldof
aa'n
uf]ndf]x/
6fsL sf]O/fnf]
l6d'/
;'uGw sf]lsnf
kf]lnlyg 6o"a @ O{Gr * & O{Gr @)) u]hsf]
ag tkm{
?v 5kfg ug]{ sfo{
s6fg d'5fg tkm{
v sf6L uf]lnof agfpg]
uf]lnofsf] af]qmf lemSg] / l/
sf6\g]
gDal/ ug}{ sfo}
u|]l8 ug]{ sfo{
uf]lnof tgg] / ;sng ug]{ sfo{

k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt ;]6
k|lt ;]6
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f
k|lt uf]6f

9
10
8
5
10
5
5
5
5
25
10
8
5
3
5
8
5
15
8
5
8
5
0.5
0.5
75
50
8
5
8
10
5
7
7
5
50
20
5
5
7

9
10
8
5
10
5
5
5
5
25
10
8
5
3
5
8
5
15
8
5
8
5
0.5
0.5
75
50
8
5
8
10
5
7
7
5
50
20
5
5
7

9
10
8
9
10
5
6
6
5
25
10
8
5
3
5
8
5
15
8
5
8
9
0.5
0.5
200
60
8
5
8
11
5
7
7
5
50
25
5
5
7

s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=
s]=hL=

50
2000
2000
600
5000
600
500
5000
2000
5000
1000
300
3000
1500
800
300
2500
300
500
400
400
600
800
800
550
800
200
200
200

50
2000
2000
600
5000
600
500
5000
2000
5000
1000
300
3000
1500
800
300
2500
300
500
400
400
600
800
800
550
800
200
200
200

50
2000
2500
600
5000
600
500
5000
2000
5000
1000
500
3000
2000
800
300
2500
300
500
400
400
600
800
800
550
800
300
200
230

k|lt ?v

10

10

12

k|lt So'=lkm=
,,
,,
,,
,,

25
6
3
3
18

25
6
3
3
18

33
7
3
5
22

cf=j=2070071 sf] ;"v]{t lhNnfsf] :jLs't lhNnf b//]^


6
uf]lnof nf]8 cgnf]8
,,
7
uf]lnof kfOln r66f nufpg]
,,
uf]lnof sf7 9'jfgLtk{{m M
1
) % ls=dL= ;Dd
k|lt So'=lkm=
2
% !) ,, ,,
,,
3
!) !% ,, ,,
,,
4
!% @) ,, ,,
,,
5
@) @% ,, ,,
,,
6
@% #) ,, ,,
,,
7
#) #% ,, ,,
,,
8
#% $) ,, ,,
,,
9
$) b]lv dfyL ;a} k|lt ls=ld=
,,
gbL jf6 sf7 lgsf;L 9'jfgL ug]
10
{ sfo{
11 bfp/f @)lkm6 x %lkm6 x %lkm6 s6fg, d'5fg, rf
rf
b'O{;o u]hsf] sfnff] /sf] kf]lnyLg Aofu
12 lgdf{0f ;fy} 3f6 ul4df 9"jfgL u/L rf lgdf{0f
s] hL
#O{Gr ,& O{Gr
k|lt
13 bfp/f 9"jfgL sfo{
So'=lkm=
uf]lnof lr/fg pTkfbg
ljleGg ;fO{hsf sf7 lr/fg
k|lt
1
pTkfbg
So'=lkm6
2
cg;fO{h pTkfbg
k|lt SjL=
3
afsn pTkfbg
k|lt SjL=
k|lt
4
lr/fg nf]l8u
So'=lkm6
k|lt
5
lr/fg cgnf]l8u
So'=lkm6
6
afsn nf]l8u
k|lt SjL=
7
afsn cgnf]l8u
k|lt SjL=
8
cg;fO{h nf]l8u
k|lt SjL=
9
cg;fO{h cgnf]l8u
k|lt SjL=
k|lt
10 lr/fg kfOlnu
So'=lkm6
!)) ld= 6f9f af6 ldn ;Dd
k|lt
11
af]Sg] sfd
So'=lkm6
k|lt
12 ldndf uf]lnof l;kd]G6 nf]l8u
So'=lkm6
ldndf uf]lnof l;kd]G6
k|lt
13
cgnf]l8u
So'=lkm6

lr/fg sf7 9'jfgL

) b]lv % ls=ld= ;Dd


^ b]lv !) ls=ld= ;Dd
!! ls=ld= dfly

afsn cg;fOh 9'jfgL


) b]lv % ls=ld= ;Dd
^ b]lv !) ls=ld= ;Dd
!! ls=ld= dfly

24
12

24
12

30
14

35
40
45
55
60
65
70
75
80
80
6800
200

35
40
45
55
60
65
70
75
80
80
6800
200

38
44
50
60
65
70
75
80
2
85
7500
230

sf7sf] 9'jfgL b//]6sf] cflw b//]6 sfod ug]{{


32.4
78.0
50.0
14.4
3.5
3.6
3.6
6.0
6.0
3.6
8.0
13.8
6.6

k|lt
So'=lkm6
k|lt
So'=lkm6
k|lt
So'=lkm6

16
20
25

k|lt
So'=lkm6
k|lt
So'=lkm6
k|lt
So'=lkm6

25
30
35

c;lhnf] ;fdfg eGgfn] lgDg ;fdfgx? hgfpF5 .


Pr=l8=lk= lh=cfO{=kfO{kx?
lh=cfO{=l;6x?
l;;f
k'nsf ;fdfgx?
k'nsf n6\7fx?
kmnfd] 58\ -Ps ld6/eGbf nfdf]_
a'g]sf] Uoflag hfnLx?
sfF8]tf/
el/ofsf] nflu ef/L afFw]/ $) lsnf] agfO{ af]Sg g;Sg] ;a} ;fdfgx?
6ssf] nflu !) 6g agfO{ nf]8 ug{ g;Sg] ;a} ;fdfgx?
clt
lgDg ;fdfgx?
!= c;lhnf]
cf}ifwL;fdfg
pkrf/eGgfn]
;+u ;DjlGwt
6'6km'6Hfgfp5
eO{ hfg] ;+a]bgzLn ;fdfu|Lx?sf] xsdf c;lhnf]
=@=
Hofb}
x'g] t/
a9Lug]{
x'g] -jf;sf] esf/L, @) Pd=Pd+ b]vL %)
9"afgLtf}n
b//]6
nfO{sd
!=@%
n]cfotg
u'0fgHofb}
u/L sfod
Pd=Pd= ;Ddsf kf]lnlyg kfO{kx?_
gf]6M
!
pk/f]Qm lgdf{0f ;fdfu|Lx?sf] b//]6 ;'v]{t pkTosfsf nflu sfod ul/Psf] xf] .
@
, lh=cfO{= kfO{klh=cfO{= lkml6;tyf cGo ;fdfu|fLx? ;'v]{t lhNnfsf] :jLs[t b//]6df ;dfj]z gePsf lgdf{0f
;fdu|Lx?sf] xsdf afFs] lhNnfsf] :jLs[t b//]6 df 9'jfgL hf]l8 sfod ug]{ .
#
af+s] lhNnfsf] b//]6df klg ;dfj]z gePsf ;fdfu|Lsf] b/ sf7df8f}+ lhNnfsf] l:js[t b//]6nfO{ g} cfwf/ dfgL sfod ug]{] .
$
emf]
k' adflhddf
lgdf0f{ ;DalGw
kmnfd]
xsdf l6 lj o; o"
af6xsdf
lgwf{/0f
u/] adf]lhd
sf] b//]6 nfO{ cfwf/ dfgL sfod ug]{
pk/f]St
;d]t b//]6
pNn]v;fdfu|Lx?sf]
x'g gcfPsf sfo{;fdfu|L
tyf/ 8f]ln8f/
9'jfgLx?sf]
cflwsfl/s
ljs|]tf, pTkfbslgdf{tf
%
tyf 9'jfgLstf{x?af6 pknAw eP ;Dd tLgj6f b/lnO{ ;f} b//]6sf] ;fnfvfnf b//]6 lgsfnL To;} nfO{ b//]6 sfod u/L
sfo{ ug]{
^
xo[d kfO{k sf] ;DaGwdf kmofS6|Laf6 k|fKt b//]6 nfO{ cfwf/ dfgL b//]6 sfod ug]{ .

;'v]{t lhNnfsf] cf=a=072/073 sf nflu :jLs"t >lds Hofnf b//]6


qm=;+=
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

sfdbf/sf] lsl;d

8sdL{
l;sdL{
ah|sdL{
lrqsf/k]G6/
Anfi6/
a]N8/
HofdL
9n ;kmf ug]{ HofdL
;'k/ efO{h/ ->]0fL lalxg_
;'k/ efO{h/ -P; Pn ;L kf;_
;'k/efO[h/ k|fljlws P; Pn ;L kf;
KnDa/
l;lgo/ KnDa/
On]S6|Ll;og x]Nk/
On]S6Ll;og
;xfos a]N8/
r]g Dofg6]k Dofg
Nofa cl;:6}G6 -lgdf0f{ ;fdfu|
L k/LIf0f ;DalG3 sfddf ;xof]u
ug}{
Nofa 6]lSgl;og -lgdf0f{

cf j )
^(&)

cf j )&)&!cf j )&!&@

cf=a= )
&@/073

375

450

530

600

375

450

530

600

375

450

530

600

375

450

530

600

375

450

530

600

450

530

600

270

320

400

290

350

410

260

300

330

400

300

350

390

450

370

420

480

380

420

480

390

430

490

260

300

330

400

320

390

430

490

280

320

400

270

320

400

350

390

450

410

460

520

225

320

225

20

;fdfu|L k/LIf0f ;DalG3 sfddf


ug}{
8fO{e/ -xn'[sf_

275

350

400

460

21

8fO{e/ -x]le_

350

400

450

510

22

x]le OSjLkd]06 ck|]6/

375

450

500

580

23

8|fO[e/ ;xof]uL

225

270

320

400

24

gu/ lgl/Ifs -lkog ;/x_

270

320

400

25

g;{/L gfO{s]

225

270

320

400

26

SofDk js{/rf}lsbf/

225

270

320

400

27

s'lrsf/

270

320

40

28

;e]{ x]Nk/

225

270

320

400

29

dfnL

225

320

n]Gy as{/-;8s ;DjlG3 _

31

s[lif Hofld

g]kfn
;/sf/n] tf]s]
adf]lhd
g]kfn
;/sf/n] tf]s]
adf]lhd

400

30

32

l8n/ sd sDk|];/ ck|]6/


e'sDk dfkg sfof{no / vfgL tyf
e'ue{ ljefusf] sfdsf nflu
SofDk js{/
vg]n
:ofDkn s6/-9'+uf sf6\g]_
;e]{ x]Nk/ -e"ue{ ;DjlGw_
el/of -e"eu{ ;DjlGw_
s_ P;=lk=l6= x]Nk/ -e"
ue{ ;DalGw_
v_ l8n x]Nk/ -e"ue{
;DalGw_

270
g]kfn
;/sf/n]
tf]s]
g]kfn
adf]lhd
;/sf/n]
tf]s]
adf]lhd
390

430

490

320

350

390

450

225

270

320

400

225

270

320

400

225

270

320

400

320

350

390

450

253

280

320

400

253

280

320

400

19

33
1
2
3
4
5
6
7

g]kfn
;/sf/n] tf]s]
adf]lhd
320

g]kfn ;/sf/n]
tf]s] adf]lhd
g]kfn ;/sf/n]
tf]s] adf]lhd

34

1
2

xfjfkfgL sfof{no;+u ;DjlG3t


sfdsf] nflu
e/Lof-;+j]bgzLn df};dL pks/0f
jf]Sg]_
df}zd 6]slgl;og x]Nk/

325

360

400

360

400

460

gf]6 M dfly ;dfj]z gePsf z|lds tyf cGo sfdbf/x?sf] xsdf g]kfn ;/sf/sf] ;dfg txsf] sfof{nodf sfo{/t sd{rf/L sf] tnadfg nfO{
@^ sfo{ lbgn] efu ul/ x'g cfpg] /sdnfO{ ! lbgsf] Hofnf sfod ug]{ lg0f{o ul/of] .

SN

Particulars
1 Kerosane oil
2 Diesel
3 Petrol
4
5

unit
Litre
Litre
Litre

Rate
73.5
73.5
102

Government of Nepal
Ministry of Federal Affairs And Local Development

Office of District Development Committee

District Technical Office


Surkhet

lhNnf b//]6

FY 071/072

Government of Nepal
Ministry of Local Development

Office of District Development Committee

District Technical Office


Surkhet

lhNnf b//]6

FY 069/070

;'v]{t lhNnfsf] cf=a=069/070 sf nflu b//]6


l:js[t Hofnf b/ k|lt JolQm k|lt lbg ?
qm=;+=sfdbf/sf] lsl;d
cf=a=066/067cf=a= )67/068cf=a= )68/069

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

23

24
25
1
2
3
4
5
6
7
26

315
8sdL{
315
l;sdL{
315
ah|sdL{
315
lrqsf/k]G6/
175
HofdL
315
Anfi6/
220
;'k/ efO{h/ -P; Pn ;L k
;'k/ efO{h/ ->]0fL
190
lalxg_
265
KnDa/

KnDa/ sflnu9
175
r]g Dofg
175
dfnL
175
rf}lsbf/
265
On]S6Ll;og

On]S6Ll;og x]Nk/
220
8fO{e/ -xn'[sf_
265
8fO{e/ -x]le_
x]le OSjLkd]06
315
ck|]6/
175
vnf;L
175
g;{/L gfO{s]
175
SofDk js{/
175
;e]{ x]Nk/
g]kfn
;/sf/n]
s[lif Hofld
tf]s]
adf]lhd
l8n/ sd sDk|];/

345

375

345

375

345

375

345

375

195

225

345

375

240

300

210

260

290

320

260

195

225

195

225

195

225

290

320

260

240

275

290

350

345

375

195

225

195

225

195

225

195

225

g]kfn
g]kfn
;/sf/n] tf]s] ;/sf/n] tf]s]
adf]lhd
adf]lhd

265

ck|]6/
e'sDk dfkg sfof{no / vfgL tyf
e'ue{ ljefusf] sfdsf nflu
265
SofDk js{/
175
vg]n
:ofDkn s6/-9'+uf
175
sf6\g]_
;e]{ x]Nk/ -e"
175
ue{
el/of;DjlGw_
-e"eu{
265
;DjlGw_
s_ P;=lk=l6= x]Nk/
210
-e"ue{ ;DalGw_
v_ l8n x]Nk/ -e"
210
ue{ ;DalGw_
xfjfkfgL sfof{no ;+u
;DaGwLt sfdsf nflu

320

320
290

225

195

225

195

225

195

320

290

253

230

;'v]{t lhNnfsf] cf=a=069/070 sf nflu b//]6

1
2

27

28

el/of -;+j]bgzLn
df}zdL pks/0f
af]Sg]_
df}zd 6]lSgl;og
x]Nk/
Nofa 6]lSgl;og

-lgdf{0f ;fdfu|L
k/LIf0f ;DaGwL sfd
ug]{_
Nofa cl;i6]g6
-lgdf{0f ;fdfu|L
k/LIf0f ;DaGwL sfddf
;xof]u ug]{_

gf]6 M dfly ;dfj]z gePsf sfdbf/x?sf] xsdf g]kfn ;/sf/sf] ;DAlGwt kbdf b}gLs Hofnfbf/Ldf sfd
tnjdfgnfO{ @^ lbgn] efu ul/ cfpg] /sdnfO{ ! lbgsf] Hofnf lgwf{/0f ug]{ .

nflu b//]6
lt JolQm k|lt lbg ?
cf=a= )69/070
450
450
450
450
270
450
350
300
380
390
270
270
270
390
300
350
400
450
270
270
270
270

390

350
270
270
270
350
280
280

nflu b//]6
325
360

410

350

Gwt kbdf b}gLs Hofnfbf/Ldf sfd nufpbf z'? dfl;s


gwf{/0f ug]{ .

CONSTRUCTION MATERIAL RATES for 2068-69


S.N.

Description

Unit

Rate

S.N.

Description

Unit

A. LABOUR RATE
1
2
3
4
5

Skilled (carpenter, mason)


Skilled for blacktopping work
Helper
Unskilled
Painter

1
2
3
4
5
6
7
8
9
10
11
12

Bricks 1st class


Stone
Gravel crushed (broken) - 10 mm
"
" -20mm
"
" -40mm
Gravel uncrushed (round) - 10 mm
"
" -20mm
"
" -40mm
Natural gravel
Sand
Mud
Sal wood
Kukath

m.d.
"
"
"
"

39

no.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.

45

40

41
42

43

B. MATERIAL RATE

13
14
15

Wooden Listi
Firewood dry
Commercial plywood - 4 mm

44

Rm.
kg
sq.m.

Cement Indian
Cement Nepali
Cement Nepali
Cement Nepali
Cement white
Iron r od (Fe-415 steel)
M.S. binding wire
Collapsible shutter
Rolling shutter 20 #
Barbed wire12# (1kg = 7m)
Barbed wire14# (1kg = 10m)
Angle Iron
MS grill
Hinges 3"
Hinges - 4"
Bolts - 4"
" - 6"
Holdfast 9" long
Lock -special
Handle special
Door spring
Nails
Screw

bag
bag
m3
mt
mt
Mt
kg
Sq.ft
Sq.ft
Rm.
Rm.
kg
kg
no.
no.
no.
no.
no.
no.
no.
no.
kg
no.

no.
no.
no.
Kg
sq.m.

"
- expanded
Glass - 4mm

sq.m.
sq.m.

CGI sheet 26 # (6'x2'6")


CGI corrugated sheet 26#
CGI plain sheet 26# (0.9)
Gabion wire medium(12#)

Bundle
sq.m.
Rm.
kg

46

47
48

49
50

51
52

53
54

55
56

Porcelin Glazed wall tile 6"x4"


Porcelin Glazed floor tile 6"x4"
3 mm marble chips(~1450kg/cum)
Oxalic acid

sq.m.
sq.m.
cu.m.
kg

"
"
- 1"
HDP pipe
- 0.5"
"
- 4" (110mm)
Water tank Gintex or equivalent

kg
m2
kg
kg
kg
kg
litre
litre
litre
litre
kg
litre
kg
nos
nos
Rm.
Rm.
Rm.
Rm.
Rm.
Rm.
litre

Diesel
Petrol
Kerosene oil
Price of truck
Bitumin 80/100

litre
litre
litre
no.
Kg

57
10.00

58

70

Wax polish
Marble
Lime
Snowcem(cem. paint)
Snowcem(cem. paint)
Febicol Adhesive
Enamel
Varnish
Aluminium paint
Tarpentile
Water proof compound
Primer wood
Red oxide
Sand paper

71

Karborandum stone

72

GI pipe 'B' class - 1/2"


"
"
- 3/4"

59
60

61
61
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

Nut bolt 8mm


J - hook
Bitumen washer
Nut bolt with washer
Mosquito net - Indian

62

63
64

65
66

67
68

69

73
74

75
76

77
78

79
80

81
82

83
84

-69
Rate

138.00

0.6
Excavation in Roadway, Drain and foundation for Unskilled m.d.
gabion & dry wall structures in hard soil including Equipment
removal & satisfactory disposal of the materials
upto a lead of 50m
3%of labour
Item No.per
Sub-Total
3
1 cu.m.
Contract Rate (1.15)
Norms -Dolidar 5.b Page 21
U.Rate without VAT cu.m.
E/W exca. in Roadway & Drain : Hard Soil
per

Analysis of Rate
Laying sub-base course of sand mixed gravel
(loose) including

unkilled
Gravel
Roller

m.d.
cu.m.
hrs.

0.155859
0.1575
0

270

162

4.86
166.86

270
800
844.25

42.08
126
0

Item No.per
35
1 sq.m.
Norms -NG.15(9) c.Page 129
Gravelling loose without rolling 15 cm thickness

Sub-Total
Contract Rate (1.15)
U.Rate without VAT sq.m.
per

Dry stone laying (soling) without sand

skilled
m.d.
1
Unskilled m.d.
3.5
stone
cu.m
1.1
Sub-Total
Contract Rate (1.15)
U.Rate without VAT cu.m.
per

450
270
750

skilled
m.d.
1
Unskilled m.d.
3.5
stone
cu.m
1.1
Sand
cu.m
0.25
Sub-Total
Contract Rate (1.15)
U.Rate without VAT cu.m.
per

450
270
750
2300

450
945
825
575
2795
3214.25
3214.25

450
270
71500
105

5400
3240
75075
1050
84765

Item No.per
3.1
1 cu.m.
Norms - 11(16) page 107
Stone soling in sand
Dry stone laying (soling) in sand

Item No.per
3.1
1 cu.m.
Norms - 11(16) page 107
Stone soling in sand

1067.175
1067.175

Cutting, bending, placing in position as shown in tskilled


m.d.
drawing & binding by GI wire of reinforcement steUnskilled m.d.
bar for RCC works incl. haulage dist. upto 30m Rebars
m.t.
bind.wire kg
Item No.per
Sub-Total
5.5
1000 kg
Contract Rate (1.15)
Norms-7.5 page 47
U.Rate without VAT kg
Iron rod( TOR steel) for RCC
per

12
12
1.05
10

Cement Concrete Works (1:2:4) for RCC in


Superstructure (Using Crushed Aggregate)

0.75
4.56
6.4
0.52
0.22
0.11

Gravel_1 =40 mm gravel crushed


Gravel_2 =20 mm gravel crushed

skilled
unkilled
cement
gravel_1
gravel_2
gravel_3

m.d.
m.d.
bag
cu.m.
cu.m.
cu.m.

450
945
825
2220
2220

87.165

450
270
670
1700
1800
2000

337.5
1231.2
4288
884
396
220

Gravel_3 =10 mm gravel crushed


Item No.per
17
1 cu.m.
Dolidar 41.B.a
Page 46,47
PCC for RCC (1:2:4)

sand
cu.m.
0.44
Sub-Total
Contract Rate (1.15)
U.Rate without VAT cu.m.
per

2300

Excavation in Roadway, Drain and foundation for ga


Unskilled m.d.
0.6
Equipment
3%of labour
Item No.per
Sub-Total
3
1 cu.m.
Contract Rate (1.15)
Norms -Dolidar 5.b Page 21
U.Rate without VAT cu.m.
E/W exca. in Roadway & Drain : Hard Soil
per

270

1012
8368.7
0
8368.7
162
4.86
166.86
166.86

Chimney (bhatta) brick masonry


supplying bricks making cement
construction of brick wall includi
upto 30m

skilled
m.d.
1.5
Unskilled m.d.
2.2
Brick
nos.
560
Cement m.t.
0.1
Sand
cu.m
0.28
a) 1:4
Add.unskillm.d.
0.2
Scaffolding3% of add. Unskilled
Item No. per
Sub-Total
2.4a
1 cu.m.
Contract Rate (1.15)
Norms - 5(1.b2 & 2a) page 32,33U.Rate without VAT cu.m.
Brick work in c.m. - 1:4
per

450
270
10.5
15000
1800
270

675
594
5880
1500
504
54
1.62
9208.62
10589.91
10589.91

Chimney (bhatta) brick masonry works a skilled


m.d.
1.50
270.00
supplying bricks making cement sand mo Unskilled
m.d.
2.20
10.50
construction of brick wall including hau
Brick
nos.
560.00 Err:509
upto 30m
Cement
m.t.
0.10 Err:509
Sand
cu.m
0.28 Err:509
a) 1:4
Add.unskill
m.d.
0.20 Err:509
Scaffolding 3% of add. Unskilled
Item No.
per
Sub-Total
2.4a
1
cu.m.
Contract Rate (1.15)
Norms - 5(1.b2 & 2a) page 32,33
U.Rate without VAT
cu.m.
Brick work in c.m. - 1:4
per

405.00
23.10
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Excavation of hard clay and soils mixed Unskilled


moorum stones (upto 30mm size) includiEquipment
upto 10m lead and 1.5m lift
3%of labour
Item No.
per
1.2
1
cu.m.
Norms - 2(2) page 5
Earthwork in excav. : B.M.Soil

m.d.

Sub-Total
Contract Rate (1.15)
U.Rate without VAT
per

Concreting of foundation, vertical faces


skilled
m.d.
concrete) including supply materials and Unskilled
m.d.
distance upto 30m
cement
m.t.
a) P.C.C.(1:2:4)
gravel_1
cu.m.
Gravel_1 =40 mm gravel crushed
gravel_2
cu.m.
Gravel_2 =20 mm gravel crushed
gravel_3
cu.m.
Gravel_3 =10 mm gravel crushed
sand
cu.m.
Item No.
per
Sub-Total
5.2
1
cu.m.
Contract Rate (1.15)
Norms-7.2(d) page 44
U.Rate without VAT
P.C.C. - 1:2:4
per

0.80

270.00

216.00
6.48
222.48

cu.m.

1.00 Err:509
4.00 Err:509
0.32 Err:509
0.52 Err:509
0.22 Err:509
0.11 Err:509
0.445 Err:509

cu.m.

222.48

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Gabion fabricatiomn (2x1x1) box size with Hexagonal


skilled
m.d.
mesh size 80x100mm, Meshwire 11 SWG,Salvagewire
unkilled
m.d.
8 SWG and assembling of crates, gabions and placing
Mesh wire
Kg
them in position including strectching, binding together
Salvagewire
Kg
and tying down lid with 13SWG binding wire including
Bindingwire
Kg
diaphragm
Item No.
per
Sub-Total
18
1
box
Contract Rate (1.15)
Dolidar 41.1A ii a Page 49
per box =10 sqm U.Rate without VAT
Gabion Box 2x1x1m
per

0.19
0.38
23.10
2.40

per box
per sqm.

600.00
400.00
94.00
94.00
94.00

114.00
152.00
2171.40
225.60

2663.00
3062.45
3062.45
306.25

13780
459.3333
57.41667