OUTLINE ATA No. LEVEL DURATION PHASE ‘A’ BK-1 III 30 Hours General Familiarization………………….. (5Hrs) (ATA-00) Servicing………………………………….. (4Hrs) (ATA-12) Electrical Power………………………….. (6Hrs) (ATA-24) Fire Protection……………………………. (4Hrs) (ATA-26) Fuel system………………………………..(4Hrs) (ATA-28)
PHASE ‘B’ BK- 2, 3, 4 30 Hours
Pneumatic System…………………….. (2)(5Hrs) (ATA-36) III Indicating and Recording Sys………… (2)(4Hrs) (ATA-31) III Lights……………………………………… (2)(3Hrs) (ATA-33) I Automatic Flt. Control system………… (3)(4Hrs) (ATA-22) I Communication system ………………… (3)(4Hrs) (ATA-23) I Navigation System ……………………… (4)(3Hrs) (ATA-34) I
PHASE ‘C’ BK- 5 (36Hrs) III 36 Hours
General Engine introduction…………………………………………. (ATA-70) Engine Control………………………………………………………… (ATA-70) Engine Fuel & Control…………………………………………………(ATA-73) Engine Oil system…………………………………………………… (ATA-79) Engine Air System……………………………………………………..(ATA-75) Engine Indicating and Recording System…………………………. (ATA-77) Engine ignition & Starting System …………………………………. (ATA-74 & 80)
PHASE ‘D’ BK- 6 (24Hrs) III 24 Hours
Propeller Systems……………………………………………………. (ATA-61)
PHASE ‘E’ BK- 7, 8 III 42 Hours
Hydraulic Power………………………......(7)(7Hrs) (ATA-29) Landing Gear Systems. ………………….(7)(14Hrs) (ATA-32) Flight Control Systems ………………… (8)(14Hrs) (ATA-27)
PHASE ‘F’ BK- 9, 10 III 48 Hours
Equipment and Furnishing……………….(9) (5Hrs) (ATA-25) Ice and Rain Protection…………………..(9)(5Hrs) (ATA-30) Oxygen system…………………………… (9)(5Hrs) (ATA-35) Water and Waste System……………….. (9)(4Hrs) (ATA-38) Airconditioning & Pressurization ………..(10)(8+5Hrs) (ATA-21) Structure …………………………………..(10)(5Hrs) (ATA 50) Doors……………………………………….(10)(4Hrs) (ATA-52)