Inspect of all incoming insulation material; Handling, Storage and Preservation on arrival of new material to the warehouse and onsite location Review of quarantine area; Check Clearance to start insulation works; Check Released for Insulation: (1) Piping Pressure Test Completion, (2) Equipment Installation Completion, (3) Instrumentation Installation and Pressure Test Completion, (4) Heat Tracing (Steam/Electrical) Installation and Testing Completion, (5) Visual check, (6) Surface Condition and damage, (7) Touch-up Painting; Check Drawings and Piping Line list for Thermal Insulation to clarify Hot, Cold, PP, Acoustic Insulation; Check Installation of insulation material; Check Expansion and Contraction Joints, External jacketing/Metal weatherproofing installation; Check Sealing material application; Check Accessories and Attachment Materials Installation check; Check Vapor barriers installation (if it is Cold Insulation); Visual Appearance of insulation completeness; Verification of correct recording of acceptance report and inspection form.
PFP (Passive Fire Protection) activities:
Approval of light concrete gunned fireproofing e.g. Fendolite or Pyrocrete;
Preparation of Mockup (Sample); Approval of galvanized weld mesh; Instruments calibration of Gun system and Thickness gauge; Check of Ambient temperature, Humidity, Batch times (Bill of load) and pouring times, Slump test;
Check of mesh fixing and overlap
Verification of correct recording of acceptance report and inspection forms